Session 1 - 25 th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.

Slides:



Advertisements
Similar presentations
MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
Advertisements

How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
New HV test specification for the LHC N. Catalan for the EI section.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Cryomodule test stand at ESS site
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Equipment simplified model SMR UR safety
ELQA Electrical Quality Assurance
Minimum Hardware Commissioning – Disclaimer
Safety in Construction and Upgrade Phases
Document Plan & Milestones WP7
The LHC - Status Is COLD Is almost fully commissioned
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Agenda Contents Different types of documents
TEST PLANS for HL LHC IT STRING
Collimator Control (SEUs & R2E Outlook)
Brief report of the hardware commissioning activities
Hardware Commissioning
Circuit Disconnector Boxes Implementation of our safety first policy
Powering and Safety day Underground access during powering tests
Review of hardware commissioning
Presentation transcript:

Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in Why hardware commissioning in the future ? ● For several years, extensive re-commissioning of the sc circuits is expected, after total or partial warm up… – adding relief valves, consolidation of splices, HC to 5…7 TeV (training, …), upgrade/modifications of power converters, powering interlock system and QPS (e.g. upgrade with radiation tolerant electronics), other upgrades,…. It is worth to invest time and effort into further optimisation of hardware commissioning ● What needs to be done? (Does it really have to be done?) ● What can be improved? ● What can be automatised ● Resources – what is required? ● Powering tests in three weeks?

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in What is Hardware Commissioning ? ● Lock off power converters ● Disconnect powering cables (if not yet done) ● ELQA at warm ● Start monitoring main circuits during cool down ● Cool down and cryo tuning ● Stop monitoring main circuits during cool down ● ELQA at cold ● Connection of the power cables to current leads ● Unlock power converters ● Preparation of QPS (charge quench heaters, close interlock loops and prepare QPS system for powering) ● Powering tests Many planned underground interventions Few planned and unplanned interventions

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in Different phases: past Activities that resemble shutdown / technical stop activities ● Planned activities ● Driven by the equipment teams ● Coordinated by HCC Activities driven from CCC (mainly powering tests) ● Some planned and some unplanned activities underground ● Driven by operation ● Coordinated by HCC (that became smaller…..)

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in Different phases: proposal for the future Activities that resemble shutdown / technical stop work ● Planned activities ● Driven by the equipment teams ● Coordinated by EN-MEF (shutdown coordination team) Activities driven from CCC (mainly powering tests) ● Some planned and some unplanned activities underground ● Driven by operation ● Coordinated by operation ● Four “point owners” are not too many! – possibly two from EN-MEF and two from BE-OP ● Major contributions from several groups in TE, EN and BE

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in What went well ● Procedures ready in time ● Powering phase I and II – complex, but worked out ok ● Shifts 7 days / 3 shifts essential (do not start too early) ● Access Tuesday (and possibly Wednesday) during the morning – Help for giving access important ● MP3 support and QPS support essential – requires lot of experts in CCC – three – can this be reduced? ● Powering test page essential for following up progress ● Superlocking of circuits with an issue, and simple locking of circuits – works well (some ideas for improvements) ● Software tools in general very good ● Automatic analysis for PIC tests – good experience, can be extended to more tests and other systems (less need for experts)

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in What should be improved I ● DFB – too many interfaces, reorganisation will lead to simplification – team for performing ELQA – team for connection / disconnection of cables – will become more complex with additional system (such as interlock on current lead temperature) – team for cryogenic interventions (valves, …) – team for locking / unlocking power converters – (sometimes) team for water cooled cables ● Proposal: only one team for electrical intervention on DFBs – being tried out during this technical stop – organisation and resources need to be addressed ● Helpful to open doors in the centre of a sector when lot of work in the tunnel (see presentation of Julie Coupard)

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in What should be improved II ● Powering phase I and II: RB can be powered at 110 A in phase I, for starting the circuit and for checking interlocks – successful test last December ● Software tools to be improved (consolidation) ● Automatic analysis to be extended ● Safety: introduce a hardware link between the access system and the powering system (powering interlock)? to be studied ● Giving access during powering – can be simplified, avoid to switch off and lock via the PIC all circuits – ramp down to injection for all circuits (stand by current for RB of 110 A) – prevent increase of current at level of FGC during access – access – proposal being discussed with Ghislain Roy et al. ● Access matrix to be reviewed in light of operational experience

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in General Schedule 7 th October (K. Foraz – LMC) All yellow boxes: ELQA

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in ELQA Already well optimised, can it be further optimised? ● avoid warming up to above 80K ● doing less? re-iterate what needs to be redone…. ● doing it differently? – more automatic? – more test systems (never to be limited by the number of test systems) ● using more resources? – prepare test systems such that little training is required to perform tasks – help from outside collaborators – more help from inside CERN – why not?....with qualified personal ● non conformities…take a long time to fix…. – Invest time before into quality, to avoid non conformities – involve ELQA team from the start when equipment is designed that needs to withstand high voltage

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in MP3 ● Responsible for writing the procedures together with the hardware commissioning coordination team ● Ideas for future recommissioning – what needs to be redone? – Review what test to be done as a function of the circuit history (warm up to room temperature to 80K, …..) ● The procedures need to be cleaned up and made coherent starting SOON, and not some weeks before the next campaign – clear responsibilities to be defined – who should drive this effort? ● Simplifying retesting groups of circuits (test of main interlock functionalities) – similar to Powering Group Circuits for some of the interlock tests – some tests are being done in this technical stop

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in QPS ● Further consolidation of the QPS system will lead to less steps that fail …non conformities take a long time to fix… ● The nQPS commissioning procedure needs to be integrated into the general RB and RQF/D commissioning procedure ● Monitoring during cool down to detect problems: can it be extended using the QPS system? ● nQPS to individual powered magnets to be installed (new steps in commissioning will be required) ● Number of experts for QPS: knowledge to be spread to more colleagues ● Merge MP3 and QPS operation support teams – long term commitment to keep competence

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in Powering interlock system and power converters Powering interlock system ● Resources for PIC related tests required for tests did substantially decrease from 2008 to 2009, due to the automation of the analysis ● This can be extended, further reducing the resources required during commissioning Power converters ● Some further automation of the analysis is possible ● Cutting the water of the RB and RQF/D circuits locally for the interlock tests is time consuming and interrupts the tests – remote operation of the valves for these circuits is recommended

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in Cryogenics system ● Remarkable improvement of the stability of the cryogenic system between 2008 and 2009 – Very little downtime due to cryogenic system in 2009 ● Frequent replacement of the valves for 600A circuit were an issue, and took quite some time and effort from several teams – requires locking off entire DFB, could we find a procedure that does not require this? ● Cryo tuning is one of the limiting factors before starting powering (such as boil-off, etc.). – does it have to be repeated? Can it become more automatic / faster? ● Coupling between forcing a temperature of a valve and the power permit of a circuits should be considered (link CRYO_Supervision and PIC_Supervision, allows cryo expert to superlock circuit - not relying on exchange)

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in Tracking circuits: only ONE entry ● Several tools are being used today…one tool per team ● One entry for tracking all aspects during the life of a circuit – power converter locked off – circuit ready for ELQA (cryo start and cryo maintain) – cable connected / disconnected – ELQA at warm and at cold – connection and disconnection of monitoring systems before start of cool down (for main circuits) – QPS individual system tests finished (heaters charged, other conditions,…) – powering test steps (powering tests pages) ● More safe commissioning (less error prone) ● Improved tracking of progress (faster) ● Simpler communication between teams (less errors, faster)

Chamonix 2010Session 1 - Preconditions for operating at 5 TeV in Long term objective: Powering tests in three weeks ● Organisation: Hardware Commissioning Coordination by TE-MEF before powering, and BE-OP when powering starts ● DFBs: define responsibilities, reduce interfaces ● Tools: prepare ONE entry (one tool?) for tracking circuits ● Retain (four) “Point Owners” ● In order to be more efficient, the preparations for the future campaigns must start soon. A team should prepare future hardware commissioning with a mandate such as: – propose improvements of tools, follow development – follow up updating of the commissioning procedures – get new people involved into this activity – workshop and written report later this year to present the progress ● Members from OP, MEF, MPE/MP3, EPC, Controls, Cryo, MSC