1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.

Slides:



Advertisements
Similar presentations
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Advertisements

Overview of the IEEE Process IEEE P1620 Working Group Meeting 18 September 2002.
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Doc.: IEEE Submission March 2006 Robert F. HeileSlide st Session of meetings of the IEEE Working Group for Wireless.
Standards Review Subcommittee Update April 30, 2013.
Standards Review Subcommittee Update February – April 2008 May 13, 2008 DRAFT.
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 30, 2009 Eric Winkler, Ph.D. Project.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Western Electricity Coordinating Council Market Issues Subcommittee Report to the Market Interface Committee Philip Tice October 30-31, 2008.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
IEEE P1850 IEEE-SA Support P1850 Working Group 30 June 2008 Noelle Humenick IEEE-SA.
IEEE mc Closing Report for March 2015
NERC/GADS Reporting Requirements John Yale Hydro Plant Engineering Manager Chelan County PUD 1.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Data Coordination Working Group (DCWG) Status Report Chuck Chakravarthi Chair, DCWG April 2008.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
The Standards Development Process IEEE Gary Hoffman April 13, 2015.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
20th AIAA Advanced Measurement and Ground Testing Technology Conference Lessons Learned in AIAA Working Group Development E. Allen Arrington Dynacs/NASA.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 7, 2013.
Standards Review Subcommittee Update August 17, 2010.
Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
NERC STANDARDS ACTIVITIES 2/15-3/10. DATE NERC ANNOUCEMENT 03/07/07 Nuclear Plant Interface Coordination Standard Drafting Team Conference Call and WebEx.
Doc.: IEEE /0054r0 Submission March 2013 Mika Kasslin, NokiaSlide 1 TG1 Closing Report for March 2013 Notice: This document has been prepared.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Business Practices Subcommittee Update October 27, 2009.
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 1, 2014.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
P SystemC Analog/Mixed-Signal (AMS) extensions Working Group July 6, 2015 | Martin Barnasconi | P Chair.
Commercial Operations Sub-Committee Update to TAC
The Standards Development Process
Accredited Standards Committee C63® - EMC
Accredited Standards Committee C63® - EMC
TGs Montreal Closing Report
NERC Critical Infrastructure Protection Committee (CIPC) Executive Committee Public Release 29 September 2005.
Task Group G Report March 10, 2003
Data Coordination Working Group (DCWG) Status Report
July 2009 TGmb Closing Report
IEEE TGaf Waikoloa Closing Report
ARC-agenda-report-minutes-july-2011
NERC Reliability Standards Development Plan
TGaf Indian Wells Closing Report
TGaf San Francisco Closing Report
TGaf San Antonio Closing Report
NERC Reliability Standards Development Plan
IEEE P Working Group for Wireless Personal Area Networks
September 2009 TGmb Closing Report
July 2009 TGmb Closing Report
July Motions EC Meeting July 29, 2016 Manchester Grand Hyatt San Diego, CA, USA Bob Heile, Wi-SUN Alliance.
TGae Closing Report – July 2011
P802.11aq Waiver Request Introduction
Sheung Li Task Group J Chairperson March 19, 2004
TGaf San Antonio Closing Report
TGr Closing Report for March 2008
TGg Report to the IEEE Working Group
Standards Review Subcommittee Update
Presentation transcript:

1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity Status Report of activities General Meeting San Francisco, CA, USA – 6/14/2005

2 IEEE Power Engineering Society Working Group Scope: Consider revisions to existing 1987 Standard and produce a draft for approval through the IEEE ballot process.

3 IEEE Power Engineering Society Formed by the Risk, Reliability and Probability Applications Subcommittee per a request by Mike Curley, Manager of GADS services at NERC. A Task Force was formed in 2002 and upgraded to a Working Group per Standard Association requirements. Monthly teleconference/Web Conference meetings held since July 2002.

4 IEEE Power Engineering Society Official Roster indicating all WG participants. Minutes Posted by Secretary. All WG members have finished their work assignments for revised draft. Revised Draft is posted on web site for review Chair and Secretary are working with IEEE Staff in Editing Review and invitation for ballot.

5 IEEE Power Engineering Society Schedule of future activities Response to Pre-ballot mandatory Editorial coordination. Three Sections: Section 1: Items to resolve before ballot begins Section 2: Items to resolve before final recirculation. Section 3: Recommended changes. Balloting invitation by Chair.

6 IEEE Power Engineering Society Key Revision Efforts Equivalent Demand Forced Outage Rate and Demand Forced Outage Rate; Limiting conditions for forced outage indexes. Group Performance Indexes: Un-weighted (time- based); Capacity-weighted calculations for group performance indexes Pooling Methodologies for EFORd Outside Plant Management Control Review of Commercial Availability Concept