Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

TPC / PHOS / HLT Readout Electronics overview Annual Evaluation Meeting for CERN-related Research in Norway November, 2004 University of Oslo Kjetil.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
DAQ for the TPC Sector Test at Test Beam T10 ALICE DAQ Group ALICE TPC Collaboration Meeting Cagliari, Sardinia 16 – 17 May 2004.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
Normal text - click to edit Status Report TPC Electronics Meeting, CERN Johan Alme & Ketil Røed, UoB.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
Normal text - click to edit Trigger interface module Kjetil Ullaland, Sten Solli, Johan Alme TPC Electronics meeting. CERN Jan 2005.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Sept TPC readoutupgade meeting, Budapest1 DAQ for new TPC readout Ervin Dénes, Zoltán Fodor KFKI, Research Institute for Particle and Nuclear Physics.
LP TPC DAQ Ulf Mjörnmark Lund University Present understanding and plan.
UNIVERSITY OF BERGEN DEPARTMENT OF PHYSICS 1 UiB DR 2003 High Level API for the TPC-FEE control and configuration.
RCU Status 1.RCU hardware 2.Firmware/Software 3.Test setups HiB, UiB, UiO.
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
Normal text - click to edit Configuring of Xilinx Virtex-II Kjetil Ullaland, Ketil Røed, Bjørn Pommeresche, Johan Alme TPC Electronics meeting. CERN
Understanding Data Acquisition System for N- XYTER.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
Front-end Electronics for the Alice Detector Kjetil Ullaland Department of Physics and Technology, University of Bergen, Norway NFR meeting, University.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
1 Dong Wang, Yaping Wang, Changzhou Xiang, Zhongbao Yin, Fan Zhang, Daicui Zhou (Huazhong Normal University, China) Status and planning on common readout.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
17th March 2005Bernardo Mota / CERN - PH TPC FEE Status and Planning CERN, 7th March 2005 Content  Introduction  Status and Milestones  PASA, ALTRO.
Communication Layers Protocol Commands Results Command Specs Command Framework Database Access PVSS Server TOC ,
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
TPC electronics Status, Plans, Needs Marcus Larwill April
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
PCI coreGlue logic SIU card PCI bus FPGA APEX20k400 internal SRAM I/O onboard SRAM 32k x 16 FLASH EEPROM FEE-bus daughter board TPC RCU prototype I Commercial.
Readout Control Unit of the Time Projection Chamber in ALICE Presented by Jørgen Lien, Høgskolen i Bergen / Universitetet i Bergen / CERN Authors: Håvard.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Ketil Røed - LECC2005 Heidelberg Irradiation tests of the ALICE TPC Front-End Electronics chain Ketil Røed Faculty of Engineering, Bergen University.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
Radiation Tolerance Studies using Fault Injection on the Readout Control FPGA Design of the ALICE TPC Detector Johan Alme Bergen University College, Norway.
News from the 1m 2 GRPC SDHCAL collection of slides from : Ch.Combaret, I.L, H.Mathez, J.Prast, N.Seguin, W.Tromeur, G.Vouters and many others.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
Firmware for the CPLD on the RCU
The STAR Heavy Flavor Tracker PXL detector readout electronics
Status of the Front-End Electronics and DCS for PHOS and TPC
xTCA interest group meeting
RCU3 –> RCU4 New Schematics
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
Torsten Alt, Kjetil Ullaland, Matthias Richter, Ketil Røed, Johan Alme
Commissioning of the ALICE-PHOS trigger
TPC Electronics Meeting, 13/01/05 Carmen González Gutiérrez
TPC Electronics Meeting - DDL related Software -
Presentation transcript:

Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme

Normal text - click to edit Content Overview RCU - Read Out Control Unit DCS – Detector Control System Event Readout Test results Ongoing Work

Normal text - click to edit Overview

Normal text - click to edit RCU – Read Out Control Unit Hardware entirely developed by Bergen. Firmware a collaboration between Bergen and CERN Tasks –Shipping event data from the Front End Cards to the DAQ (Data Aquisition) –Distributing Triggers –Communication with the Front End Electronics

Normal text - click to edit RCU RCU Architecture Trigger IF Status Register Slow Control Active FEC list ALTRO IF Instuction Mem Result Mem Active Ch. List Data Assembler SIU interface Command Interpreter & Bus Switch FEC Altro Bus I2C Bus FEC RCU bus DCS SIU Trigger information DATA PATH RCU Bus has been tested in a 12h stress-test with approximate 200 billion transactions without any error

Normal text - click to edit DCS - Detector Control System Collaboration between Bergen and Heidelberg Tasks –Configuring the RCU FPGA –Configuring the Frond End Electronics Cards (FEE) –Monitoring/Controlling of the FEEs –Configuration of the Trigger system.

Normal text - click to edit DCS Architecture ARM Processor Ethernet IF JTAG master ADC readout RCU Bus IF RCU FPGA Config Dim connector (RCU) TTCRX RCU bus Triggerinfo ADCs JTAG Ethernet

Normal text - click to edit Firmware/Software on DCS DIM client ShellDIM server Linux Kernel Driver Module Interfaces Intercom layer Direct login (SSH) Software Firmware (FPGA) Direct Login via SSH used in TPC and PHOS beamtests. DIM server and DIM client development is ongoing.

Normal text - click to edit FEC Linuxshell sendRCUcommand Event Readout example DCS RCU FEC Altro IF Trigger IF Data Assembler SIU IF FECs Daq 1. Configure system to wait for trigger 2. FEC collects data when L1 trigger. 3. RCU reads event when L2a trigger and ships it through the datapath to the DAQ. 4. When done, RCU again waits for new trigger. w 0x7000 0x64000a w 0x7001 0x w 0x7002 0x64000b w 0x7003 0x w 0x7004 0x64000c w 0x7005 0x70000f w 0x7006 0x3b0000 w 0x7007 0x w 0x7008 0x w 0x7009 0x wait 1 us r 0x0 w 0x8800 0x w 0x x0000 w 0x6498 0xffff w 0x649A 0xffff w 0x649B 0xffff w 0x649C 0xffff w 0x7802 0x10bb8 wait 1 us Trigger info L1 Trigger Buffering event... L2 accept Trigger Important: Only RCU FPGA is directly in the datapath.

Normal text - click to edit Configuration & Readout Transporter to DCS scripts RCU buffer FEC 3200 active channels 1000 samples/channel < 1 s0.7 s3 s Overall configuration data: 7MB/RCU – Worst case scenario  Max 4,7 s for configuration Readout: 3 ms

Normal text - click to edit TPC Beamtest results

Normal text - click to edit Test results Successfully used in the TPC beamtest. Successfully used in the PHOS beamtest. More systems are running smoothly in a lab environment.

Normal text - click to edit Ongoing work Change the FPGA on the RCU board from Altera to Xilinx for better handling of radiation –Test-card –New RCU board prototype (  Mass production late 2005) –Hardware & Firmware for automatic reconfiguring of RCU –Extensive testing of radiation harness Firmware for voltage and temperature measurements Firmware for trigger interface module.