Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.

Slides:



Advertisements
Similar presentations
Project Quality Management
Advertisements

Quality Planning Tools PMI Westchester Quality SIG Pawan Kumar, Quality SIG Member, PMP November 2007.
Project Quality Management
ISO 9001:2000 Documentation Requirements
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
QUALITY ASSURANCE AND IMPROVEMENT PROGRAM (QAIP)
Project Change Management
The ISO 9002 Quality Assurance Management System
Stepan Potiyenko ISS Sr.SW Developer.
Overview Lesson 10,11 - Software Quality Assurance
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Project Management Quality Management* Dr. Khalid S. Husain * 07/16/96
Chapter 8: Quality Management Project Quality Management
1 Assessment: Audits. Assessment: Audits - Module 9 2 Learning Objectives At the end of this activity, you will be able to: Develop a process to prepare.
Project Management based on the Project Management book of knowledge Risk Identify, analyse and respond to risks Resources Make most effective use of human.
Project quality management (PMI body of knowledge)
SOFTWARE PROJECT MANAGEMENT Project Quality Management Dr. Ahmet TÜMAY, PMP.
Hazard Analysis and Critical Control Points
AUDITS AND INSPECTIONS
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
QMS ISO 9001:2008 Introduction to QMS 9001:2008 and system auditing.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
The Value of Using the Process Approach for Internal Auditing Frank Sidorowicz TL 9000 Program Director Orion Registrar, Inc.
Ships in Service Training Material A-M CHAUVEL QMS Terms & Definitions 2009.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
Software Quality Assurance Activities
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Quality Control Project Management Unit Credit Value : 4 Essential
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Project Management Gaafar 2006 / 1 * This Presentation is uses information from PMBOK Guide 2000 Project Management Quality Management* Dr. Lotfi Gaafar.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Important informations
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Quality Assurance vs Quality Control
Software Project Management Lecture # 12. Outline Chapter 26 – Quality Management  What is Quality?  Meaning of Quality in Various Context  Software.
QUALITY ASSURANCE MANAGEMENT CONTROLS Chapter 9. Quality Assurance (QA) Management is concerned with ensuring: 1) The information system produced by the.
Purpose of audit is to provide assurance that: Procedures for attaining quality are such that, if followed, the intended quality will be obtained.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Quality system With no system of quality control how do you distinguish between the good, the bad and the ugly? quality assurance is all the planned and.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
TOTAL QUALITY MANAGEMENT
SE513 Software Quality Assurance Lecture12: Software Reliability and Quality Management Standards.
Advanced Project Management Project Quality Management Ghazala Amin.
Process Auditing Why do people think that this is something new? Presented by Kevin Gilson, Orion Registrar, Inc. For the ASQ ISO Users Group October 8,
0 SoMD PMI Training Bruce Schwickrath PMP 3/19/2008 Quality and the QMP and QCP Quality Management Plan (QMP) Quality Control Plan (QCP) SoMD PMI Training.
Project Management PTM721S
SQA project process standards IEEE software engineering standards
Project Quality Management
Software Quality Control and Quality Assurance: Introduction
Project Management PTM721S
Project quality.
Software Quality Engineering
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
So where in ISO is Process?
SQA project process standards IEEE software engineering standards
Software Quality Engineering
Project Management Managing Project Execution
SYSTEMS ANALYSIS Chapter-2.
UNIT V QUALITY SYSTEMS.
PROJECT QUALITY MANAGEMENT Teknik Elektro FT UNDIP
Project quality management (PMI body of knowledge)
What is Project Quality Management?
CIS12-3 IT Project Management
Project Quality Management
Process Auditing Why do people think that this is something new?
Presentation transcript:

Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin

Focusing on customers is not just a quality issue in any project; it is sound business practice. Customer Satisfaction translates directly into increased profits.

WHY IS IT IMPORTANT TO MEET CUSTOMER EXPECTATIONS? Needs of customers have to be met Understanding of one’s customers leads to customer satisfaction Japanese relate quality to customer satisfaction Poor Quality Project Inadequate internal facilities Poorly designed processes

Quality Assurance The process of evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards.

QUALITY ASSURANCE THERE ARE NO FACTS ONLY INTERPRETATIONS -FRIEDRICH NIETZSCHE Any action directed towards providing consumers with products (goods & services) of appropriate quality

Quality Control Quality Control is the process of monitoring specific project results to determine if they comply with relevant quality standards The organizational unit that is assigned responsibility for quality control.

Quality Assurance vs Quality Control Reference: Dr. Harold Kerzner’s PROJECT MANAGEMENT A SYSTEMS APPROACH TO PLANNING, SCHEDULING, AND CONTROLLING Page 988 and 989: QUALITY ASSURANCE AND QUALITY CONTROL

Quality Assurance The organizational unit –”Quality Assurance” team that is assigned the responsibility for assuring quality. Internal quality assurance: assurance is provided to the project management team and to the management team of the performing organization. External quality assurance: assurance is provided to the customer and others not actively involved in the work of the project.

Quality Assurance Quality assurance is the planned and systematic activities implemented within the quality system to provide confidence that the project will satisfy relevant quality standards Project Manager can have greatest impact on the quality of his project by establishing process and procedures to assure that scope statement conforms to the actual requirement of the customer.

Quality Assurance - Inputs Some mandatory inputs to quality assurance should be; Quality management plan Quality management plan should be used as a road map to guide the QA team with enforcing processes and procedures. Results of quality control measurements records of quality control testing and measurement in a format for comparison and analysis.

Quality Audit The method most commonly employed for enforcing the Quality Assurance process is; Quality audits A structured review of all quality management activities.

Quality Audit The objective of a quality audit is to identify lessons learned that can improve performance of this project or of other projects within the performing organization. May be scheduled or random; may be carried out by trained in-house auditors or by third parties such as quality system registration agencies.

Quality Assurance - Output Quality Assurance Audits results in; Quality improvement Includes taking action to increase the effectiveness and efficiency of the project to provide added benefits to the project stakeholders. In most cases will require preparation of change requests or taking corrective action and will be handled according to the procedures for integrated change control.

Table 8-1. Table of Contents for a Quality Assurance Plan* 1.0 Draft Quality Assurance Plan 1.1 Introduction 1.2 Purpose 1.3 Policy Statement 1.4 Scope 2.0 Management 2.1 Organizational Structure 2.2 Roles and Responsibilities 2.2.1 Technical Monitor/Senior Management 2.2.2 Task Leader 2.2.3 Quality Assurance Team 2.2.4 Technical Staff 3.0 Required Documentation 4.0 Quality Assurance Procedures 4.1 Walkthrough Procedure 4.2 Review Process 4.2.1 Review Procedures 4.3 Audit Process 4.3.1 Audit Procedures 4.4 Evaluation Process 4.5 Process Improvement 5.0 Problem Reporting Procedures 5.1 Noncompliance Reporting Procedures 6.0 Quality Assurance Metrics Appendix Quality Assurance Checklist Forms *U.S. Department of Energy

Technique to Control & Check Quality Quality Control Technique to Control & Check Quality

Quality Control Quality Control is the process of monitoring specific project results to determine if they comply with relevant quality standards The organizational unit that is assigned responsibility for quality control.

Quality Control Quality control involves monitoring specific project results to determine if they comply with relevant standards and identifying ways to eliminate causes of unsatisfactory results Project Team members with specific technical expertise setup process and procedures to ensure each step of project provides quality output from design and development through implementation and maintenance.

Quality Control Some Inputs to the Quality Control Process are; Work results Quality management plan Operational definitions Checklists

Quality Control Some Tools & Techniques used are; Inspection Control charts Pareto diagram Statistical sampling Flowcharting Trend analysis

Quality Control Inspection: Includes activities such as measuring, examining, and testing undertaken to determine whether results conform to requirements. May be conducted at any level (e.g., the results of a single activity may be inspected or the final project product). May be called reviews, product reviews, audits, and walkthroughs.

Quality Control - Outputs Results in; Quality improvement Acceptance decisions Decisions to either accept or reject the inspected items. Rejected items may require rework. Rework

Quality Control - Outputs What is Rework? Rework Action taken to bring a defective or nonconforming item into compliance with requirements or specifications. Rework, especially unanticipated, is a frequent cause of project overruns in most application areas. The project team should make every reasonable effort to minimize rework.

Quality Control – Outputs Process adjustments Immediate corrective or preventive action as a result of quality control measurements. In some cases, the process adjustment may need to be handled according to procedures for integrated change control.

Scope Verification vs Quality Control Scope verification is primarily concerned with the acceptance of work results Quality control Quality Control is primarily concerned with the correctness of work results.