ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Advertisements

ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
ECE 477 Design Review Team 15  Spring 2013 Jackson McCormick, Andrew Batek, Carey Woolet, Justin Lindley.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
Design Review: RoboSiM Robotic Surveillance in Motion
ECE 477 Design Review Team 13  Spring 2008 Paste a photo of team members here, annotated with names of team members. Srichand Varun Madhu Anvesh.
ECE 477 Design Review Team 7  Spring 2011 Paste a photo of team members here, annotated with names of team members. Stuart Pulliam Will Granger Linda.
ECE 477 Design Review Group 1  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 10  Spring 2012 Paste a photo of team members here, annotated with names of team members. Nathan Irvin Will Bouchonnet Allen.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Final Presentation Team 03  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Design Review Team 6  Spring 2011 Left to right: Kirk Iler, Brian Bentz, Stephen Wolf, Fuhe Xu.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
ECE 477 Design Review Team 1  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 19  Spring 2013 Paste a photo of team members here, annotated with names of team members. Calvin Mwesigwa John Marston Noah.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 4  Spring 2008 Zach Dicklin Amy Ritter Ian Bacon Eric Yee.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 5  Fall 2007 Wes Chris Josh Dave.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 14  Spring 2011 Paste a photo of team members here, annotated with names of team members. Jinliang Wei, Kelton Stefan, Ankith.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Final Presentation Group 11  Spring 2005.
ECE 477 Design Review Team 01  Fall 2010 Jigar Gandhi Chandler Wall John-Taylor Smith Eric Zarowny.
ECE 477 Design Review Team 2  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 20  Spring 2013 Jordan Wagner Justin Spencer Mark Sears John Jachna.
Team: Justin Audley, Blake Brown, Christopher Dean, Andrew Russell, Andrew Saunders Advisor: Dr. Richard A. Messner Sponsors: Dr. Richard A. Messner, UNH.
ECE 477 Design Review Group 2  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 1  Fall 2006 Sumanth Peddamatham Alex Tucker Chris Arges Radhika Mulani.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Design Review Team 3  Fall 2007 Steven Kingsley (Analog) Roy Scheck (Leader) Tony Liechty (Digital) Charles Lan (Software)
ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile.
ECE 477 Design Review Team 10  Spring 2007 JUSTIN AZAD AFIFF NUHAIRIADAM.
ECE 477 Design Review Team 8(SLOW)  Spring 2006.
Team /02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Team 1  Spring 2008 Alan BernsteinIan AlsmanIlya VeygmanDarshan Shah.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Design Review Team 5  Fall 2009 Ben Carter – Jacqui Dickerson – Ian Oliver – Dennis Lee.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 Design Review Team 2  Fall 2006 Wirelessly Integrated Menu System (WIMS) Ryan Coppa Lee Bush Aaron Replogle Neil Bedwell.
ECE 477 Design Review Group 5  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
ECE 477 Design Review Team BOAR  Fall 2011 Paste a photo of team members here, annotated with names of team members. Left to Right:
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Design Review Team 6 - Spring 2012
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Final Presentation Team 1  Spring 2008
ECE 477 Design Review Team ??  Fall 2012
Presentation transcript:

ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer

Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation Preliminary PCB layoutPreliminary PCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

Project Overview MAVerick (Motorized Assault Vehicle) is a mobile gun platform controlled by a cellular phone that has the ability to establish full-duplex communication with a command center in order to transmit control and status signals. It will contain a paintball gun attached to the platform which will fire at moving targets and have the ability to detect obstacles.

Project-Specific Success Criteria ability to detect moving targets using an ultrasonic/IR sensor ability to identify and detect obstacles ability to encode and send control signals through a cellular phone to control the tank/gun ability to receive and decode control signals from the cellular ability to send status information from the tank to the controlling device

Block Diagram

Component Selection Rationale Microcontroller

Component Selection Rationale DTMF Encoder DTMF Decoder

Component Selection Rationale Ultrasonic Sensor

Packaging Design The MAVerick will be packaged in the above pictured tank. The turret will be removed and replaced by a paintball gun. The circuit board and all wires will be housed inside of the tank. All sensors will be mounted on the outside of the tank as seen in the next figure.

Length of Tank = 27” Width of Tank= 12” Length of Paintball Gun = 19” The numbers on the drawing correspond to the components in the parts list. Figure 1: Overhead view of tank concept drawing.

Width of base = 6” Length of base = 6” Height of base = 2”

1. Atmel Mega16 Microprocessor 2negligible Remote Control Tank Brass Eagle Marauder Paintball Gun Top Gun Joystick Motokata Wireless Reversing & Parking Sensor Ademco Infrared Motion Sensor DTMF Encoder ICS5089 4negligible DTMF Decoder 4negligible Senscomp Ultrasonic Sensor Senscomp Ultrasonic Housing negligible Link Actuator Linksys Wireless-B Internet Video Camera Minebea Stepper Motor Major Parts(more than $1) Number Total Weight(lbs.) Total Cost(US $)

Schematic/ Theory of Operation Motor ControlMotor Control

Schematic/ Theory of Operation Stepper Motor ControlStepper Motor Control

DTMF CircuitsDTMF Circuits Schematic/ Theory of Operation

Ultrasonic SensorUltrasonic Sensor Schematic/ Theory of Operation

JoystickJoystick Schematic/ Theory of Operation

MicrocontrollerMicrocontroller

Schematic/ Theory of Operation HeadersHeaders

Preliminary PCB Layout Command CenterCommand Center

Preliminary PCB Layout TankTank

Software Design/ Development Status TankTank

Software Design/ Development Status Command CenterCommand Center

Project Completion Timeline PCB Layout – Done by March 7 thPCB Layout – Done by March 7 th Board Population – Done by March 24 thBoard Population – Done by March 24 th Physical Construction – Done by March 31 stPhysical Construction – Done by March 31 st Software Development – Done by April 19 thSoftware Development – Done by April 19 th Senior Design Report – Done by May 2 ndSenior Design Report – Done by May 2 nd

Questions / Discussion