Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.

Slides:



Advertisements
Similar presentations
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Advertisements

Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
Bartholomew Consolidated School Corporation Additions and Renovations to Columbus East and North High Schools Additions and Renovations to Columbus East.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
2008 Goal New Goloka Dhama Dimmocks Mill Road, Hillsborough, NC, To build a nice temple facilities for Sri Sri Radha Golokananda Ji in Hillsborough,
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
SCHEMATIC DESIGN PRESENTATION
The Blue Ridge Parkway Visitors Center.  Overview of the Blue Ridge Parkway Visitor Center  LEED Technologies Applied  Performance Comparison.
Franklin County Technical School Performance Contract Project.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Bethany Ramey Trombley Architect, LEED AP ID+C September 10, 2010 UT’s Hearst Student Media Center LEED GOLD Renovation What Starts Here Changes The World.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
CROZET ELEMENTARY SCHOOL SITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
We provide and maintain all utilities such as Electricity, Water, Waste Water, Heating and Cooling Services, Refuse Collection, and the Garrison Recycling.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Shape up in 2008 Join the Fort Collins Green Team.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
LOS ALAMOS COUNTY JUDICIAL / POLICE – JAIL COMPLEX 60% SUBMITTAL August 8, 2008.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
PARKING LOT Protecting Chesapeake Bay  Create underground storm water management system to prevent flooding, erosion, pollution of the Bay  Plant bioswales.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
1 Capital Improvements Committee 2011 Capital Request April 14, 2010 Chief Edward A. Flynn Milwaukee Police Department.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
City of San Jose Building A New Vehicle and Equipment Maintenance and Repair Facility.
  Provide a library link at an existing campus crossroads and a new face for the combined Deering Library/ University Library complex  Strengthen the.
COUVA SHOPPING CENTRE. EXISTING LAYOUT ASSUMPTIONS ONLY EXISTING LAND AREA AVAILABLE MAXIMISE RENTAL OF EXISTING SPACE PROVIDE A FINANCIALLY AFFORDABLE.
E GNV Orange County Solid Waste Management Facility Southern Expansion Site Project.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
PH Building Assessment Buildings 25,70, 155, 166 and 187 Safety Analysis.
1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.
Alpine County Government Center Board of Supervisors Presentation October 2, 2012.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
Energy Huntsville Opportunity Report and Government Collaboration June 2016.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
Behavioral Changes Recycling Program Green Schools Program Green Cleaning Education and Communication.
Infrastructure Revitalization Project
White Pigeon Community Schools
Building Services Summer 2016 Update
Strategic Planning & Operations
Pre-Contract Cost Control
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Albemarle County Public Schools
M&E SYSTEM.
Sandy Grove Middle School
Recent Bond Accomplishments
Performance Measurement Review July 2018
Presentation transcript:

Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s P L C

Design for Vehicle Maintenance Facility Improvements Design Committee Members Josh Davis Charmane White Sherry Wilkerson Carolyn Savina Allen Pritchett Joe Letteri Lisa Glass Joe Werres

Project Scope  Storage Addition and Renovations at the VMF  New Parking and Site Lighting for Staff & Shop Vehicles  Semi-Automated Bus Wash System with Water Recycling  Repair and Re-pave existing “upper” Parking Area  Provide Site Lighting for existing “upper” and “lower” Parking Areas  Storm Water Treatment Improvements Design for Vehicle Maintenance Facility Improvements

Thank you Aerial Photo of Existing Vehicle Maintenance Facility Complex VMF Storage Addition & Renovations New Parking with Site Lighting Pavement Repairs & Site Lighting Site Lighting Semi - Automated Bus Wash With Water Recycling Storm-Water Treatment Improvements

Storage Addition for the VMF  1074 Square Foot Storage Addition with high windows for natural light  Rack and Pallet Storage System on two walls for forklift and rolling stair access  Renovations to last bay at existing VMF to create one additional drive-through vehicle maintenance bay  Relocate existing tire balancing machine Design for Vehicle Maintenance Facility Improvements

Storage Addition to the VMF

Proposed Location for Storage Addition to the VMF to the VMF

Proposed 1075 Sq Ft VMF Storage Addition

Proposed Rack and Pallet Storage System: Four Pallets High Pallet Storage System: Four Pallets High

Proposed Renovations to Last Vehicle Bay: to Last Vehicle Bay: Add 14’ High Door, Level Floor Slab

Proposed Exterior Elevations, with Windows for Natural Light

New Parking for the VMF  69 New Parking spaces for Staff and Shop Vehicles  Site Lighting for New Parking  Second Access Route to Existing “Lower” Parking Area Created Design for Vehicle Maintenance Facility Improvements

69 New Parking Spaces for Staff & Shop Vehicles Second Access to Existing Lower Parking Area

Bus Wash Improvements  Semi-Automated, Touch-Less Bus Wash System installed in existing Bus Wash Building  Small Addition to Bus Wash Building for pumps, equipment, electrical, etc.  Water-Recycling System for wash water  Pave existing gravel Parking Area Design for Vehicle Maintenance Facility Improvements

Bus Wash Improvements

Existing Bus Wash Facility Location of Proposed Addition

Proposed Addition Proposed “Touch-less” Bus Wash System Proposed Bus Wash System

Improvements to Existing Parking Areas  Repair and Re-surface existing “upper” Parking Area  Site Lighting for existing “upper” Parking Area  Site Lighting for existing “lower” Parking Area  Site Lighting controlled by Energy Management System  Site Lighting on multiple circuits to facilitate Energy Conservation Design for Vehicle Maintenance Facility Improvements

Pavement Repairs for Existing “Lower” Parking Area

Site Lighting for Existing “Upper” and “Lower” Parking Areas

Storm Water Treatment Improvements Storm Water Treatment Improvements  Existing storm water basin upgraded to include water quality treatment  Basin will provide storm water treatment and detention  Basin upgraded to protect the Ivy Creek drinking water supply  Approximately 75% of the VMF complex run-off is routed through the basin Design for Vehicle Maintenance Facility Improvements

Storm Water Treatment Improvements

Project Budget and Schedule  Construction Budget: $1,376,000  Several Additive Alternates will be used  Project Schedule: Receive Bids Oct 2009  Construction Completion: June 2010 Design for Vehicle Maintenance Facility Improvements

Thank You