Construction of the Tracker End Caps CMS Tracker MPR 22/11/2004 D. Contardo Aachen I, Aachen III, Antwerpen, Brussels, Hamburg, Karlruhe, Louvain, Lyon,

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Walls crates cables gas chambers electronics CERN adb.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
BM&N STS ladders assembly in VLHEP
Micromegas Vertex Tracker Status Report
Service channels between Tracker and PP1
Service channels between Tracker and PP1
Update on the SVD construction
Katsuro Nakamura Sep. 10, 2015 VXD meeting
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Far Detector Activities Late 2017 – Early 2018
Rod adaptors for module tests Module positioning studies
Work flow Lyon Karlshrue 14/11/2018 Nick Lumb Preparation (no TEC)
HL-LHC upgrade at IPHC news
TEC assembly and commissioning at Lyon
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Polarized 3He target installation
Presentation transcript:

Construction of the Tracker End Caps CMS Tracker MPR 22/11/2004 D. Contardo Aachen I, Aachen III, Antwerpen, Brussels, Hamburg, Karlruhe, Louvain, Lyon, Strasbourg, UCSB, Vienna, Zurich ETH 1)TEC Organization 2)Petal integration 3)TEC+, TEC- integration 4)Summary 1 TEC - 9 disks petals of 8 differents types SI-modules of 12 different types

TEC Construction Centres Responsibilities (only) + Aachen III : module QC and debug + Antwerpen, Aachen III, Strasbourg, Louvain and UCSB : sampling LT module test + Karlsruhe : petal production QC, logistics + Lyon-Aachen I : beam tests system tests, petal debug TEC+ AachenTEC- Lyon

Meetings : - Weekly video conferences, TEC meetings during CERN weeks and workshops outside CERN List of links to all web sites relevant to TEC activities : Responsibles : - Identified responsibles per center and per task (collaboration of various instituts on identified tasks), contribution to Tracker working goups. Tools : - Specific tools to monitor parts data, production quality and flow : - DB Browser interfaces : - Nightly update of module test results : MSTEC/cmstec.php MSTEC/cmstec.php - DB link to excel files for comparison of achieved and expected flowsexcel files TEC centres work organization

TEC module production status from DB WEB interface of Louvain updated every night : /CMSTEC/cmstec.php /CMSTEC/cmstec.php TEC module production yield ~97%

- Validation of petal design in Beam Tests and System Tests (Aachen I -Lyon) - Petal Mechanics construction and test (Aachen I, Louvain) - InterConnectBoards (Aachen I) - Assembly and Deep Qualification : two pilot centres (Lyon, Karlsruhe) to develop set-ups Cloned at other PICs. TEC PETAL INTEGRATION

TEC PETAL INTEGRATION : 1) PETAL DESIGN VALIDATION Beam test : 1 read-out loop, 1Front+1Back Petal cooling at -20°

TEC PETAL INTEGRATION : 1) PETAL DESIGN VALIDATION Beam test : 1 read-out loop, 1Front+1Back Petal cooling at -20°

TEC PETAL INTEGRATION : 2) PETAL MECHANICS Link : Petal_production.docPetal_production.doc A/ Cooling Pipes + Manifolds: Cooling pipes bent in Louvain Manifolds produced by IPT Manifold + pipes in welding jig (Aachen) Laser weld manifolds (IPT) Leak test with N2 at 12 bar (Aachen) B/ Prepare petal bodies: Glue second skin on underside of Eurocomposite CF plates (ADCO) Precut plates into petals (1 plate = 5 petals) in Aachen Machine petal bodies into exact shape + machine grooves and holes (IPT)

C/Complete Petals: Equip petal with cooling pipe and cooling inserts (also the PEEK inserts for mounting the ICBs) in the gluing jig (Aachen) Glue in the AOH bridges (after removal from glueing jig) – (Aachen) Glue the second skin on the upper side, thus closing the petal (ADCO) Precision machining of inserts (Aachen) Glue the 3 feet to mount the petal onto the TEC disk (Aachen) Glue protection rims, manifold inserts and 2D label TEC PETAL INTEGRATION : 2) PETAL MECHANICS

All material available. Production rate: 2 petals/day (Limited by : gluing pipes+inserts in petal -- here the issue is manpower, and precision machining) Mass production will start in January and will be finished in Dec. '05 (Assume no production in August, plus some contingency). D/Petal testing (Aachen): Register petal in DB Check electrical insulation + thermal efficiency of inserts (enter results in DB) E/ Mount the ICBs (Aachen): icbtest.pdficbtest.pdf All ICBs prepared and tested (28/02/2005) (ICBs for 30 front and 30 back petals available 30/11/2004) Mount ICBs on petals Readout test on sample basis (10%) TEC PETAL INTEGRATION : 2) PETAL MECHANICS

12 types of modules, 13 types of optohybrides, 10’s of mechanical pieces Assembly guided by dedicated program : - All steps of assembly described in order - Component types and status checked from DB - Component functionalities (400) performed automatically after mounting - Petal composition files generated for DB and LT set-up TEC PETAL INTEGRATION : 3) ASSEMBLY B. Trocme

Explicative picture Comments on: - pieces to be used (centre liner,distance plates...) - screw length - torque mom. to apply - aob... TEC PETAL INTEGRATION : 3) ASSEMBLY

typical explicative pictures TEC PETAL INTEGRATION : 3) ASSEMBLY

TEC PETAL INTEGRATION : 4) LONG TERM QUALIFICATION - commissioning of petal - 3 days of warm cold cycles for stability test - generate result.xml file G. Dirkes :

TEC PETAL INTEGRATION : 4) LONG TERM QUALIFICATION

Software : Optoscan runs (~12 min) Time tune runs (~5 min) Ped runs (~7 min per APV mode) Cal profile runs (1.5 h per APV mode) IV runs (2 h / to be optimised! Expect 8-12min finally) Latency runs (2 h peak inv on) Scenarios working Slow control and interlocks ready (Louvain) TEC PETAL INTEGRATION : 4) LONG TERM QUALIFICATION

Constrains for petal integration rates ● Integration takes two days with two operators and can be done in parallel with LT testing ● Commissoning in LT setup takes 1 day, assembly bench needed in case of problems to replace faulty parts ● LT test takes 3 days Rate of 1 petal / week is a conservative estimate TEC PETAL INTEGRATION : 5) PRODUCTION RATE

Assembly set-up : all hardware available, all centers able to run the assembly program (as a result of recent workshop in Karlsruhe) Long Term set-up : Still some read-out modules missing (expected before end of 04). Software available to be adapted for none expert operators Manpower available at all centres : PICsmanpower.pptPICsmanpower.ppt 1 responsible, 2 operators full time, support for hardware and software. Qualification of centres : level of commissioning will be controled before assembly of final petals. In the qualification phase, starting in December 04, assembly and LT exercises will be performed with non qualified modules of early production. 4 centres ready for assembly : Aachen, Karlsruhe, Lyon and Strasbourg 3 centres have experienced petal assembly and cooling : Aachen, Karlsruhe, Lyon TEC PETAL INTEGRATION : 5) CENTRES STATUS

1 petal/week/PIC - First sector of 18 petals (existing modules + first Hybrid batch) mid-Apr Start of petal integration May 05 - Ramp-up due to hybrid batch deliveries up to end of July - Petal production TEC+ Nov Petal production TEC- May 06 TEC PETAL INTEGRATION : 5) PRODUCTION SCHEDULE Large number of centres implies weekly control of all the production from modules to petals to properly dispatch parts from centre to centre (present surface transfers of parts managed through efficient DHL-IN2P3 contract).

TEC INTEGRATION : OVERVIEW TEC Structures : - TEC mechanics and alignment (Aachen I) - TEC Services (Karlsruhe, Lyon) TEC Integration : - Before structures ready : Mock-up for preparation of commissioning (DAQ and Slow Sontrol) equipped with first sector (18 petals) (Lyon) - TEC+ structure ready : test of petal insertion, grounding and schielding, and insertion in Tracker tube (Aachen I). Petal integration - TEC- structure ready : cold and system test 1 sector (Lyon). Petal integration starts when TEC+ petals delivered - Back disk + 4 petals test in magnet, (Karlsruhe)

Link : TEC_assembly.doc (Aachen I)TEC_assembly.doc TEC assembly needs a granite table with a hole in the center (measured planarity of Aachen table 7μ). Building the stack : - Each disk equipped with assembly and petal fixation inserts spacer feet mounted on granite table, Disk1 placed on these feet. - - Rods threaded into the feet and distance holders guaranteeing the z-distance between Disks1 and 2 placed on these rods. - Disk2 mounted, procedure repeated till the stack is complete. - Alignment Disk (disk 10) similar to normal disk with spacer profiles glued to ensure rigidity with disk 9 is placed on the TEC stack and the profiles are glued onto Disk9. TEC INTEGRATION : PREPARATION OF STRUCTURE (1)

Adapter plates, onto which SCs will be glued, attached to the U-brackets on the disks. Service Channels prepared : seal with glue all milled edges and glue in the SC inserts (later to hold the TEC outer covers). Mount and glue the SCs onto the adapter plates. Same principle is to attach the 4 inner tube segments to the disks. Structure disassembled : SCs and inner tube segment taken off by unscrewing the adapter plates from the U-brackets on the disks, etc. Service channel filled with optical ribbons in Karlsruhe, during this time the alignment system components will be mounted on disk#6. Structure reassembled : Disk1 on the spacer feet on the granite table; the SCs are mounted on Disk1 and the remaining disks are then screwed onto the SCs via the adapter plates. Bulkhead (holding the cable patch panels) attached to the back end. Cooling pipes and multiservice and control cables mounted on the TEC structure. TEC INTEGRATION : PREPARATION OF STRUCTURE (2)

Link : TEC_Services_Installation.doc TEC_Services_Installation.doc Fibre ribbons : qualification at CERN, continuity test at assembly (Karlsruhe) Pipes : air test at 20b (Lancashire), flow with coolant and pressure N2 at 20b tests (Lyon) Cables : Insulation and continuity test (ADAPT), repeated in Lyon TEC INTEGRATION : PREPARATION OF STRUCTURE (3)

Structure moved from granite table to integration cradle up to Tracker tube insertion TEC INTEGRATION : PREPARATION OF STRUCTURE (4) Alignment system : TEC_alignment.docTEC_alignment.doc

TEC INTEGRATION : STRUCTURE SCHEDULE Link : TEC_assembly.mpp, TEC_assembly htmlTEC_assembly.mppTEC_assembly html Summary : - Pre-assembly of TEC+ (granite table) mid-Dec Pre-assembly of TEC- (granite table) mid-Dec. 04 to mid- Feb. 05 in parallel preparation of TEC+ service channels, pipes + MSC cables, - Assembly TEC+ end of Apr Move TEC+ to cradle photogrammetry and petal insertion test mid-Jun. 05 in parallel TEC- assembly mid-Jul TEC+ integration test in tracker tube mid-June to mid-July 05 - TEC+ ready for petal insertion in Aachen mid-Jul TEC- ready for cold and system test with sector in Lyon mid-July 05 Contingency of 1 month included in schedule

TEC INTEGRATION : PETAL INSERTION AND COMMISSIONING (1) Link : TEC_integration_V3.1.pdfTEC_integration_V3.1.pdf - Reception of the TEC structure in integration cradle : - Check cradle functionality (rotation) - Check mechanics and services - Phototgrammetry measurement in Lyon (room temperature and -20°) - Special petal transport organized by Lyon and Aachen to collect petals - Perform petal reception test (independent of integration) :

TEC INTEGRATION : PETAL INSERTION AND COMMISSIONING (2) - Mechanical insertion of Back petal towers (9 petals on 9 disks) Disks used as a plate for petal insertion, tool design in progress in Aachen - Connection to services, interface to DB - Rotate the TEC in cradle, repeat operations for Front petals

TEC INTEGRATION : PETAL INSERTION AND COMMISSIONING (2) Test sequence : - At the beginning test petal functionality after each insertion - Perform test of read-out loops of a sector (pairs of front and Back petals) commissioning tasks plus pedestals, calibration, cooling measurements - Perform laser and cosmic test for alignment Integration time : 1 week per Tower + 1 week of read-out tests : 1 day per petal Contingency in assembly and test procedure TEC+ petal integration completed : March 06 TEC- petal integration completed : June 06 TEC transport to CERN : contact with Hasenkamp expert firm in transport of precious and fragile objects in controled atmosphere

TEC INTEGRATION : AACHEN CENTRE Team : 4 physicists, 2 engineers, 3 technicians Equipments : Clean room facility existing, available end of 04 Cooling plant 10kW, Dry air Petal storage facility Read-out for petal reception available Read-out for TEC integration mid-05

TEC INTEGRATION : LYON CENTER Team : 3 physicists, 3 engineers, 2 technicians Equipments : - Cold-Dry-Clean room facility 64m2 - 2 kWt cooling plant (1 sector) - Dry air system 25m3/hour - Petal storage rack designed (groups of 5 petals with cold walls for multi-petal test) - Read-out for petal reception available - Read-out for TEC integration : 1 VME 9U, 1 FED 9U, Caen PS system with 3PSUs (1 petal) additional hardware spring-05

TEC MPR SUMMARY (1) TEC petal production - Petal mechanics production not on critical path - First petals will be produced in operational centres for full assembly and LT procedure validation end of the year (9 front (tower) and 1 back petals) - All centres will be qualified by March 05 - Nominal throughput for present schedule is 1 petal per week with an expected contingency to reach Possible increase of assembly throughput with more manpower, alternatives in the procedure to speed-up the petal LT will be investigated Present schedule driven by hybrid and module flow (and repartition of geometries in hybrid batches) All geometries needed at assembly time

TEC MPR SUMMARY (2) TEC Integration - Established working plan and schedule for TEC+ and TEC- mechanics delivery - Established sharing of responsibilities between two integration centres : TEC+ integration in priority while commissioning and system qualification proceed with TEC- - Established (but flexible) procedure for petal integration and test - Magnet test foreseen with 4 petals on back disks

TEC MPR SUMMARY (3) TEC present schedule TEC+ petals integrated March 06 TEC- petals integrated June 06

CMS TEC Community Mailing-list