Bureau of Indian Affairs November 2005 Indian Reservation Roads High Priority Projects IRRHPP.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
City of Eagle Pass, Texas TxCDBG Contract HOUSING REHABILIATION.
2010 DCA CDBG Applicants’ Workshop New for 2010 & Important Reminders.
High Cost Services Allocation Round Overview of Webinar Agenda (1)Overview of High Cost Services (2)Allowable Costs (3)Application Process-Round.
Act 44 Transportation Funding John Dockendorf Pennsylvania Department of Transportation November 2007.
Bureau of Indian Affairs December 2012 Tribal High Priority Projects Program 21st Alaska BIA Providers Conference.
Tribal Consultations. Topics FY12 Extensions and IRR Program Funding MAP-21 Programs and Funding.
Alternative Project Delivery
Tribal Transportation Safety Program Funding Craig Genzlinger Federal Lands Highways TTP Team.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Emergency Relief for Federally Owned Roads (ERFO) U.S. Department of Transportation Federal Highway Administration December 2013.
JULY 23,  Legislative Update ◦ Highway Trust Fund status ◦ Reauthorization proposals ◦ FY15 Appropriations  TTP Safety Funding  TTP Bridge Funding.
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
1 IRR Program Inventory and Funding Formula Update M.A.S.T. Impact Week Washington, DC March
ARRA Overview Q&As IRRPCC Meeting Herndon, VA March 25, 2009.
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Alaska Tribal Transportation Workgroup Julianne Baltar, President Alaska Tribal Transportation Workgroup and Director of the Bristol Bay Native Association’s.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
Transportation Planning Organization(TPO) City Council Workshop November 12, 2013.
RURAL DEVELOPMENT WATER & WASTE PROGRAMS WATER AND WASTE FACILITIES WATER SYSTEMS OR COMPONENTS OF WATER SYSTEMS SEWER SYSTEMS OR COMPONENTS OF SEWER.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
TTP Coordinating Committee Meeting Laveen Village, AZ Robert Sparrow Director – TTP - Federal Highway Administration.
The Regional Forum for Transportation Planning. Southwestern Pennsylvania 10 Counties >7,000 square miles 2.66 million citizens 548 municipalities 132.
QA/QC Team TPPCC GRIC May 6, Initial Issue: QA/QC Team Quality Assurance/Quality Control (QA/OC) Inventory Teams - As identified in our February.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Ron Hall Tribal Technical Assistance Program Colorado State University
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
Health Infrastructure Renewal Fund HIRF Program LHIN and Hospital Teleconference October 25, 2013.
BE A FI$CAL $.T.A.R. Match and Maintenance of Effort.
February 21-22, 2006RIFDS Training 1 RIFDS TRAINING Presentation by LeRoy Gishi Chief, Division of Transportation Bureau of Indian Affairs.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Mitigation Focus-Public Assistance Briefing for Hurricane Sandy
State Transportation Bonds. State Aid Bond Programs LBRP – Local Bridge Replacement Program ◦State Bridge Bond Funds LRIP - Local Road Improvement Program.
Workshops on Discussion Draft of Guidelines December 2014.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
FY2010 Budget and 2009 Legislative Session Update July 15, 2009 Janice Palmer Arizona School Boards Association Jeremy Calles Arizona Department of Education.
Budget Workshop: Fiscal Policies, Process, and Budget Guidelines Board of Governors April 21, 2005.
Outdoor Heritage Fund. Established on August 1, 2013 by the Legislature. Continuing Appropriation of $20,000,000 annually from oil and gas taxes. Outdoor.
Match and Maintenance of Effort BE A FI$CAL $.T.A.R.
Washington Community and Technical Colleges State Operating and Capital Budgets New Trustee Orientation January 22, 2012 Denise Graham SBCTC Deputy Executive.
MAP-21 Formula Briefing Preliminary DRAFT. Moving Ahead for Progress into the 21 st Century (MAP-21) MAP-21 was passed by Congress and signed by the President.
Community Crossings Matching Grant Fund Program Kathy Eaton-McKalip
TIBC Meeting Rapid City, SD Bob Sparrow Designated Federal Official – Tribal Transportation Self-Governance Office, FHWA/USDOT July 14, 2016.
HOUSING POLICIES UPDATE & CALENDAR A BRIEFING TO THE HOUSING COMMITTEE JUNE 6, 2016.
The Administration of Subrecipient Agreements
Intent to Apply/Pre-Application Guidance
Road Maintenance Subcommittee
UCI Annual Meeting Kimberly Pryor Infrastructure Investment Director May 24, 2017.
Funding Methodologies: Road Maintenance & Road Construction
TTP Update COLT Meeting Rapid City, SD Bob Sparrow
BIA Tribal Transportation Program
Chesapeake Bay Program Budget & Finance Workgroup Meeting
FY 2018 Community Capital Pre-Submittal Meeting
Completing the State Aid Payment Request
Mobility Fund High Impact/Low Cost Projects: Cape Fear RPO
Office of Self Governance Update – July 2018
AASHTO Committee on Funding & Finance
Creating a P.L Plan.
TTP Update 2017 Providers Conference Anchorage, AK
Florida College System Performance Based Funding
Tribal Transportation Program Update
FY2016 ESG RFP and Application Information
A Chronology Tribal Transportation Self Governance Program (TTSGP)
TIBC Road Maintenance Sub-Committee Meeting
Presentation transcript:

Bureau of Indian Affairs November 2005 Indian Reservation Roads High Priority Projects IRRHPP

Bureau of Indian Affairs November 2005 Outline Ø PROGRAM DESCRIPTION - AUTHORITY  DISASTERS / EMERGENCIES  BIADOT/FLH DETERMINE ELIGIBILITY AND RANK  RANKING: NUMERICAL SCORING  TIME - LINE  APPLICATION PROCESS  CURRENT PROGRAM  FUTURE

Bureau of Indian Affairs November 2005 IRR High Priority Projects  Consensus provision from rulemaking.  25 CFR – and Appendix A to Subpart C.  A special funding pool for:  tribes or governmental subdivision whose annual allocation is insufficient to complete its highest priority project;  Emergency/disaster on any IRR facility

Bureau of Indian Affairs November 2005 IRR High Priority Projects  Project must meet minimum IRR requirements  Inventory  Identified as Highest Priority by Tribe  Dollar Amount MUST be Greater Than Tribe’s Annual IRR Allocation and less than $1 M  Emergency/Disaster Projects  IRRHPP is a component of the funding methodology (TTAM) and available each fiscal year

Bureau of Indian Affairs November 2005 IRRHPP Funding

Bureau of Indian Affairs November 2005 IRRHPP Funding  Projected Budgets (Estimates Only) FYAuthorized AmountIRRHPP FYAuthorized AmountIRRHPP M 12 M M 17 M M 17 M M 21 M M 21 M M 25 M M 25 M M 29 M

Bureau of Indian Affairs November 2005 IRRHPP Emergency / Disaster  HPP Emergency / Disaster related projects given highest priority.  HPP Emergency / Disaster related projects NOT scored in same manner as non-disaster HPP (FPL) projects.  HPP Provides funding for emergency / disasters based on ERFO guidelines. HPP program accepts projects that would otherwise have met the ERFO requirements but did not meet the funding minimum – $700,000. If a project is accepted by ERFO and is less than $700,000 HPP program WILL fund project and will assign higher priority (see time-line).  One (1) disaster related project submitted for FY05.

Bureau of Indian Affairs November 2005 IRRHPP Emergency / Disaster  Notify the ERFO FLH  The ERFO Program offers amounts that exceed the IRRHPP $1 Million limitation  HPP Project (event) may trigger others (Agencies) to meet the dollar threshold.  Requirements  Inventory  Tribal Resolution

Bureau of Indian Affairs November 2005 BIADOT/FLH Determine Eligibility and Rank  Robert Frazier, BIADOT  John Seabrook, FLH-FHWA  Greg Newhouse, BIA-Midwest Region, GLA  Tim Walker, BIA-Rocky Mountain Region  Charles Riley, BIA-Southwest Region  Meetings – (2) March, (1) June,(1) August

Bureau of Indian Affairs November 2005 HPP Project Scoring  HPP projects scored numerically based on Appendix A Subpart C matrix  Disaster projects – NOT scored according to matrix.  Scoring methodology based on rule and intent of program.

Bureau of Indian Affairs November 2005 Scoring Elements  Accident & Fatality Rate for Candidate Route.  HPP Committee recently concluded this scoring element. Intent was to utilize National Highway Traffic Safety Board Standards, but standards did not exist.  Committee recommends use of the State of Colorado, Weighted Highway Index. Score will be evaluated relative to a national average based on data submitted.  Required Data Elements – AADT, Crash Severity – Fatality, Injury, and Property Damage Only.  Supply data if it exists – utilize state DoT data if available.  Will Score a ‘0’ if no data is supplied or if the data is not verifiable or of the correct format SevereN/AModerateMinimalNo Accidents

Bureau of Indian Affairs November 2005 Scoring Elements  Years Since Last IRR CONSTRUCTION Project Completed.  Program intent is to award tribes that haven’t had a recent project.  Term NEVER applies to pre BIADoT Verification Never> 10 Years5 - 9 Years1 - 4 yearsHas Project

Bureau of Indian Affairs November 2005 Scoring Elements  Readiness to Proceed to Construction OR IRRBP Design Need.  Intent of the program is to award based on readiness to go into construction.  Bridge component included due to the fact that IRRBP $$ cannot be used for PS&E development for bridges.  PS&E Development for roads or other IRR facilities OK, however usually low $ and within most tribes allocation amount.  Requires verification of APPROVED PS&E PS&E Complete and Approved Bridge Replacement PS&E Development Project Bridge Rehabilitation PS&E Development Project Non-Bridge PS&E Development Project N/A

Bureau of Indian Affairs November 2005 Scoring Elements  Percentage of Project Matched by Other Funds.  Intent of the program is to award based on projects that are cooperative in nature.  IRR Funds CANNOT be used as matching funds.  Cannot use Soft Match $$ – Land, Labor etc.  Percentage Based on Project Total  Requires verification N/A 80 % or More By Other Funds 20 – 79 % By Other Funds 1 – 19 % By Other Funds No Match

Bureau of Indian Affairs November 2005 Scoring Elements  Amount of Funds Requested  Maximum of $1,000, N/A< $250,000 $250,001 - $500,000 $500,001 - $750,000 Over $750,000

Bureau of Indian Affairs November 2005 Scoring Elements  Geographic Isolation  Maximum score clearly geared towards AK. Isolated from the rest of the world. Water or Air only.  Substandard Primary and Secondary Access scoring methodology tied to IRR Inventory. Classification and Construction Need.  Substandard Access to Tribal Facility – Only Construction need is looked at for these routes.  Requires verification by means of IRR Inventory and other data – maps – helps clarify scoring.  Regional HPP Coordinator will assist during first level review No External Access to Community Substandard Primary Access to Community Substandard Secondary Access to Community Substandard Access to Tribal Facility N/A

Bureau of Indian Affairs November 2005 Scoring Elements  All Weather Access Elements: Employment – Commerce – Health – Safety – Education – Housing.  HPP Committee recently concluded this scoring element. Need clarification of ‘All Weather Access’. Decided to score all FY05 applications a ’10’ until clarification.  All Weather Access defined by FHWA as a facility that meets eligibility requirements for funding. All IRR eligible projects meet the All Weather Access criteria. The project / route would then have to include verification of the elements above and be scored accordingly.  Requires verification, by means of a map, showing project (route/section) provides direct access to each element being scored Addresses all 6 elements Addresses 4 -5 elements Addresses 3 elements Addresses 2 elements Addresses 1 element

Bureau of Indian Affairs November 2005 HPP Time-Line  November 30 - HPP Review Committee currently putting together guidelines which will include a first level review of applications at the Regional Level. IRR verification / TIP etc.  December 31 - BIA will officially receive Applications / Proposals. Cut- off Date.  January 31 – BIA will notify all tribes and regions of acceptance of applications (applications were received).  March 31 - HPP Review Committee reviews and scores applications in accordance with Appendix A Sub-Part C. A Funding Priority List (FPL) will be generated and all unaccepted applications (based on eligible criteria) will be returned to applicant with explanation of deficiencies. BIA will then place projects listed on the FPL on an IRRHPP TIP and forward to FHWA for approval.  April 15 – Notify all approved applicants of their projects on the FPL.  May 15 – Funds are distributed to BIA Regions or Tribes.

Bureau of Indian Affairs November 2005 HPP Time-Line  August 15 - HPP Funds need to be obligated. Regions will obligate funds according to established procedures. If funds ear-marked for a project cannot by obligated they will be returned to FHWA and redistributed the following FY to those approved projects.  Three Years – If funds not expended from the time the project is listed on the FPL they will be forfeited and returned to the HPP pool.  If HPP available funds exceed the accepted HPP project request $$ - the funds will be redistributed by the Relative Need Distribution Factor. The amount of available funds are those identified at the beginning of the FY.

Bureau of Indian Affairs November 2005 IRRHPP Application Process  BIADOT/FHWA is currently reviewing existing application procedures and enhancing the process to include the following:  Application Form w/ instructions  HPP Application Process Flow-Chart  HPP Application Check-list  HPP First Level Review at the Regional Level – Coordinate applications with your Regional HPP Coordinator.

Bureau of Indian Affairs November 2005 IRRHPP Application Process  HPP Application / Proposal must include the following:  Project description and scope of work.  Budget break-down and amount of funds requested.  Supporting Tribal Documents to include a Tribal Resolution supporting the proposal AND establishing project as the HIGHEST priority for the tribe AND authorizing the project to be placed on the HPP TIP.  Supporting IRR documents – Inventory verification – PS&E verification (if applicable) – any verifiable documents for scoring requirements (matching funds, accident data, strip map to address all weather access element )

Bureau of Indian Affairs November 2005 FY05 IRRHPP  FY05 HPP Approximately 7.5 Million at the beginning of FY05.  BIA DoT Received 31 HPP Applications this FY for $22,524,021 avg. approx 709K per application.  Results:  13 scored and placed on the FY05 FPL.  13 declined due to incomplete PS&E.  1 declined – Not in IRR Inventory.  1 declined due to incomplete documentation of Tribal Action.  3 declined due to sufficient annual IRR allocation.  1 Emergency / Disaster related application.

Bureau of Indian Affairs November 2005 IRRHPP Conclusion  Good program – Intent is geared towards tribes with insufficient annual funding and needs (safety, emergencies etc.)  Very competitive program  Apply  Work with your designated Regional HPP Coordinator.  Process may change as HPP Review Committee as well as IRR Coordinating Committee provide input and recommendation.  FY05 Not a typical year – Funding, New Rule, No Transportation Bill.