Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.

Slides:



Advertisements
Similar presentations
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Advertisements

The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan 1.Introduction 2.Recent.
1 H-Cal front-end ASIC Status LAL Orsay J. Fleury, C. de la Taille, G. Martin, L. Raux.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
SiPM readout for ECAL Lausanne PEBS ECAL meeting, Lausanne 30. April 2009.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group May 29 – Jun 4 DESY Introduction.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
Scintillator-based ILC detector R & D Status and Milestone DongHee Kim Kyungpook National University Joint Korea-Japan Collaboration KPS meeting, Spring.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) Feb Beijing Introduction Basic performances Future.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
MPPC Saturation Corection Idea -> how to do. MPPC Gain measurement To apply saturation correction to the beam data, all MPPC are needed to be calibrated.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
The Multi-Pixel Photon Counter for the GLD Calorimeter Readout Jul Satoru Uozumi University of Tsukuba, Japan for the GLD Calorimeter.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Brief report on May 09 running with ScECAL and AHCAL S. Uozumi (Kobe) Jun CALICE TB meeting.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
STATUS OF SPIROC measurement
CTA-LST meeting February 2015
CALICE meeting 2007 – Prague
ScECAL+AHCAL+TCMT Combined Beam FNAL
Scintillator HCAL readout
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
STATUS OF SKIROC and ECAL FE PCB
Installation and Run Plan
BESIII EMC electronics
CALICE meeting 2007 – Prague
E. Garutti - Main Meeting
Testbeam analysis on module #1
Scintillator HCal Prototype
R&D of MPPC in kyoto M.taguchi.
Presentation transcript:

Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting

My DESY Learn about CALICE Analog HCAL (AHCAL) readout electronics –Actual operation of the DAQ system –Confirm it has satisfactory performance for the GLD ECAL beam test Gain of ASIC amp Pedestal – 1 p.e. peaks separation with the MPPC Bias voltage setting for individual MPPC Dynamic range of the Amp and ADC Separation of noise and MIP peak Data analysis –Basic analysis scheme with the CALICE analysis framework –Learn something from actual AHCAL analysis Other stuffs –Movable stage, LED monitor, Drift chambers, trigger counters, Integrating temperature monitoring etc…

CRC board (in VME crate) AHCAL module To DAQ PC HV supply (up to 100 V) To Slow-control PC Baseboard (6 analog boards mounted, 6 board x 18 chan. = 108 chan. ) GLD ECAL module FPCB Scheme of the Readout Electronics

Analog Board ASIC scheme 100nF 10pF Charge Preamplifier :  Low noise :  Variable gain : 4bits : 0.67 to 10 V/pC CR-RC² Shaper : Variable time constant:4 bits (12 to 180ns) 12ns  photoelectron measurement (calibration mode) 180ns  Mip measurement (physics mode) 12kΩ 4kΩ 24pF 12pF 3pF in 8pF4pF2pF1pF 40kΩ 8-bit DAC 0-5V ASIC Rin = 10kΩ 50Ω 100MΩ 2.4pF 1.2pF 0.6pF 0.3pF 0.1pF 0.2pF 0.4pF 0.8pF 6pF

Gain of the ASIC Amp We have 2 different modes under current setting : 1. Physics mode … lower gain, large dynamic range Can not see the ped – 1 p.e. peaks separation 2. Calibration mode … high gain (~x20 of physics mode) Can see the peak separation We can choose the mode for each individual run. Inter-calibration of the gain between these 2 modes is necessary. Will be performed in MIP calibration run? We can choose some other gains if we request, though I think current setting for AHCAL is useful enough. MIP calibration run (Each with phys. and calib. mode) Pedestal run (Each with phys. and calib. mode) Beam run (Physics mode) Pedestal run (Each with phys. and calib. mode) …… MIP calibration run (Each with phys. and calib. mode) …… LED calibration run (Each with phys. and calib. mode)

Pedestal – 1 p.e. Peaks Separation (Calibration mode) Coaxial ~ 2 m To HCAL baseboard MPPC Clear fiber LED V bias – V 0 = 1.95 V V bias – V 0 = 2.95 V

Dynamic range (Physics mode) Pedestal (~1123 ADC counts) Saturated MPPC Signal (~20220 ADC counts) ( ) / 226 * 19.1 = 1603 pixels Distance between pededestal – 1p.e. In Calibration mode Ratio of Gains between calib. and physics mode Dynamic range is enough for 1600 pixels !! V bias – V 0 = 2.95 V

Bias Voltage Control We can set value of the DAC output for each individual channel with ~0.02 V step (5 V / 8 bit = 5 V / 256 count = 0.02 V / count) Need to prepare a text table which contain DAC counts for all the channels HV supply To Slow-control PC 8 bit DAC (0-5 V) To MPPC 80V -0.96V = V Baseboard single channel

Movable stage Can be controlled from Slow- control PC with user-friendly GUI. Specify position with 0.1 mm step

Data & Analysis The data are stored with a binary format on dcache system. Expected raw data size (with 6 baseboards) is about 5 kB / events. (very rough estimate, with +- 50% of uncertainty) We can access to the binary data using the Marlin analysis framework. –Similar to CDF Run II analysis framework (my feeling) –Need C++ basics –

Raw binary data LCIO data User analysis modules Database Detector geometry, alignment, mapping, etc … Plots, Ntuples, …. Analysis scheme We need to request for database entry for our ECAL module Need to prepare codes for detector geometry, mapping. We also need to give a “Prefix” of our detector which is used as identifier in the analysis module (like AHCAL) I propose “SCECAL” (SCintillator ECAL) for the prefix. (e.g. our calibration constants will be named SCECAL_CALIB on database) Marlin framework

My DESY Learn about AHCAL readout electronics –Actual operation of the DAQ system – Done –Confirm it has enough performance for the GLD ECAL beamtest – Done Peaks separation with the MPPC – Done Gain of ASIC – Done Bias voltage control for individual MPPC – Done Dynamic range – Done Separation of Noise and MIP peak – may be tested in this week Data analysis –Basic analysis scheme with the CALICE analysis framework - Done –Learn something from actual AHCAL analysis - ongoing Other stuffs –Movable stage - Done –Drift chambers – readout modules are now at CERN should be easy to operate –Trigger counters – Should be no problem (need a beam to check) –LED monitor - Difficult to integrate AHCAL system into GLD ECAL module –Integrate temperature monitoring into DAQ PC –Any Other ?

DESY Felix... The head Erika... Expert of everything in CALICE group Beni … Expert of the AHCAL DAQ electronics and analysis contact person of the GLDCAL beam test at DESY Sebastian … Expert of software package Niels … Expert of AHCAL analysis code Nicola … Expert of SiPM / MPPC Alexandra … Expert of SiPM / MPPC They are really nice, and of course, very reliable !

Summary The AHCAL electronics and DAQ system have good performance satisfactory for the GLD ECAL beam test. (There is still a concern about noise on FPCB, though) Moreover we have many reliable experts at DESY. Any other stuff at DESY (movable stage, triggers, drift chambers…) are OK. People who will attend to the beam test may need to be familiar with the caliceMarlin analysis framework.

Plan for this week AHCAL people may perform a test with positron beams. (test of forward-backward asymmetry of the AHCAL module) Attending this test would be a good exercise with the actual beam. I am requested to give a talk at DESY HCAL meeting in Thursday. I will give : –10 minutes talk –brief introduction of GLD ECAL beam test –My task and achievement at DESY –Lots of appreciation Then as long as time permits, I will learn about the actual analysis of AHCAL beam test data.