Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group 2002-01-28 - 2002-01-29.

Slides:



Advertisements
Similar presentations
Your business pitching templates MedVentures A N INITIATIVE BY ANIMA I NVESTMENT N ETWORK & THEIR PARTNERS.
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advanced Piloting Cruise Plot.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2002 Pearson Education, Inc. Slide 1.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
Cultural Heritage in REGional NETworks REGNET January 2002PMG03 Barcelona – Management Issues 2 Management Issues 0ctober 2001 – January 2002.
Cultural Heritage in REGional NETworks REGNET ICCS – ART GALLERY.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 3: Content Testing.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Definition of supported Business Functions BUSINESS PROCESS MODELLING.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 1: Usability Testing.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 Market Engineering - Status of work 1.History of 2.5 – Objectives.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Status of Task 2.1 Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
Cultural Heritage in REGional NETworks REGNET. 4. July 2002REV02 Luxembourg – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Cultural Heritage in REGional NETworks REGNET June 2002PMG04 Sofia - WP7 Status 2 WP 7 - Management Task 7.1 – Project Management Project Presentation.
Cultural Heritage in REGional NETworks REGNET Den Haag Meeting (RN-PTG014) 21-22/11/2002.
Cultural Heritage in REGional NETworks REGNET PCM.
Cultural Heritage in REGional NETworks REGNET. June 2002ONB / EPMG REGNET Sofia 2 ONB Status report Current content production Data (to be) delivered.
Cultural Heritage in REGional NETworks REGNET Auction System.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP 7 - Management Task 7.1 – Project Management Task 7.2 – Quality.
Cultural Heritage in REGional NETworks REGNET. June 2002 Content status presentation MUSEON MUSEON Status of the content production MUSEON Status of the.
Cultural Heritage in REGional NETworks REGNET E-SHOP.
Cultural Heritage in REGional NETworks REGNET June 2002PMG04 Sofia - T2.3 Status 2 Development in Task 2.3 Refinement of REGNET partnership.
Cultural Heritage in REGional NETworks REGNET The Linnaeus Theme.
Cultural Heritage in REGional NETworks REGNET ICCS – REGNET Dissemination Activities.
Combining Like Terms. Only combine terms that are exactly the same!! Whats the same mean? –If numbers have a variable, then you can combine only ones.
Click to edit Master title style Page - 1 OneSky Teams Step-by-Step Online Corporate Communication Support 2006.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Exponents You will have 20 seconds to complete each of the following 16 questions. A chime will sound as each slide changes. Read the instructions at.
0 - 0.
2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt 5 pt 1pt Simplify All mixed up Misc. AddingSubtract.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
TECHcommunity March 2012 Collaborate, Connect, Contribute, Catch up & Customize.
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
O X Click on Number next to person for a question.
© S Haughton more than 3?
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
1 Directed Depth First Search Adjacency Lists A: F G B: A H C: A D D: C F E: C D G F: E: G: : H: B: I: H: F A B C G D E H I.
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
© 2012 National Heart Foundation of Australia. Slide 2.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Limits (Algebraic) Calculus Fall, What can we do with limits?
Extended School Year (ESY): Standards Adapted from Region IV Presentation August 28, Slides.
Properties of Exponents
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
11 = This is the fact family. You say: 8+3=11 and 3+8=11
Titel der Präsentation
Week 1.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
FIND THE AREA ( ROUND TO THE NEAREST TENTHS) 2.7 in 15 in in.
O X Click on Number next to person for a question.
PSSA Preparation.
Calculus 5e Early Transcendentals Multivariable James Stewart Chapter 16 Vector Calculus.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group

June 2002REGNET Project Team Meeting Content Group 2 Working Groups in Sofia I 3 Working Groups / 1/2 hour News / Newsletter Collection Profile Address Events Links Vocabulary Please discuss the following questions (see next two slides): Please prepare a short presentation of the results to the other working group members Open round: Who can contribute which types / amount of content (e.g. as it is already existing in the organisation) Are additional object types needed, which ?

June 2002REGNET Project Team Meeting Content Group 3 Working Groups in Sofia II Please define How much additional content is needed from the content providers In each of the forms: Are the fields sufficient ? Which fields should be added, which can be deleted ? Which types of information should be available in which languages? How many items of information are needed ?

June 2002REGNET Project Team Meeting Content Group 4 Address mask, part 1

June 2002REGNET Project Team Meeting Content Group 5 Address mask, part 2

June 2002REGNET Project Team Meeting Content Group 6 Collection section

June 2002REGNET Project Team Meeting Content Group 7 Event mask, part 1

June 2002REGNET Project Team Meeting Content Group 8 Event mask, part 2

June 2002REGNET Project Team Meeting Content Group 9 Link mask

June 2002REGNET Project Team Meeting Content Group 10 News mask, part 1

June 2002REGNET Project Team Meeting Content Group 11 News mask, part 2

June 2002REGNET Project Team Meeting Content Group 12 Newsletter mask, part 1

June 2002REGNET Project Team Meeting Content Group 13 Newsletter mask, part 2

June 2002REGNET Project Team Meeting Content Group 14 Profile mask, part 1

June 2002REGNET Project Team Meeting Content Group 15 Profile mask, part 2

June 2002REGNET Project Team Meeting Content Group 16 Vocabulary mask