The next call FP6-2004-Infrastructures-5. FP6-2004-Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.

Slides:



Advertisements
Similar presentations
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
Advertisements

8 April 2003 Annex III of the model contract Networks of Excellence Training session for FP6 National Contact Points, Brussels, 8 April 2003 Colette Renier,
European Commission DG Research SMcL Brussels SME-NCP 23 October 2002 THE 6th FRAMEWORK PROGRAMME Economic & Technological Intelligence S. McLaughlin.
Science, research and development European Commission THE FIFTH FRAMEWORK PROGRAMME B. Magis ACT/campagneinfo/slides/AG/AG6/5FP/conparEN.ppt.
Information about the Integrated Infrastructures Initiatives (I3) instrument Daniel Pasini EC, DG Research, Unit B3 – Research Infrastructures EC, Brussels,
Guide for Proposers Research Infrastructures Integrated Infrastructure Initiative - I3 Bernhard FABIANEK European Commission,
Research Infrastructures Content of Call 3 Hervé PERO European Commission, DG RTD Istanbul - 7 th November 2007.
1 Supporting the cooperation and coordination of research activities carried out at national or regional level The “ERA-NET” Scheme
Page 1 Marie Curie Schemes Science is not the whole story! (How to write a successful Marie Curie RTN Proposal) Siobhan Harkin.
European Commission - Marie Curie Actions. Intra-European Fellowships for Career Development Call identifier FP7-PEOPLE-2009-IIF Closing Date: 18 August.
1-1 PRESENTER The Role of the Framework 7 Advisor Your Name Your Websites Websites
Success factors in grant applications and research projects: seminar.
SWOT and User Needs Workshop, DLR Oberpfaffenhofen, 5-6 July 2006 HYRESSA - HYperspectral REmote Sensing in Europe specific Support Actions 1 HYRESSA HYperspectral.
The ‘Youth in Action’ Programme - a tool for the empowerment of young people.
EC -DG Research Dir. D : Human Factor, Mobility and Marie Curie Actions Certain elements of this presentation are subject to revision Human Resources and.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
Results of call for DS, CNI, AM 2. Information on next call for TA, I3, CA, AM 3. Towards Research Infrastructures in FP7 Presentation.
Research Infrastructures 2004 Call for: Integrating Activities Transnational Access Accompanying Measures.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
FP6 Thematic Priority 2: Information Society Technologies Dr. Neil T. M. Hamilton Executive Director.
“ERA-NET” 24 April Cooperation and coordination of national or regional research and innovation activities (i.e. programmes) FP6 Launch Conference.
Companies and the Sixth Framework Programme. Agenda Overview of the 6 th Framework Programme (FP6) Why participate ? Industry participation in FP6 What’s.
Research Infrastructures The Research Infrastructures in FP7.
The SEE-ERA.NET project - a brief overview on the interim project results.
ESF greets and welcomes you in Obergurgl!. Dr. Aigars Ekers ESF-EUROCORES Coordinator PESC - Physical and Engineering Sciences Unit ESF and.
INCO GTN meeting, Paris, 21/10/2010 Activities of International Cooperation Capacities Programme INCO-LAB & INCO-HOUSE activities Philippe Froissard Deputy.
Research Infrastructures Infodays in Greece December 20 and 21, 2004.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Sixth Framework Programme INTRODUCTION . Contents Contents of FP6 Instruments in FP6 Financing Budgets Timetable Highlights.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
EARLINET-ASOS Symposium 20 September 2010, Geneva, Switzerland EARLINET: Future plans Gelsomina Pappalardo Consiglio Nazionale delle Ricerche-Istituto.
Regional Dimension of the 7th Framework Programme Regions of Knowledge 2008 Calls Camelia DOGARU (DG RTD- B.4)
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
EU-JordanNet Enhancement of Jordan-European S&T Partnerships To the attention of European and Jordan Institutions: Initial Training Network (ITN) PEOPLE.
Research Infrastructures in FP7 Gerburg Larsen European Commission, DG Research, RTD-B3 EUDET Annual Meeting Palaiseau/FR, 09 October 2007.
Research Infrastructures in FP7 Christian Kurrer European Commission, DG RTD EURONS/EURISOL Town Meeting
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
FP7 – Capacities Research Infrastructures and Research for the Benefit of SMEs.
Regions of Knowledge WP and calls for proposals 2008 Warszawa, European Commission DG RTD/B4 Anna Rémond.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
Specific Activities Covering a Wider Field of Research New and Emerging Science and Technology IGLO, December 2003 New and Emerging Science and Technology.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Science, research and development European Commission DG RTD A-2/Peter Härtwich 09/2001 Associated candidate countries in the 5th Framework Programme Associated.
Danish Agricultural Advisory Service National Centre Possibilities and limits in a Specific Support Action By Erik Fog and Michael Tersbøl, DAAS European.
DG ResearchEuropean Commission RTD 06/FK/lb 09/2001 Special measures to further improve participation of Newly Associated States (NAS) in FP-5.
The Seventh Framework Programme for Research and Technological Development (FP7) supporting innovation Epp Tohver-Bulavs 07. November 2007, Tallinn.
COMPETITIVE AND SUSTAINABLE GROWTH Research DG European Commission Expressions of interest / Dedicated call mechanism.
Information session first joint ERANID call (Task 5 DOW) Belgian Science Policy Office 30 September 2015.
Network of Excellence in Internet Science Network of Excellence in Internet Science (EINS) 1 st REVIEW Brussels, 12th April 2013 FP7-ICT
Poznan 19 April Kwietnia 2005 Poznan FP6 The Next Calls for 2005 Technology Platforms FP7.
SUSTAINABLE DEVELOPMENT, GLOBAL CHANGE AND ECOSYSTEMS July Sub-Priority 6.3 “Global Change and Ecosystems” FP6 4 th Call for Proposals European.
INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
E u r o p e a n C o m m i s s i o n - W a r s a w 2002 Sixth Framework Programme Instruments.
1 Research Infrastructures in FP6 European Commission - Directorate-General for Research 30/10/2002 Support for Research Infrastructures in FP6 Daniel.
RESEARCH INFRASTRUCTURES IN FP7 General Information G.Guignard EuTuCHe workshop
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
6th Framework Programme – Research for Policy - November 2002 The Sixth Framework Programme and Policy Support Research – “Priority 8” “Priority 8” - 6th.
The European Transport Research Alliance - ETRA Prof. G. A. Giannopoulos Chairman, ETRA.
DG ResearchEuropean Commission RTD 06/FK/lb 09/2001 Special measures to further improve participation of Newly Associated States (NAS) in FP-5.
WP3 - Evaluation and proposal selection
Danube Transnational Programme: opportunities for cooperation in the energy sector EUSDR PA2 SG meeting , Budapest, Hungary.
The call FP7-REGPOT in brief
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
Strengthening the foundations of ERA
Working Group on cultural statistics - Luxembourg 30 June/1 July 2008
SOCIAL DIALOGUE WITHIN EUPAN
eContentplus 2007 Work Programme
Presentation transcript:

The next call FP Infrastructures-5

FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004 Call deadline: 3 March 2005 Remote evaluation: March - April 2005 Panel meetings: Brussels, 9-13 May 2005 Results: available in July Negotiations: Sept – Dec First contracts: January 2006

Indicative budget: 145 million € –Integrating Activities (CA, I3): 126 million € –Transnational Access (SSA): 17 million € –Accompanying Measures (SSA): 2 million € Expected proposals: 150 –Integrating Activities (CA, I3): 50 –Transnational Access (SSA): 70 –Accompanying Measures (SSA): 30 3 ranking lists FP Infrastructures-5 Call outline (2)

Expert evaluators: 90 (+ Chairman + Independent Observer) 5 thematic sub-panels for Integrating Activities and Transnational Access One multidisciplinary subpanel for Accompanying Measures Evaluation procedure

Evaluation criteria General criteria: –Relevance to the objectives of the programme –Scientific and Technological excellence –Quality of the management –European added value Results from previous calls taken into account More details in the revised Work Programme

TA - Transnational Access To support opportunities of access to individual major infrastructures (rare in Europe), for transnational user groups Financing covers up to 100% of the Access, Travel & Subsistence, and other related costs Contracts Typically 36 to 48 months EC contribution 100 to 750 k€ per year, not exceeding 20% of the operating costs of the infrastructure

To integrate the European infrastructures of a specific scientific community, promoting their coherent use and development 3 mandatory groups of activities: –Networking activity to catalyse co-ordination and co- operation (common databases, virtual facilities, setting common protocols, training users…) –Transnational Access to one or more infrastructures –Joint Research activities to improve (in quality and quantity) the service provided I3 - Integrated Infrastructures Initiative (1)

Financing covers: –Up to 100% of the Networking activities –Up to 100% of the Access, T&S and related costs –Up to 50% of the Joint Research activities costs Contracts Typically 48 to 60 months EC contribution of several millions € I3 - Integrated Infrastructures Initiative (2)

To integrate the European infrastructures from a given class, by promoting their coherent use and development Networking activities only Financing up to 100% Contracts Typically 48 to 60 months CA – Co-ordination Action

To sustain existing or future mechanisms for a coordinated approach to Research Infrastructures in Europe Financing up to 100% Contracts Typically 12 to 36 months EC contribution k€, for each measure AM – Accompanying Measure (1)

Database studies Foresight studies Exploratory workshops Round-table workshops AM – Accompanying Measure (2)

I3: –All three activities (Networking, Access, Joint Research) are mandatory AM: –Round-table workshops not supported General: –Final threshold increased –Some specific evaluation criteria modified (see revised Work Programme) –Results from previous calls taken into account Main differences between the new call 5 and previous calls