DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.

Slides:



Advertisements
Similar presentations
GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
Advertisements

GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Data Acquisition Graham Heyes May 20th Outline Online organization - who is responsible for what. Resources - staffing, support group budget and.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Feb. 19, 2015 David Lawrence JLab Counting House Operations.
May. 11, 2015 David Lawrence JLab Counting House Operations.
Online Data Challenges David Lawrence, JLab Feb. 20, /20/14Online Data Challenges.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
GlueX Collaboration Meeting February , GeV Trigger Electronics R. Chris Cuevas Hardware Status ( A top down view,, )  Global Trigger Processing.
Online Update Elliott Wolin JLab 4-Oct Outline Online Data Challenges Networking DAQ JInventory System Farm Manager Counting House, Computers, Databases.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
DAQ Status Graham. EMU / EB status EMU framework prototype is complete. Prototype read, process and send modules are complete. XML configuration mechanism.
1 Alice DAQ Configuration DB
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
David Abbott CODA3 - DAQ and Electronics Development for the 12 GeV Upgrade.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
ATCA based LLRF system design review DESY Control servers for ATCA based LLRF system Piotr Pucyk - DESY, Warsaw University of Technology Jaroslaw.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
Software Status Sonja Vrcic Socorro,
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Event Management. EMU Graham Heyes April Overview Background Requirements Solution Status.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
CLAS12 DAQ & Trigger Status
Online Control Program: a summary of recent discussions
Online Software Status
Example of DAQ Trigger issues for the SoLID experiment
Presentation transcript:

DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott

Overview FCAT Current Status Update –CODA3, Hall D tasks etc… DAQ Test Stand –Counting House setup –Timeline, Testing plans Summary

FCAT Full Crate Acceptance Test Requires: CODA 2.6.2, ROOT, Recent Module drivers Currently reuses FP-SD, CTP, Controller Hardware setup Set fADC250 VME Addresses, JTAG dips, Channel Ranges Install modules in crate Cable up Power, Ethernet, and Trigger Connections Power on and Set Crate Fan Speed

FCAT Software Tests: CRATESCAN Identify all modules in crate (VME addr, serial numbers) Update firmware, if needed PEDESTAL No inputs, random pulser trigger PAYLOAD1 (~4 kHz trig2, blocklevel = 1) Simple programmed payload into ALL channels PAYLOAD2 (~4 kHz trig2, blocklevel = 2) Simple programmed payload into One channel/module RATETEST (~150 kHz trig2, blocklevel = 100) Same as PAYLOAD2

Current Status Still 2 supported releases (through startup of 12GeV) –CODA (standard operational release) NO: Event Blocking, EVIO Version 4 files End of Life – no further development – only support –CODA 3.0 (currently Beta) NO: EVIO Version 1 files, vxWorks ROCs Under rapid development – changes are frequent New useful Tools developed for CODA 3 configuration and monitoring: –Jcedit - COOL Run Configuration editor –Jeviodmp – EVIO v4 file viewer CODA 3 developments are at a point where availability of all the new hardware in a large data acquisition test stand is highly desired to work out many details/features/bugs!

VME CPU status… VME CPU procurement was only partially completed this fall. –New 3 rd gen Intel Core i7 boards did not initially pass our low level VME tests (it has since been resolved). –A small order of 2 nd Gen boards were ordered to cover near term needs (Hall D ordered 7). GE Intelligent Platforms won the bid (~1K/CPU cheaper) over Concurrent Technologies. A final PO for the remainder of boards can happen when desired (anytime this fiscal year) A final technical note: Concurrent boards support direct VXS (PCIe) high-speed access to switch slot boards (ie CTP,GTP). This may be useful in some crates (L1 trigger).

COOL Configuration Editor ( jcedit ) Component Classes Defined components Configuration Layout (double-click icon to get component details)

Run Control GUI User interface to DAQ including: Control buttons Config parameters Run Status Component status Event/Data Rates System messages

Jevio Event Dump Utility (jeviodmp)

Hall D Online tasks for DAQ Group Projects “completed”: Design framework and prototype Hall D Farm monitoring architecture (AFECS-based Process and Hardware monitoring/control Agents available) Create DAQ-like EVIO files from Monte Carlo data (mc2coda library) Projects in various stages of development: Self-configuring readout list with database storage of crate configurations Event disentangler tailored for Hall D crates Top Level Experiment control system supervisor and GUI Trigger Config/Control System and GUI ALL of the projects still under development will benefit greatly from a non-trivial DAQ Test Stand (i.e. more than a few crates, all new hardware available for use)

GlueX DAQ System ~20% slice of total system

DAQ Test Stand Prior efforts –Many parts of DAQ system tested individually in small test stands –DAQ group unable to perform large-scale tests Never had enough equipment/space Why test “slice” of full DAQ now? –Software/Hardware developments have matured. –Hall D has all the necessary equipment –Computing system available soon Some hardware can be borrowed from CC and HPCC –Rack Room LHS is not in use – plenty of empty racks & power –Benefit to both DAQ/Electronics groups and they have manpower –DOE review this summer may focus on DAQ readiness

DAQ Test Stand – Timelines & Goals Rack Room ready now (all necessary power 110 & 208) Computing equipment (CPUs, switches, cabling etc…) is currently being installed. Plan to have a total of 12 crates (10 ROCs, TS, and Global Trigger crate). As crates are filled and tested by Fernando’s group they will be installed in the rack room. Should have all by early April. Testing will include: –Performance testing with complex configs (multi-stage event building, asymmetric data streams). –Trigger/clock distribution, long-term stability, error detection, calibration and recovery. –Develop DAQ system partitioning with the TS –Much more…

Rack Room Setup Control Room (Misc PCs and Consoles) R1 R2 R10 R5 R4 R3 R11 R6 R7 R8 R9 R12R13R14R15R16R17R18 EMU Nodes Main Ethernet & IB Switches RAID Disks 2 VXS 1 TS crate 3 VXS 2 VXS 1 Global Trig Terminal Server, NIM, Ethernet 10 Gb Uplink Misc DAQ CPUs L3 Farm Nodes ROCS

Summary The various pieces of CODA 3 are progressing. We are at a point where integration of these components is possible - and essential. We have all the necessary hardware to pull together a large DAQ test stand in the Hall D Counting house. We hope to keep this system in place through the fall. As Detector systems are installed in the Hall we will be able to integrate them into the DAQ system. Both Hall-based DAQ and the Rack room system will be able to run at the same time.