WSQA PEPD Mentor Training Session 2: Mentor’s role during site visit.

Slides:



Advertisements
Similar presentations
ProfessionalValues and Practice Look for differentiation. Monitor lesson plans (planning links). IEPs used Short evaluations should be encouraged (and.
Advertisements

MONITORING OF SUBGRANTEES
Mentoring New Educators
Baldrige National Quality Program 2003 Baldrige National Quality Program The Site Visit Process and Evaluating Site Visit Issue Worksheets.
Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
EVALUATOR TIPS FOR REVIEW AND COMMENT WRITING The following slides were excerpted from an evaluator training session presented as part of the June 2011.
June 2002QPRC 2002, Tempe, Arizona A Workshop on Assessing to the Baldrige Criteria Cheryl L. Jennings, Motorola Lynn Kelley, Textron.
Welcome, Panel of Examiner and Process Development Members! Washington State Quality Award PEPD #1 Training 2008.
The Blueprint Your SIP (School Improvement Plan) A living, breathing, document.
OVERVIEW OF ClASS METHODS and ACTIVITIES. Session Objectives By the end of the session, participants will be able to: Describe ClASS team composition.
WSQA PEPD Mentor Training Session 1: Mentoring role and responsibilities.
District Team Training Seminar Opening Plenary Session.
Muscogee County School District Division of Academics (DOA) District Accreditation Module 4: Quality Assurance.
ACCIDENT REVIEW PROCESS. OBJECTIVES After completing this lesson the participants will be able to: Understand the role of an Accident Review Board/Board.
Principal Leadership Academy Basic Leadership Training November 2012.
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
Mastery learning approach Name of presenter Prevention of Postpartum Hemorrhage Initiative (POPPHI) Project PATH Adapted from PPT developed by Jhpiego.
Site Visit. 2 Process Intent Observation (IO) Strength to Comment Intent Observation: “Double plus on the process used for strategic planning.” Comment:
Process For Reviewing Denison Organizational Culture Survey
 2004 Minnesota Council for Quality Training for Team Leads and Judges 2004 Award Cycle.
Org Name Org Site CMM Assessment Kick-off Meeting Dates of assessment.
Professional Experience Middle and Secondary Schooling Liaisons Meeting 9/07/12 Shane Pill Sally.Cole
1 How to Recruit, Organize, and Retain Volunteers Breakout Session # 1&2, 4&5 Jack Bishop, CPCM, Mentor, Rio Grande Chapter How to Recruit, Organize, and.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Preceptor Orientation
Work-Based Learning (WBL) Coordination The Amended Model WORKLIFE COOPERATION PLAN Workplace analysis Workplace database Framework agreement Workplace.
Webinar for Site Visit Team Chairs September 2011.
TEAM PRE-SITE VISIT MEETING
Actions Set a clear aim for the performance of your eligibility system Define why your key audiences (governor, legislature, public) should support it.
ISO 9001: 2000 Certified Audit Process What to do.
EVALUATOR TRAINING. EVALUATION TEAMS 1 Adult Evaluator 2 Student Evaluators + 1 Student Room Consultant 1 Student Timer 1 Student Clerk 1 Monitor (only.
How to Prepare for an Ohio Technical Assistance Visit.
Is it possible to reconcile relationships and quality assurance in the Assessment Only Route? Isabelle SchäferCatriona Robinson Friday 16 th May 2014.
Working with the BOSS (Baldrige Online Scoring Solution) Wisconsin Forward Award Examiners
Fleming College Quality and Risk Management Review Summary February 2, 2006.
1 ©2002 Minnesota Council for Quality Evaluation Techniques for Team-Leaders and Judges August 2002.
Site Visit Training. Learning Objectives: Describe the purpose of each phase of the Site Visit process and the team’s deliverables.  Describe the major.
ADEPT 1 SAFE-T Judgments. SAFE-T 2 What are the stages of SAFE-T?  Stage I: Preparation  Stage II: Collection of evidence  Stage.
Measuring for Success Module Nine. Reflecting on the Previous Session What was most useful? What progress have you made? Any comments or questions?
DEVELOPING PARENT INVOLVEMENT POLICIES Title I No Child Left Behind (NCLB) Section 1118.
December 8, 2010 Ensuring Educator Excellence Accreditation Handbook 2. Team Member Ethics 3. Responsibilities prior to arriving at the Site Visit.
BEGINNING EDUCATOR INDUCTION PROGRAM MEETING CCSD Professional Development Mrs. Jackie Miller Dr. Shannon Carroll August 6, 2014.
Performance Management A briefing for new managers.
November 15, 2007 The “ABC” of Effective Field Monitoring & Supervision November 15, 2007.
AMEDD Rev. 30 August 2000 Donna O. Farley, Ph.D. Building an Action Plan for Practice Guideline Implementation Training for MTF Action Team Facilitators.
Project financed under Phare EUROPEAN UNION QUALITY EXTERNAL MONITORING IN THE SCHOOL YEAR 2007 – 2008 CONCLUSIONS AND RECOMMENDATIONS Material produced.
Meetings Managers are people who do things right, while leaders are people who do the right thing. Warren Bennis, Ph.D. “On Becoming a Leader”
1 Lecture 12: Chapter 16 Software Quality Assurance Slide Set to accompany Software Engineering: A Practitioner’s Approach, 7/e by Roger S. Pressman Slides.
 A formal update on Committee progress will be provided to the Provost, Executive VP for Finance, and other senior officials at UGA. This update will.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Site Visit Opening Meeting. Washington State Quality Award Council2 WSQA MISSION Make Washington State a better place to live, learn, and work by helping.
Facilitated by Kelly Bailey, Durham College Prepared by Ruth Rodgers, Durham College Based on the work of Ingrid Bens (Facilitation at a Glance)
Connecticut Department of Public Health - Keeping Connecticut Healthy Connecticut Department of Public Health PHABuloCiTy! Public Health Accreditation.
Module 6.0: Communication Protocol DIT Installation Series Trainer Name Date.
Click to edit Master subtitle style Competence by Design (CBD) Foundations of Assessment.
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
Preparing for Title IIA Monitoring Review (FY15) November 9, 2015 Deborah Walker Meagan Steiner David LeBlanc.
Remote Site Initiation Visits
What every benchmarking coordinator needs to know
Polices, procedures & protocols
Finalizing Award Recommendations
Proctor Training Required for all Proctor Volunteers
Flooding Walkdown Guidance
Coordinated Assessment System (CAS): Update
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Proctor Training Required for all Proctor Volunteers
Updating Items in Scorebook Navigator
Preparing for Title IIA Monitoring Review (FY15)
Bulloch Information Session
Delta Financial Corporation 2013
Presentation transcript:

WSQA PEPD Mentor Training Session 2: Mentor’s role during site visit

WSQA PEPD Mentor: Session 4 2 Session 4 topics  Site Visit Issue (SVI) worksheet review  Site visit planning  Supporting the team on-site

WSQA PEPD Mentor: Session 4 3 SVI worksheet review  What are some best practices for reviewing and providing feedback on SVI worksheets?

WSQA PEPD Mentor: Session 4 4 SVI worksheet review: Results items  All results and figures for double strengths/OFI’s are addressed  Most or all other results are addressed  SVI’s clearly cite results references  SVI’s address missing results

WSQA PEPD Mentor: Session 4 5 SVI worksheet review: Process items  All double strengths/OFI’s are addressed  Key Factors are appropriately referenced  Comments are appropriately grouped/combined  Questions clearly address SVI’s

WSQA PEPD Mentor: Session 4 6 Site visit planning  Discussion: as Mentor, what are your most important contributions to site visit planning?

WSQA PEPD Mentor: Session 4 7 Site visit planning  Travel/transportation set  Supplies and equipment are set  Team roles/responsibilities/ assignments set  SVI’s ready  Draft schedule (including Sunday) is ready

WSQA PEPD Mentor: Session 4 8 Site visit planning  Applicant has met or acknowledged requests for documents, equipment  Interviewee list is ready  Hotel has prepared conference room as needed  More?

WSQA PEPD Mentor: Session 4 9 Site visit: (break this out day by day)  Attend opening meeting, Sr. Leader meeting, other key site visit meetings where requested by Team lead or others.  Attend a few hours of the team meeting for Day 1 to assure Site Visit Issues are fully addressed and documented.  On Day 2 assure team is on track by assisting Team Lead in making modifications to site visit plan if needed.  On Day 3 be available for closing meeting at your discretion as well as the team meeting if needed.  Attend a few hours of Days 4, 5, and 6 meetings at your discretion to assure that team is looking beyond Site Visit issues to potential OFI’s once the Site Visit issues are resolved.  Be available for team questions during hours not present via phone.  Be available to support the Team Leader during the presentation to the Judges’ Panel.  Is the PEPD Mentor expected/required to be present through the entire site visit? - Erik

WSQA PEPD Mentor: Session 4 10 Mentor roles and responsibilities: All teams  Information resource: answer team questions on process, criteria, scoring  Process monitor – work with lead, then observe and coach  Team-building approaches and techniques

WSQA PEPD Mentor: Session 4 11 Mentor activities: individual review  (Full) Review category lead/back-up assignments with Lead, make sure they’re communicated on time  (All) Provide early feedback to individual examiners (upon completion of Cat. 1)

WSQA PEPD Mentor: Session 4 12 Mentor activities: consensus  Coordinate consensus Full: work with Lead Lite: work with team Ensure teams are prepared  Ensure traceability from Key Factors to feedback comments  Provide answers, guidance

WSQA PEPD Mentor: Session 4 13 Mentor activities: consensus  FULL: Monitor consensus process Participate in phone calls/meetings Ensure traceability from Key Factors to feedback comments Provide answers, guidance

WSQA PEPD Mentor: Session 4 14 Team-building  Discussion: What are your top Do’s and Don’ts in teambuilding? How can a mentor contribute to building the examiner team?

WSQA PEPD Mentor: Session stage team-building approach*  Clarify the collective goals  Identify those inhibitors that prevent the team from reaching their goals and remove them  Put in place enablers that assist them  Measure and monitor progress, to ensure the goals are achieved * From

WSQA PEPD Mentor: Session 4 16 Summary  Mentor roles & responsibilities Individual review Consensus review Full vs. lite assessments  Team-building  Discussion: recommended improvements Content Format Presentation Other

WSQA PEPD Mentor: Session 4 17 End