1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator October 5, 2010.
1 Fairfax County Base Realignment and Closure Laura Miller Fairfax County BRAC Coordinator October 18, 2011.
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion (Continued) Board Transportation Committee February 14, 2012.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
County of Fairfax, Virginia Department of Transportation Regional Bus Rapid Transit Efforts Board Transportation Committee October 20, 2009.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion Board Retreat February 7, 2012.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
County of Fairfax, Virginia Department of Transportation Fairfax Connector Bus Service Plans HOT Lanes and Dulles Rail Phase I Fairfax County Board of.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
Tysons January 15, Operational Analysis of Dulles Toll Road Ramps to Tysons Boone Boulevard Ramp Analysis Seyed Nabavi Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
11 Inova Fair Oaks Hospital Master Facility Plan Zoning Applications Presentation March 2011.
I-95 HOV/HOT Lanes Project Update Update Fairfax County Transportation Committee September 20, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
BRINGING MOBILITY TO CONTRA COSTA COUNTY PRESENTATION TO THE CONTRA COSTA COUNTY BOARD OF SUPERVISORS APRIL 16, 2013 Randell H. Iwasaki Executive Director.
1 Item 11, Presentation to the TPB, September 15, 2010.
Construction Impacts Overview of Policy Changes Shuttle Changes Enforcement Faculty/Staff Changes Visitor & Event Parking Changes Resident Student Changes.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
June 20, 2013 CSSC Transportation Update. APG Traffic Counts Tuesday (2/26/13)Wednesday (2/27/13)Thursday (2/28/13) 6:00 – 7:00 AM :00 –
FORT BELVOIR BRAC OVERVIEW
Grade Separation (GS-16) Project. Project Location - Bensenville N.
PARK WEST DRAIN Park Township, Ottawa County, Michigan Project Information Meeting August 4, 2011 Ottawa County Drain Commissioner.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Bowls – A Sport for Life 69 Metropolitan Bowling Clubs read Jack Hi 140 Country Bowling Clubs read Jack Hi Hundreds of Community Members across the State.
Downtown Access Improvements Plan Town of Hillsborough 2014.
HS-8 Traffic Calming / Control Committee Draft Plan February 29, 2012 Belmont Ridge Middle School 1.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
To insert photo, click View > Master > Slide Master 1.42” x 1.83" To insert photo, click View > Master > Slide Master 2” x 2.68" To insert photo, click.
New N. Atlanta High School 4111 Northside Parkway Project Overview March 25, 2010 Facilities Services Department September 20, 2011.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Future Planning and Zoning of the Umatilla Army Depot
1 Unit 1 Kinematics Chapter 1 Day
BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
5/19/20151 Segoe Road Proposed Remarking Plan Scott Langer Traffic Engineer City of Madison Traffic Engineering Division Madison, Wisconsin.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Route 7 Corridor Projects Fairfax County Transportation Advisory Commission April 15, 2014 Leonard (Bud) Siegel Jr., PE Virginia Department of Transportation.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Pinole Valley High School (PVHS) Project Status 1 Facilities Subcommittee Meeting February 10, 2015.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
County of Fairfax, Virginia Silver Line Update Board Transportation Committee December 1, 2015 Mark Canale Fairfax County Department of Transportation.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
October 28, COL John J. Strycula/IMNE-BEL-ZA/(703) (DSN 655)//COL Mark Moffatt/IMNE-BEL-BRAC/(703) / FORT.
Four Winds Condominium Association August 2, 2017
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Project Overview Multimodal improvements to 22.5 miles of I-66
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Public Information Meeting NW 100th Street Reconstruction Project
SW Gage Blvd - Street Repair Project
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Metropolitan District | mndot.gov
Presentation transcript:

1 Fairfax County Base Realignment and Closure Mark Canale Fairfax County BRAC Coordinator April 5, 2011

2 BRAC Overview

3 Fairfax County Parkway Phase 1 and 2 – Open to traffic ROW/Easement Dedication and Punch List – Pending Phase 3 Construction Start – Nov 2010 Scheduled Completion – July 2012 Phase 4 Scheduled Completion – July 2011 Defense Access Road (DAR) Ramps I-95 Southbound Ramp – Completed I-95 Northbound Ramp - Start Summer 2011, Completion Late 2012 Saratoga Park and Ride Lot 500 Space Parkway/Barta Interchange Preliminary Engineering Started Connector Road Phase 1 Completed (Pole to Telegraph Road-Not Open to Traffic) Phase 2 Construction Start Spring 2011, Scheduled Completion Dec 2012 ( Route 1 to Telegraph, and Telegraph Road from Beulah to Leaf)

4 BRAC Overview Route 1 Design Only - $3M C&I Tax $141.5M Required for Construction

5 BRAC Overview Rolling Road Design Only Fullerton to Delong Final Design Completion – Feb 2013 City of Alexandria Projects Short/Mid Term Improvements Construction Begins Feb 2012 Completion Nov 2013 Estimated Cost $17-20M Long Term Improvements I-395 HOV Ramp Construction Begins Winter 2012 Completion Winter 2012 Estimated Cost $80M

6 BRAC Overview

7

8

9

10 BRAC 133/Mason District Mason District BRAC 133Task Force - Established Parking Cut Through / Traffic Calming Little River Turnpike/BeauregardTraffic Study Localized Impacts to Fairfax County Target 17 Streets for Impacts

11 BRAC Overview

12 BRAC Overview Questions ?