SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.

Slides:



Advertisements
Similar presentations
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Advertisements

Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave Hybrid Status Ashley Greenall 1. Current Status Current build of hybrids (Version 3) distributed to 6(+1) sites: Cambridge, DESY, Freiburg, LBL,
ATLAS Module building at Glasgow
25/06/2015Robert King, Oxford University - Graduate Seminar Series 1 Electronic speckle pattern interferometry at the SLHC.
Introduction Silicon Tracker project: design production Tracking strategy and performance Design and performance of the LHCb Silicon Tracker Kim Vervink.
Y. Unno, 2007/2/26 sLHC sensor R&D Module Plans (Nobu) Manufacturing plans, including financing (Nobu) Sensor Specs (Nobu)
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave Assembly (A random walk through stave construction)
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
HEP GROUP MEETING work on the ATLAS UPGRADE T.J.Fraser.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
WP4 – Plans for next 6 months
Diamond detectors for the LHCb upgrade M. Artuso, A. Borgia, J. Garofoli, R.Mountain, P.Urquijo, J. Wang, Z. Xing 5/5/20101Marina Artuso Velo Upgrade Meeting.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
LHCb VErtex LOcator (VELO) Module Production and Performance Anthony Affolder University of Liverpool for the LHCb VELO group RD07 Conference June 27,
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Strasbourg status Ring 7 pilot run François Didierjean.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
Hybrid Activities for ABC Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
1 ABC130 Module Envelope Envelope set by 2 locations 1.Power end – biggest contribution coming from shield box 2.Data I/O end – set by wire bonding from.
SLHC Stave Wire-bonding Clearances (Tim) WP4 Glasgow (13 th June 2011)
WP2: On Detector Systems 2.1 Strip Sensors Layout Evaluation 2.2 ASICs Digital Design Evaluation Wafer Test 2.3 Hybrids Layout & Manufacture Die Attach.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
Richard Soluk – U of Alberta – June 9, Upstream Face of VELO.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
EC: 7 DISK concept Preliminary considerations
Si Sensors for Additional Tracker
Berkeley status Aug 10th, 2012.
T. Bowcock University of Liverpool
Ashley Greenall The University of Liverpool
LHCb VErtex LOcator (VELO) Module Production and Performance
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Constructional requirements from ITk-Strips
Report on construction of LP2 spaceframe endplate
Phase 2 Outer Tracker Module analysis
WP4 – Plans for next 6 months
Database requirements from ITk-Strips for DAQ loads
Equipment for Assembly – UK Experiences
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
UNIZH and EPFL at LHCb.
LHCb VErtex LOcator ENGINEERING DEPARTMENT
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Setup for testing LHCb Inner Tracker Modules
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Updates on the Silicon Tracker 2S Module
Presentation transcript:

sLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011

Overview Development of engineering design for stave layout requires knowledge of likely stave core thickness. Components – Core Dimensions outer dimensions, bus-tape to bus-tape – Core Envelope Twists, bows local ‘roughness’, thermo-mechanical deformations – Module-to-tape adhesive – Module Envelope Module Envelope – Use experience from ABCN25’s with likely extrapolation to ‘final’ ABCN13 modules

ABCN25 Module Z Heights SmartScope survey of one hybrid glued to a sensor – Mount wire-bonding jig on SmartCcope and measure z-height – Locate module and establish vacuum – Measure z-heights of:- Silicon wafer Hybrid ASICs Wirebonds Capacitors

Results Wirebonds – Intended difference in loop-height is 0.2mm – 4-row wirebonding establishes on LHCb VeLo Beetle ASICs – 0.2mm bond height difference maintained. – Expect 4-row ABCN13 wirebonding to be similar giving wirebond height of 0.8mm above ASICs – Total height = = 2.21mm Capacitors – Measured height = 2.17 above local hybrid height of 0.65mm – Hybrid unsupported so measured height affected – Corrected height = = 2.32mm