Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW 2015 27 April 2015.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Fermilab New Tuner J. Reid M. Slabaugh August 6, 2014 J. Reid 1.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Booster 15Hz Operation John Reid March 4, Fermilab March 4, 2014J. Reid 2 Scope Brief History of Booster RF systems RF system description Modifications.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP- BOOSTER RF Tuner and Cavity Refurbishment 3/7/12 M. Slabaugh.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 11/04/2013.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
Refurbished Booster RF John Reid October 24, 2012.
Refurbished Booster RF John Reid December 12, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Complementary ISTC Projects #3888, 3889p
Definition of work flow for string DESY Example on critical operation
RF operation of REX-ISOLDE
Presentation transcript:

Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015

Topics Proton Improvement Plan (PIP) Booster Radio Frequency (RF) Cavities Cavity Refurbishment Tuner Refurbishment Planning for failure Testing and Summary 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment2

Booster RF Cavity 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment3 Circa bid drawing (obsolete) Critical advantage: Access to retired personnel with development knowledge

Cavity Refurbishment- Scope 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment4 Vacuum Misc. RF Contact Cavities are radioactive and fragile!

Cavity Refurbishment- RF Contact 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment5 Milling improved quality, reduced time and distance (dose). ~ 7 days  2 days Insufficient contact = heat and RF leakage

Cavity Refurbishment- Vacuum Repair and Upgrade 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment6 Leaking “pie-tin” quick disconnect flange Removal with Wach’s tool Replace with solid flange

Cavity Refurbishment 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment7 Water cooling repair/upgrade Alignment fiducials installed Improvised repair tooling Internal sparking and damage

Tuner Refurbishment 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment8 Contact surfaces Cones Cooling lines Each tuner: 500+ pieces 150ft+ tubing 50+ water connections 44in long 650lbs Each tuner: 500+ pieces 150ft+ tubing 50+ water connections 44in long 650lbs Ferrite

Tuner Refurbishment 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment9

Tuner Refurbishment- Risk 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment10

Tuner Refurbishment- Procurement and challenges 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment11 Difficult procurement –Stock items not stock (tube sizes) –Common processes no longer common –Unusual materials Original drawings not updated –Undocumented revisions –All hand drawings, no CAD Little data available for optimizing design changes or benchmarking

Tuner Refurbishment- Planning for failure Have begun building new tuner assemblies Potentially replace all refurbished tuners with new 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment12

Cavity Testing and Summary Each assembly tested for two weeks prior to install Thermal sensors near critical surfaces for real time data Beginning production of two spare cavities 4/27/2015M. Slabaugh | Fermilab PIP Booster Accelerator RF Cavity Refurbishment13 17 of 20 cavities installed 50 tuners refurbished 3 tuners built new