Presentation is loading. Please wait.

Presentation is loading. Please wait.

NERC STANDARDS ACTIVITIES 2/15-3/10. DATE NERC ANNOUCEMENT 03/07/07 Nuclear Plant Interface Coordination Standard Drafting Team Conference Call and WebEx.

Similar presentations


Presentation on theme: "NERC STANDARDS ACTIVITIES 2/15-3/10. DATE NERC ANNOUCEMENT 03/07/07 Nuclear Plant Interface Coordination Standard Drafting Team Conference Call and WebEx."— Presentation transcript:

1 NERC STANDARDS ACTIVITIES 2/15-3/10

2 DATE NERC ANNOUCEMENT 03/07/07 Nuclear Plant Interface Coordination Standard Drafting Team Conference Call and WebEx - March 8, 2007 03/06/07 Initial Ballot Results for the Reliability Standards Development Procedure, Version 7 02/28/07 Standards Recirculation Ballot Windows for V1 Risk Factors Open February 28-March 9, 2007 02/26/07 Nomination Period Opens for SAR Drafting Team - Disturbance Monitoring 02/26/07  Announcement of Initial Ballot Results - Version 1 Violation Risk Factors  Intent to Forward Approved Standards to NERC Board of Trustees for Adoption 02/26/07 Five-day Ballot Window Opens for Reliability Standards Development Procedure, Version 7 02/22/07 Reliability Standards Workshop Announcement  April 19-20, 2007 - Orlando, Florida  April 23-24, 2007 - San Diego, California 02/15/07 Three 30-day Comment Periods Open February 15, 2007:  SAR to Amend the Assess Transmission Future Needs and Develop Transmission Plans SARAssess Transmission Future Needs and Develop Transmission Plans  First Standard (MOD-001-1) in the Series of ATC/TTC/AFC Revisions  Second Draft of SAR for Backup FacilitiesBackup Facilities

3 Standards Under Development Standard Title Start DateEnd Date Current Ballots Violation Risk FactorsViolation Risk Factors (Version 1 Recirculation)02/28/0703/09/07 Posted for 30-day Pre-ballot Review (Open Ballot Pools) Balance Resources and DemandBalance Resources and Demand (BAL-007 through BAL-011)02/15/0703/16/07 Nuclear Plant Interface CoordinationNuclear Plant Interface Coordination (NUC-001)02/15/0703/16/07 Urgent Action SARUrgent Action SAR (INT-005-2, INT-006-2, INT-008-2)02/15/0703/16/07 Interpretation RequestInterpretation Request - BAL-005-0 - Automatic Generation Control02/07/0703/09/07 Posted for Comment Frequency ResponseFrequency Response (Project 2007-12)02/08/0703/09/07 System Restoration and BlackstartSystem Restoration and Blackstart (Project 2006-03)02/08/0703/09/07 Underfrequency Load SheddingUnderfrequency Load Shedding (Project 2007-01)02/08/0703/09/07 Assess Transmission Future Needs and Develop Transmission PlansAssess Transmission Future Needs and Develop Transmission Plans (Project 2006-02) 02/15/07 03/16/07 ATC/TTC/AFC and CBM/TRM Revisions ATC/TTC/AFC and CBM/TRM Revisions (Project 2006-07) 02/15/07 03/16/07 Backup FacilitiesBackup Facilities (Project 2006-04) 02/15/0703/16/07 Drafting Team Nominations Open Disturbance MonitoringDisturbance Monitoring (Project 2007-11)02/26/0703/09/07


Download ppt "NERC STANDARDS ACTIVITIES 2/15-3/10. DATE NERC ANNOUCEMENT 03/07/07 Nuclear Plant Interface Coordination Standard Drafting Team Conference Call and WebEx."

Similar presentations


Ads by Google