Task DA-07-04 Sensor Web Enablement Presented by: Terence van Zyl

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEOSS ADC Architecture Workshop Breakout Session 1b: Inter-calibration Scenario - Stephen Ungar Hosted by the European Commission At the Joint Research.
Integrated Risk Management Components in the GEO Architecture Implementation Pilot Phase 2 (AIP-2) ICT for Earth Observation Anwar Vahed.
GEOSS ADC Architecture Workshop: Sensor Web Ingo Simonis iGSI
1 Spiral 1 Requirements Demonstrate GENI Clearinghouse & control framework in Spiral 1 projects as a central GENI concept. Demonstrate End-to-end.
1 AG-07-03: Data Integration Recommendations The GEOSS Secretariat / ADC to support: –Development of an international moderate (30m) resolution data initiative,
WGISS 1 WGISS-GEO Discussions Martha E. Maiden CEOS WGISS-24 Oberpfaffenhofen, Germany October 15~19, 2007.
Sensor Web Enablement and GEOSS Presented by: Terence van Zyl.
WGISS 1 Technology and Services Subgroup Liu Dingsheng and Natalia Kussul CEOS WGISS-24 Oberpfaffenhofen, Germany October 15~19, 2007.
Task CB-07-01a: Capacity Building Symposium:. 12 February 2014© GEO Secretariatslide 2 Objectives Highlight GEO process in support of sustainable development.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
GEO Work Plan Symposium 2011 Days 2 & 3 ID-01 Data Sharing.
Core Task Status, AR Doug Nebert September 21, 2008.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
The GEOSS Science and Technology Stakeholder Network: A spin-off of the EGIDA Project Hans-Peter Plag, Ian McCallum, Steffen Fritz, Shelley Jules-Plag,
© GEO Secretariat Virtual Constellations..new planning process which takes account of international users and their requirements from the outset of satellite.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEOSS Common Infrastructure (GCI)
Earth Observation Envelope Programme Earthnet / Third Party Missions EarthWatch programme ERS & ENVISAT Missions The Living Planet Programme Meteo missions.
Community engagement Implementing NICE guidance 2008 NICE public health guidance 9.
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
1 DA POC/Lead: Doug Nebert (USGS) Lead: Martha Maiden (NASA) Facilitate the development, availability and harmonization of data, metadata, and products.
1 Publishing Linked Sensor Data Semantic Sensor Networks Workshop 2010 In conjunction with the 9th International Semantic Web Conference (ISWC 2010), 7-11.
World A virtual space for real people. World ETH World: a strategic program of ETH Zurich ETH World is a program to establish a virtual space for communication.
1 EnviroGrids: Building Capacity for a Black Sea Catchment Observation and Assessment System supporting Sustainable Development Nicolas.
SMOS Workshop May Copenhagen, DK Development of a Global In-Situ Soil Moisture Network P.J. van Oevelen T.J. Jackson And many others!!
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
WP5 Synthesis, recommendations and defining of the SRA Karel Charvat, Sarka Horakova, Ota Cerba WirelessInfo.
DA Sensor Web Enablement for In-Situ Observing Network Facilitation.
4th GEOSS Science and Technology Stakeholder Workshop CONCEPTS, TECHNOLOGIES, SYSTEMS AND USERS OF THE NEXT GEOSS.
Task DA Sensor Webs Enablement for In-Situ Observing Network Facilitation Dr. Jay Pearlman Presentation to ADC May 14, 2007.
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
© Geospatial Research & Consulting  Ingo Simonis Ingo Simonis Geospatial Research & Consulting Meraka/CSIR.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
GeoHazards International Some Thoughts on the Use of Seismographic Networks to Promote Global Earthquake Risk Management Brian Tucker GeoHazards International.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
CEOS WGISS Status: Report to Plenary Martha E. Maiden, Chair Pakorn Apaphant, Vice-Chair Phuket, Thailand November 3 - 4, 2009.
NGCWE Expert Group EU-ESA Experts Group's vision Prof. Juan Quemada NGCWE Expert Group IST Call 5 Preparatory Workshop on CWEs 13th.
GEOSS Architecture for the Use of Satellites for Disaster Management and Risk Assessment Karen Moe/NASA Earth Science Technology Office Presented at CEOS-WGISS-32.
2 nd APAN eScience Committee Meeting January 30, 2004.
ATT Contribution to GEO Archive Task Team WGISS – 22 Sep 11 – 15, 2006 Annapolis, USA.
ADC Portal & Clearinghouse GEO Architecture and Data Committee 2-3 March 2006 George Percivall OGC Chief Architect
1 DA POC/Lead: Doug Nebert (USGS) Leads: George Percivall (OGC) Rita Almeida Ribeiro (HOLOS, Portugal) Ken Masarie (NOAA) Martha Maiden (NASA) Jimmy.
PORTFOLIO CD COVER examples IMS Portfolio Workshop Spring 2012.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-6 prepared by Hans-Peter Plag (IAG/GGOS)‏ Nevada Bureau of Mines and Geology and Seismological.
Data Services Task Team WGISS-22 meeting Annapolis, the US, September 12th 2006 Shinobu Kawahito, JAXA/RESTEC.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
ENEON first workshop Observing Europe: Networking the Earth Observation Networks in Europe September, Paris ENEON definition, criteria, processes.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
Session 1: Technology Development August 15 NSF Workshop.
Integration of data and on- demand data products generation Ingo Simonis – OGC Europe GEOSS Future Products Workshop Silver Spring, MD March 2013.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
OGSA Roadmap OGSA spec (Concepts and Fundamentals) OGSA Use Cases Scenarios Service Description Candidate Profile Profile Actual specs consistent inform.
Albert I. Reuther & Joel Goodman HPEC Sept 2003
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
Community Portal Interactions with GEOSS GEO-XII Plenary November 9, 2015 Ken McDonald/NOAA
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Closure of WGCV actions (CV-01; CV-09; CV-13; CV-16)
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Report on the 2008 meeting in Bled
General Information on the Partnership Centre for IODE Ocean Data Portal Dr Sergey Belov, et al. Partnership Centre for the IODE Ocean Data Portal Review.
Presented by Derek Bistline
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Presentation transcript:

Task DA Sensor Web Enablement Presented by: Terence van Zyl

/ 2 Goal Design of a distributed infrastructure for sensor networks and the Sensor Web Integration of existing & future sensor networks in GEOSS Set up of the Sensor Web as a base layer for GEOSS services and components

/ 3 Approach Scenarios and use cases Invite existing sensor networks Integrate existing sensor networks Best practices for future networks

/ 4 Actions Initial use cases designed Inventory and recommendations around new and existing standards Set up of Sensor Web dictionaries

/ 5 Actions II Workshop Spring 2008 Promote Sensor Web concept Invite established sensor networks space agencies others?