1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Michael Scharfenstein FAC June 17, ES&H Status of Construction and Technical System Installations Michael Scharfenstein.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
1 Jess Albino 1 Conventional Facilities Status FAC Review – Breakout Session CONVENTIONAL FACILITIES STATUS Jess Albino – Associate.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
M. Scharfenstein - ES&H Coordinator 8 June 2009
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Update Aesook Byon NSLS-II Deputy Project Director CFAC October 5, 2010.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Welcome LCRA Firm Water Customer Meeting October 27, 2011.
Environment, Safety and Health
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting March 29-30, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia Program Progress Report Discussion Paper 2.
Enterprise Content Management Owners Representative Contract Approval
Meeting of the LCLS Facilities Advisory Committee
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Details supporting the increase
Integrated Safety and Environmental Management
Michael Scharfenstein Project ES&H Coordinator
CONVENTIONAL FACILITIES
Richard Hislop Construction Safety Coordinator
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities Advisory Committee Review October 5 & 6, 2010

2 BROOKHAVEN SCIENCE ASSOCIATES Construction Status Outline Construction Safety Construction Status Milestones/Phases Cost Performance Technical and Quality Oversight Staffing Plans Going Forward Issues and Challenges Path Forward Conclusions

3 BROOKHAVEN SCIENCE ASSOCIATES Construction Safety Maintain “Best in Class” Safety Program Objective Ongoing Adjustments Torcon Has Reinforced Safety Effort CF-CM Working Closely with ESH Regular Meetings to Continue Improvements Daily Morning Safety Meetings w/ Torcon Our success measured by our Safety Performance

4 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Construction as of September 30, 2010

5 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Statistics (As of September 30, 2010) Contract Amount$172,600,600 Approved Changes $4,722,859 Adjusted Contract Amount $177,323,459 Earned to Date$100,861,441 Percent Complete57% Contract Award February 18, 2009 Completion Date April 30,2012 Duration 801 Days Days Elapsed500 Days Percentage62%

6 BROOKHAVEN SCIENCE ASSOCIATES Ring Bldg Construction Phasing Beneficial Occupancy Dates Construction of LOBs Coordinated with Ring Bldg Construction Phasing Phase Milestone Baseline 1 Pentant 1- BO 1-Feb-11 2 Pentant 5 - BO 9-Feb-12 3 RF Building - BO 23-Mar-11 4 Pentant 2 - BO 2-Jun-11 5 Pentant 3 - BO 27-Sep-11 6 Injection Building - BO 18-May-11 7 Pentant 4 - BO 28-Nov-11 8 Ring Bldg Const. Complete 30-Apr-12

7 BROOKHAVEN SCIENCE ASSOCIATES Cost Performance Report

8 BROOKHAVEN SCIENCE ASSOCIATES Cost Performance Report

9 BROOKHAVEN SCIENCE ASSOCIATES Technical and Quality Oversight Inspection Team BNL Inspectors Outside Inspectors (Staff Augmentation) Testing Agencies –Universal Testing (Steel) –MT Group -Concrete -Soils Inspection Procedures Developed and Implemented Concrete and Steel

10 BROOKHAVEN SCIENCE ASSOCIATES Technical and Quality Issues Technical and Quality Issues Identified Immediately Minor –Contractor Notified – Corrections Made Inadequate Response –Pending Items Issued in Contract Manager More Serious Requiring Documentation –Compliance Notice Issued in Contract Manager – PPM Issues or copied Work Closely with Contractor’s QA Manager Minimal Serious Issues until recent concrete strength Maintaining High Quality

11 BROOKHAVEN SCIENCE ASSOCIATES Technical and Quality Issues

12 BROOKHAVEN SCIENCE ASSOCIATES COMPLIANCE NOTICE-0007 Dowels at Ring Tunnel Slab Dowels Identifies

13 BROOKHAVEN SCIENCE ASSOCIATES COMPLIANCE NOTICE-0007 Dowels at Ring Tunnel Slab

14 BROOKHAVEN SCIENCE ASSOCIATES Project Staffing Current Staffing Permanent Staffing Hires Complete (6 positions filled) F&O Field Inspector (CW Piping and Substation Upgrade) Staff Augmentation Started (3 positions filled to date) –Civil Inspector –Clerk of Works –Mechanical Inspector Revised Staffing Plan Added 1.5 FTE to address simultaneous LOB construction Provides enhanced safety oversight Additional inspection staff available thru augmentation

15 BROOKHAVEN SCIENCE ASSOCIATES CF Staffing Plan

16 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Organization

17 BROOKHAVEN SCIENCE ASSOCIATES Issues and Challenges Safety ‘Best in Class’ Program Going Forward Meeting Phase 1 Milestone (Pentant 1 Occupancy) Transition to Operations Managing contractor change requests Different LOB Contractor – Ongoing Logistics

18 BROOKHAVEN SCIENCE ASSOCIATES Path Forward Refocus ‘Best in Class’ Project Safety Program Work with Torcon to Facilitate Project Continue Inspection and Testing Effort Continuous Improvement of CF Procedures Manual Ramp Up Commissioning Prepare for Upcoming Activities – Checklist Closeout Utility Construction Packages Substation Upgrade Contract Chilled Water Piping Contract Continue Training When Applicable

19 BROOKHAVEN SCIENCE ASSOCIATES Conclusion Reinforced Safety Effort Working Lessons learned from early incidents Enhanced safety program Project Ahead of Schedule First milestone still a challenge Intermediate on track Completion ahead of schedule Safety/Technical/Quality Requirements Being Met