University of Alaska Anchorage Annual Budget Meeting August 4, 2009 1.

Slides:



Advertisements
Similar presentations
UNIVERSITY OF ALASKA FAIRBANKS Capital Projects Update Admin Services Open Forum October 11, 2011.
Advertisements

Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
Student Achievement Is on the Rise Our District provides a quality, well-rounded education for students Student achievement on statewide exams has steadily.
Pleasanton ISD Long-Range Master Plan for PreK-12 October 2014 Board of Trustees Meeting.
Fiscal Year 2010 Budget Recommendations Presented to the Illinois Board of Higher Education January 27, 2009.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
UA & the Alaska Native Community Our Relationship Dana L. Thomas Ph.D. Vice President for Academic Affairs 1.
Current Project Update October 25th 2012 Good Evening!!!
| 1 The Municipal Farm Sustainable Reuse Plan Project funded through a Brownfields Area-Wide Planning Pilot Grant from the United States Environmental.
FY15 Operating and Capital Budget Requests 8 August 2013.
Campus Master Plan 2012 Update University Senate November 6,
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholde r to insert your own image. Farmington.
The Minnesota State Colleges and Universities system is an Equal Opportunity employer and educator. Building for Minnesota’s Future 2014 Capital Bonding.
Capital Financial Plan and Physical Design Framework DRAFT Committee on Grounds and Buildings May 2010.
ENERGY CONSERVATION & MODERNIZATION FOR GLENDALE COMMUNITY COLLEGE
1 UAS Campus Masterplan December 2012 Draft. 2 PRIOR WORK - INPUTS –UAS Masterplan 2009 – Accreditation Review 2010 – UAS Strategic & Assessment.
The Green Line to Success Visit us at
September 2011 HEALTH PROGRAMS UPDATE. ALASKA HEALTH WORKFORCE COALITION.
1 Board of Trustees FY 2009 Budget Presentation F. John Case, Ed. D. May 19, 2008.
Legislative Request DATE September 10, 2010 President France A. C órdova Indiana Commission for Higher Education.
ALASKA ’ S FIRST UNIVERSITY  AMERICA ’ S ARCTIC RESEARCH UNIVERSITY UAF FY13 Budget Request Adapted from August 2011 presentation to UA Statewide Administration.
FY13 Budget Priorities 8/9/ The mission of the University of Alaska Southeast is student learning enhanced by faculty scholarship, undergraduate.
FY12 Budget Priorities FY11 Performance Expectations FY12 Strategy for Performance 8/9/
Bay Area Community College Consortium – Health Workforce Initiative Collaborative Partnership Cynthia Harrison, RN, MS Interim Director, Health Workforce.
Indiana College & Career Pathways
FY14 Budget Priorities August UAS Mission UAS Core Themes  Student Learning enhanced by faculty scholarship, undergraduate research and creative.
Facilities And Campus Services Fall 2007 Update. Facilities & Campus Services Stats: 74 full time staff (31 professional and 43 Local 6070); 25 Seasonal/Students.
Building for Their Future Dublin Unified School District.
ALASKA ’ S FIRST UNIVERSITY  AMERICA ’ S ARCTIC RESEARCH UNIVERSITY FY 12 Budget Request Presentation August ALASKA ’ S FIRST UNIVERSITY  AMERICA.
UAF research leads to inventions Invention Disclosures by Year.
1. DRAFT 2 Encourage Economic Growth Establish Regional Branding Committee Identify two Businesses to Receive SEED Incentive Grants Complete Construction.
Planning for the Future: 2011 Updates to the Florida Atlantic University Work Plan Florida Board of Governors June 22, 2011.
Academic Budget Presentation March 4, FY05 University Budget Unit Description NonExempt BudgetExempt Budget Total Budget President's Units 2,121,8942%
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Our Roles as Stewards of Collaborative Excellence.
South Seattle Community College BUDGET HEARING June 16, 2009.
1 Fiscal Year 2008 Budget Recommendations Presented to the Illinois Board of Higher Education February 22, 2007.
Local Control Funding Formula (LCFF). All students will be college and career ready. All students will have a safe, orderly, and inviting learning environment.
COMMUNITY COLLEGE SYSTEM OF NH Chancellor Ross Gittell September
Facilities Maintenance Status Report John Ozurovich, Director Facilities – Saddleback College John Edwards, Director Facilities – Irvine Valley College.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
1 Energy Efficiency & Utilities Sector March 2014 CALIFORNIA COMMUNITY COLLEGES CHANCELLOR’S OFFICE.
June 18, 2009June Regular Board Meeting Tuition Increase Recommendation FY 2010 June 18, June Regular Board Meeting With the assumption that the.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
1 FY County Manager’s Recommended Capital Budget July 18, 2006.
South Seattle Community College BUDGET HEARING Fiscal Year June 6, 2006.
Learn, Engage, Change FY16 BUDGET REVIEW 1. Learn, Engage, Change UAS Mission Student Learning enhanced by faculty scholarship, undergraduate research.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Leeward Community College Fall Semester 2011 Convocation.
Budget Summary Town Hall Report September 22 & 23, 2009.
FISCAL YEAR 2009 BUDGET RECOMMENDATIONS FOR HIGHER EDUCATION Illinois Board of Higher Education February 22, 2008.
Fiscal Advisory Committee Highlights. Committee Charge The purpose of this committee shall be to review the University's fiscal resources and.
Operating Budget Funding Sources State Appropriations - General Revenue Formula Funding, Special Items, Benefit Cost Sharing THECB Transfers TX Grant,
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
A Great Place to Study, Live, Teach, Work. Current UAA Churn Schedule –2007/08 GOAL 1: Provide Space in 3 rd Floor SSB for Joint PhD program—Capital Funded.
University of Hawai‘i Community Colleges Use of Perkins Funds Carl D. Perkins Career and Technical Education Act of 2006.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
1. Community Update Butte College Spring 2016 Providing Affordable Higher Education and Job Training in Our Community Proudly Serving Butte and Glenn Counties.
Perkins End of Year Evaluation Lenoir Community College.
South Seattle Community College BUDGET HEARING FY June 5, 2013.
6/13/20161 South Seattle Community College College-wide Meeting Budget Planning for FY March 10, 2008.
Measure G Bond Projects. Message from the President ….. Monument Refurbishment Project.
MIRACOSTA COMMUNITY COLLEGE DISTRICT
SOCCCD Basic Aid Allocation Recommendation FY
University of Alaska Anchorage
Fiscal Year 2009 Budget Recommendations
Strategic Budget & Planning Council Capital Improvements Plan
Capital Outlay Workshop
Presentation transcript:

University of Alaska Anchorage Annual Budget Meeting August 4,

Cabinet Strategic Guidance Budget building processes based on UAA 2017 and UA 2009 strategic plans Accreditation process requires links between analysis, planning and budgeting UAA will preserve and build on success of last 10 years Strengthen instruction, student success initiatives and research 2

FY10 Budget Process Budget units presented funding requests for FY10 and FY11 to PBAC (Planning and Budget Advisory Council) Performance based reallocation of $880.3 Internal reallocations include: Engineering BSE Faculty Mandatory Advising Center for Economic Development ISER Energy Economist 3

FY11 Operating Budget Request Operating Program Increments Total requests submitted to PBAC - $13,271.2 Recommended to Chancellor’s Cabinet - $7,118.2 Highest priority needs - $4,

FY11 Operating Budget Request Operating Program Increments Primary focus on health and engineering programs – high demand jobs, enhancing research, and ensuring student success Highest priority needs - $4, Health programs 3 Engineering programs 1 Teacher Ed 2 Student Success 3 WFD 1 Energy 5

FY11 Operating Budget Request High Demand Jobs priority programs include: Dietetics and Nutrition Program Expansion (Health) Clinical Rotations/Health Pipeline (Health) Occupational Therapy Liaison/Lab (Health) Ultrasound Faculty (Health) BSE/CE Faculty (Engineering) Pharmacy Careers Faculty/Liaison (Health) Physical Therapy Careers Faculty/Liaison (Health) Human Services Faculty (Health) Faculty/Job Internship Program (Engineering) Process Technology – KPC (WFD) Nursing Clinical Coordinator (Health) Architectural/Engineering Faculty (WFD) AAST Vocational Program – KOC (WFD) Renewable Energy Program – MSC (Energy) 6

FY11 Operating Budget Request Student Success priority programs include : Nursing Tutor Coordinator (Health) Health Student Services Coordinator (Health) ANSEP Advising/Outreach (Engineering) Supplemental Instruction (Student Success) Honors College (Student Success) Research priority programs include: Stress Physiology Faculty (Health) Biostatistics & Epidemiology Faculty (Health) Clinical/Translational Science Faculty (WWAMI) (Health) Alaska Education Policy Research (Teacher Ed) 7

FY11 Operating Budget Request Total fixed cost request - $3,221.0 Includes: Integrated Sciences Building Lease Costs Emergency Preparedness University Advancement 8

UAA FY11 Capital Request Renewal Academic Equipment New Construction 9/18/ :12 PM

UAA FY11 Capital Budget Summary R&R Requirement Community Campuses22 Projects: $ 35.5M Anchorage24 Projects: $113.6M New Construction Requirement Community Campuses 8 Projects: $ 43.7M Anchorage9 Projects: $152.6M R&R Request (Recommended) Community Campuses 13 Projects: $ 21.4M Anchorage13 Projects: $ 79.6M New Construction/Planning/Design Request (Recommended) Community Campuses3 Projects: $ 31.6M Anchorage4 Projects: $ 125.8M Academic Equipment $11.4M 9/18/ :12 PM

UAA FY11 Renewal and Renovation Community Campuses have 22 Projects for $35.5M Anchorage has 24 Projects for $113.6M Project Priorities Include:  Fire System Upgrades  Connection to City Water Source  Science Building Renewal/Backfill  BMH Renewal/Backfill  Engineering Building Renewal/Backfill  HVAC System Repair and Replacement  Roof Replacement (ULB, VOC REHAB, EMs)  Mechanical Electrical Upgrades  Energy Conservation 9/18/ :12 PM

Renewal Community Campuses – Top 13 Community Campuses$21.4M 1. Community Campus Fire System Upgrades$1,000 K 2. KPC Water Connection$ 600 K 3. PWSCC Wellness Center$3,600 K 4. Mat-Su HVAC, Boiler, Ex Fan Renewal$2,440 K 5. Kodiak Campus Renewal$3,880 K 6. Kachemak Bay Building Renewal$ 600 K 7. KPC HVAC and Boiler Renewal$1,000 K 8. Community Campus Safety, Code ADA$1,000 K 9. Mat-Su Student Services Remodel (FSM)$ 580 K 10. PWSCC Parking and Security Upgrades$1,665 K 11. Mat-Su Science Lab Renewal Ph II$ 570 K 12. Mat-Su Card Key Access $ 555 K 13. PWSCC Campus Renewal $3,900 K Note: UAA’s CC SF share of $50M is 4.5% or $1.8M 9/18/ :12 PM

UAA Renewal Main Campus -Top 13 UAA Main Campus$79.6 M 1. Science Building Renewal /Backfill$10.2 M 2. BMB Renewal /Backfill$10.3 M 3. Engineering Building Renewal/Backfill$ 3.5 M 4. Consortium Library Old Cores Mech$ 1.7 M 5. Fine Arts Mech Systems Renewal$ 7.5 M 6. MAC Housing Renewal$12.0 M 7. Campus Roof Replacements$ 5.0 M 8. Campus HVAC Upgrades$ 1.0 M 9. EM1 and EM2 Mechanical $ 1.5 M 10. Roads/Curbs/SW$ 6.4 M 11. Mech/Elec System Upgrades$ 1.5 M 12. Cuddy Phase II$11.0 M 13. SSB Phase IV$ 8.0 M Note: UAA’s SF share of $50M is 22.8% or $11.4M 9/18/ :12 PM

UAA FY11 New Construction—Top 3 - $31.6M Community Campuses—8 Projects; $ 43.7M 1. Kenai Career and Technical Ed Ctr$ 13.0M 2. Kodiak Vo-tech and Warehouse$ 15.1M 3. Mat-Su Paramedic Classroom Add$ 3.5M 4. KPC Student Housing ($17.5M) Design$ 1.8M 5. Mat-Su Trunk Road Entrance and Signage$ 1.1M 6. PWSCC Lecture Hall/Classroom Add$ 2.2M 7. Mat Su VCAL ($61M)—Design $ 6.5M 8. KPC Homer Hesketh Island Site Planning $.5M Note: 10 year New Construction Ave= $1.9M/Yr 9/18/ :12 PM

UAA FY11 New Construction—Top 4 - $125.8M UAA- 9 Projects for --$152.6M 1. Sports Arena $ 65.0M 2. Engineering Classroom Lab Research Bldg Ph I $ 50.0M 3. Health Sciences Bldg Ph ll (P/D)$ 7.0M 4. Health Sciences Parking Struct and Bridge (P/D)$ 3.8M 5. Student Housing Ph II ($14.1/$7.9)$ 14.1M 6. Library and Native Student Resource Center (P/D) $ 2.0M 7. Honors College/Chester CK CRB (P/D)$ 3.8M 8. Aviation Renewal (P/D)$ 4.5M 9. East Campus Quad Pathways $ 2.5M Note: 10 year New Construction Ave= $17M/Yr 9/18/ :12 PM

UAA FY11 Capital Budget Academic Equipment $11.4M KPC Welding Lab --$1.70M Mat-Su Instructional Wind Generator--$0.8M Sciences/Engineering Replacement Equipment--$1.9M Arts—Theater/Auditorium Seats and Curtain Replacement--$1.0M Anchorage Lab Support for High Demand Jobs--$2.16M Alaska Energy Data Network (ISER)--$0.250M Smart Classroom & Instructional Phone Booths--$0.711M Alaska Energy Initiatives Faculty Support Staff--$0.400M Anchorage Support for Program and Institute Accreditation--$0.54M Comm Campus-Instructional Quality and Distance Delivery--$0.25M Anchorage Program Quality and Distance Delivery--$0.855M Program on Energy, Climate Change, and the Economy -- $0.300M Undergraduate Student Energy Internship--$0.500M 9/18/ :12 PM

UAA FY11 Capital Renew, Repair, Keep Safe, Grow 9/18/ :12 PM