1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,

Slides:



Advertisements
Similar presentations
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Honoraria for Design Build Projects Methodology Assessment Matrix.
1 BROOKHAVEN SCIENCE ASSOCIATES Laboratory Office Building (LOB) Design Ove Dyling Assistant Director for Design Management CFAC Review November 9 – 10,
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
SCRF ACCELERATOR INDUSTRY STEWARDSHIP OUTLOOK Ken Olsen SPAFOA Fermilab Meeting Nov. 13, 2012.
PennDOT CNG Fueling Stations P3 Project for Transit Pennsylvania Public Transportation Association Conference April 8, 2015 Pennsylvania.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director Experimental.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
Click to edit Master title style Click to edit Master subtitle style PBC Lessons Learned A Contractor’s Perspective June 29, 2005 Tushar Talele ARCADIS.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
University of Toronto Mississauga Campus: UTM Master Plan Update Campus and Facilities Planning | March University of Toronto Mississauga Campus.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
Maintenance Review 2004 A review of the procurement of repair and maintenance works for Hertfordshire County Council.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Commodity Node Procurement Process Task Force: Status Stephen Wolbers Run 2 Computing Review September 13, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
Aug. 22, 2007 CF7S Americas EDR Kick-Off A&E Selection the Fermi Process Tom Lackowski.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Anthony Guadagni NSLS-II Procurement Manager March 25, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Beamline Development and Facility Usage.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
The Contract Management Process Post Award Activities.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David Dale Procurement Manager CFAC Status Meeting May 8, 2008.
Conventional Facilities Jan Molander Design Manager Conventional Facilities December 10, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Conventional Facilities (WBS 1
Details supporting the increase
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Conventional Facilities
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES Outline LOB Current baseline Advancing LOB Schedule LOB Program LOB Procurement Site Master Plan Development

3 BROOKHAVEN SCIENCE ASSOCIATES LOB Current Baseline Scope – LOBs 1&5 fully built out, LOB 4 shelled - ~24,000 GSF ea. LOB Design Start Jan 2010Complete Jan 2011 LOB Procurement Award Oct 2011 LOB Construction Start Nov 2011Complete Aug 2013 Construction of LOBs would begin after building envelope is complete and Pentant is occupied requiring temporary closure of exterior Ring Building Contractor has indicated ideal time for LOB start would be ~mid FY10 from constructibility standpoint as well as efficiency

4 BROOKHAVEN SCIENCE ASSOCIATES Advancing LOB design To improve constructability and efficiency propose to advance LOB design and construction Also resolves final CF bid uncertainty ~2yrs early Currently confirming existing program basis for LOBs with XFD before tasking A/E with design Accelerated design & construction schedule could be: LOB Design Start - April 09Complete – Sept 09 LOB Procurement Award – Jan2010 LOB Construction Start - Mar 2010Complete April 2012 Resulting design period is compressed but manageable per HDR

5 BROOKHAVEN SCIENCE ASSOCIATES Lab-Office Building Program Lab Office Building - each nominally has: 72 Offices 6 labs Machine shop 4 Conference Rooms Loading/storage area

6 BROOKHAVEN SCIENCE ASSOCIATES LOB Procurement LOB Procurement Issues: Having two different contractors performing Ring Bldg & LOB significantly increases potential for claims & delays but a >$25M procurement must be competitive Advancing schedule compresses time for procurement to 4 months Procurement >$25M requires DOE-HQ review & approval RFP best value methodology worked well for Ring Building but requires more time to evaluate & approve IFB could be quicker but increases potential for less qualified firm to win award introducing added risk Proposed approach - Proceed with RFP methodology Previous experience with RFP and approval will streamline review/approval process It is more important to accept some delay if needed then to have less qualified contractor

7 BROOKHAVEN SCIENCE ASSOCIATES Site Master Plan Development NSLS-II has always recognized potential for growth and development of additional facilities on the site JPSI – NY state funded $30M project ($10M funded) Other research agency facility requirements Varied User community and program needs may result in added facility requirements Potential for Life Sciences LOB and/or support bldg Transition to Operations Plan development underway this year Will assess adequacy of existing NSLS to support long term mission needs May identify additional facility requirements BNL still sorely lacks suitable on-campus short term residence facility Given majority of visiting Users, this would ideally be near NSLS-II

8 BROOKHAVEN SCIENCE ASSOCIATES Site Master Plan Development Currently working with HDR on Site Master Plan to confirm existing layout supports all reasonable potential changes May identify some site layout (parking & roadway) modifications that would be prudent for flexibility May require some utility modifications (piping size and future connection provisions) Want to complete this effort soon (say May) to minimize potential site development and utility design changes

9 BROOKHAVEN SCIENCE ASSOCIATES Site Master Plan Development Sample Site Plan Showing Potential Added Facilities

10 BROOKHAVEN SCIENCE ASSOCIATES Building Utilities Plan

11 BROOKHAVEN SCIENCE ASSOCIATES Issues & Potential Challenges LOB advancement puts added demand on CF team at critical time and increases overlap of two different contractors but potentially yields numerous benefits Are we selecting the optimum procurement method? Uncertainty over how many, what size and when for potential added facilities to account for in existing Site Master Plan To what extent do we try to accommodate in current design & Ring Bldg contract?