City of Rochester 2 nd Street Upgrade 9/15/2015 Dean Kashiwagi, PhD, PE Jake Smithwick Arizona State University.

Slides:



Advertisements
Similar presentations
Performance Based Studies Research Group
Advertisements

Best Value PIPS PIPS: Perfromance Information Procurement System
Performance Based Studies Research Group
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Developed By: Performance Based Studies Research Group Performance Information Procurement System.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Weekly Risk Report & Performance Metrics
Responding to Sources Sought and Request for Information Charles Williams September 8, 2011.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Procurement.
Chapter 3 Project Initiation
5/17/2015 Pre-Proposal Meeting Best Value Model. This presentation is being provided for educational purposes only Please refer to the RFP for specific.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
CITY OF HALLANDALE BEACH PROCUREMENT PROCESS City Commission Workshop February 23, 2015.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Performance Based Studies Research Group Pre Award Phase.
Performance Based Studies Research Group #SW092: Waste Management Contract.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
EXAMPLE – Quality Control Plan For Consultants
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Best Value Business Model Supplemental Pre-Proposal Information Video RFP : Part A Design-Build St. Joseph’s College Residence.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Best Value Public Works Procurement September 7, 2007.
Contract Training Class I
10/30/2015 New Risk/Project Management Paradigm New Paradigm: use a structure to increase value Performance Information Procurement System (PIPS) Performance.
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
The following training presentation is for all 1Prospect subcontract employees and is taken upon joining a contract or task order to which 1Prospect is.
Performance Based Studies Research Group Pre Award Phase.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Strategic sourcing is a Price Based approach to supply chain management that formalizes the way information is gathered and used so that an organization.
Job Order Contracting 2016 & Beyond! Best Management Practices Moderator: Peter Cholakis, CJE Board Member Presenters: Charlie Bowers, LEED AP - National.
PIPS!!! Performance Information Procurement System.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
The following training presentation is for all Advancia Corporation subcontract employees and is taken upon joining a contract or task order to which Advancia.
1 WELCOME This is for RFP 7227 ONLY Restrooms Cell Phones Turn on vibrate Take calls outside Sign in sheets – please sign in Conference will focus on.
January am.  Acknowledgment of Receipt Form, Page 3  Request for Proposals – Submittal Form, Page 4  Cost Proposal Requested from the top.
Performance-Based Contracting PIPS Performance Information Procurement System Jacob Charries Central Purchasing
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Procurement & Strategic Sourcing
A six-pack of major RFP problems
Procurement & Strategic Sourcing Commercial Print Services
Procurement & Strategic Sourcing
The following training presentation is for all subcontract employees and is taken upon joining a contract or task order to which we are the Prime vendor.
Procurement Management
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
How to Run a Successful RFP
Procurement & Strategic Sourcing Charter Bus Transportation Services
TRAVEL SERVICES Request for Proposal
ISA 201 Intermediate Information Systems Acquisition
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing (Law School Media Wall)
Best Value Performance Information Procurement System (PIPS)
Procurement & Strategic Sourcing
Developing and Issuing the RFP
Request for Proposal and Specifications for
Security Equipment RAF/2012/00030 Compulsory Briefing Session
OCPS CCNA SELECTION COMMITTEE TRAINING
Procurement & Strategic Sourcing
Diversity management system (DMS)
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

City of Rochester 2 nd Street Upgrade 9/15/2015 Dean Kashiwagi, PhD, PE Jake Smithwick Arizona State University

2 This presentation is for educational purposes only. Please refer to the final RFQ for specific instructions

RFQ Requirements 3

Summary of DB Process 4

RFQ Schedule 5 Planned DateAction August 18, 2011Issue RFQ September 22RFQ Educational Meeting September 29, 2:00pmRFQ Questions due October 11SOQs Due October 17Notify short-listed Submitters October 18Issue RFP November 3RFP Educational Meeting January 18Interviews February 2012Pre-Award Period March 2012Notice to Proceed

Selection Criteria 6 WeightCriteriaRated?Attachment RFQ Phase 20 PointsPast Performance InformationNo Exhibit 1 50 PointsProject Capability PlanYesD 50 PointsRisk PlanYesC Pass / FailResource AvailabilityNo Pass / FailLegal & FinancialNoAppendix B RFP Phase ~100 PointsProposed Design SchematicYes? ~75 PointsInterviewYes? ~5 PointsScheduleYes?

Three Phases 7 PHASE 1PHASE 2 PHASE 3 CLARIFICATION RFQ RFP

Best Value System (alignment of expertise, minimization of effort) 8 CLARIFICATION Vendor is an Expert Vendor is NOT an Expert Vendor is an Expert

Performance Information Procurement System 9 CLARIFICATION Vendor is an Expert Vendor is NOT an Expert Vendor is an Expert Dominant Simple Differential Clarification Both parties may walk Risk Management Quality Control Quality Assurance

Initial conditions Final conditions Event Time Laws (Control, impact, and influence)

Us Risks Risks Technical Scope Don’t Control Technical Scope Don’t Control Me vs. Them Paradigm Shift: contractors should have minimal technical risk and minimize risk that they do not control

Industry Structure High I. Price Based II. Value Based IV. Unstable Market III. Negotiated-Bid Specifications, standards and qualification based Management, direction, and control Decision making Technical expertise on client’s side Best Value (Performance and price measurements) Quality control and quality assurance Perceived Competition Performance Low High Owner selects vendor Negotiates with vendor Vendor performs

Selection Process 1313 Filter 1 Past Performance Information Filter 2 Filter 4 Prioritize (Identify Best Value) Filter 5 Pre-Award Period QUALITY OF VENDORS Filter 3 Interview Proposed Design Value Added Price AWARD High Low Blind Rating Project Capability Risk (no control) PA Docs WRR RMP Technical Documents Criteria PPI Interview Technical Risk Value Added (?) Financials Proposed Design Dominance Check Ratings are dominant Best value is within high and low cost ranges BV vendor has dominant information Vendor is an Expert Vendor is not an expert RFQ RFP

RFQ Criteria Past Performance Information (PPI) Blind review – Project Capability Plan – Risk (vendor does not control) Resource Availability (Pass / Fail) Legal and Financial (Pass / Fail)

Project Capability Overview Differentiate their capability to meet the technical requirements of this project Identify "vision” or “plan” for the alignment of expertise over the duration of the project Evaluation Support statements of performance with experience in design and construction of urban street and underground utility projects (metrics, numeric scores, deviation rates, etc.) Use either verifiable performance metrics or best value practices with performance measurements or references of best value practices

Risk Plan List and prioritize major risk items on this project that the submitter does not control Explain how proposer will mitigate, manage, and/or minimize the risk from occurring – mitigation plan was used previously, and the impact on performance in terms of customer satisfaction and the number of times it was used Tracking all deviations on the project Method of minimizing contract transactions Performance measurements, past performance measurements, measurements that define performance – Submitter has implemented the mitigation plan before – Submitter has been successful in mitigating time and cost deviation of their past projects. – previous clients have been very satisfied with Submitter's results. – projects were similar to the current project being advertised.

Blind submittals are simple The what, but not the how Supported by verifiable performance information or best value practice with performance information (if no verifiable performance information, receive an average rating) Rating dominant performance, average, and dominantly poor No names 2 page limits

Blind submittal examples Simple – Example 1: The project manager being proposed on this project is very experienced in design-build, mechanical system type and innovative projects. The what, but not the how – Example 2: the mechanical subcontractor can install a system that minimizes the installation time by 20% and the system minimizes the annual energy consumption by 15% Supported by performance information – Example 1: PM record over the past 5 years, 10 DB projects, $250M average scope, customer satisfaction is 9.5/10.0, deviation rate is less than 1% – Example 2: Last five projects, customer satisfaction is 9.5/10, deviation rate is less than 1%, 20% earlier finish, installed system have average energy consumption 15% under average consumption, references available on request. 18

19

20

21 2 pages max!

1 1 page max!

A note on formatting… Project Capability and Risk Plan must NOT contain names Page limits Two (2) – Attachment C (Risk): Two (2) pages max Two (2) – Attachment D (Project Capability): Two (2) pages max One (1) – Attachment E (Resource Availability): One (1) pages max Not allowed to re-create, re-format, or modify the template (cannot alter font size, font type, font color; add colors, pictures, diagrams, etc) 24

PPI Submittal Vendor VENDOR Prepare and Send Survey Questionnaires to Past Clients Step 2 Step 3 Collect/Receive Completed SurveysPrepare Reference List Step 1 Enter data into Reference List Step 4 Package all material (Reference List and Surveys) and Submit Step 5 Phase 1

27 PPI Details PPI will be collected on all vendors and their critical team components. Critical Team “Components”: – Contractor / Design-Builder (firm) – Engineering Company (firm) – Project Manager (individual) – Project Engineer (individual) – Project Superintendent (individual) – Project Lead Design Engineer (individual) Phase 1

Step 1: Prepare Reference List 28 Profile sheet SURVEY CODE FIRST NAME LAST NAMEPHONEFAX CLIENT NAME PROJECT NAME DATE COMPLETED COST OF PROJECT PROJECT TYPE Past Project Info sheet Phase 1

Step 2: Prepare & Send Surveys Past Project Info Profile Send List Project Manager & Site Superintendent on each survey! 29 Client Phase 1

30 Step 2 cont’d: Survey Form Phase 1

31 Step 2 cont’d: Add Your Fax #! Phase 1

32 Step 2 cont’d: Surveys MUST Be Signed Phase 1

Step 3: Collect & Receive Surveys 33 Fax, , Mail Client Contractor Phase 1

Step 4: Enter Data into Reference List 34 Phase 1

Step 5: Scan Surveys & Burn CD 35 Reference ListsReturned Surveys scanned to PDF CD-ROM Excel (XLS) file Phase 1

I already have PPI… 36 ? Phase 1

Summary of PPI Requirements Require number of surveys submitted: – Firms: Five (5) – Individuals: Three (3) Projects must be 100% complete (final payment received) Project list must contain different projects The survey must be signed Turn in electronic copies of surveys (PDF) and Reference Lists (XLS) Projects do not need to be similar 37 Phase 1

How The Submittal Process Works 38 Submittal Evaluation Members Proposal Form (1 page) Other Documentation Proposal Form (1 page) Risk Plan, Project Capability Plan Average Score Contracting Officer Contracting Officer Phase 1

2012 Best Value Annual Conference Feb 13-17, 2012 in Tempe, AZ Train the trainer advanced curriculum Certification of trainers Meet most visionary clients and vendors Lessons Learned from all projects including services, IT, and construction Organization measurement and optimization How to implement change How to reduce size without increasing risk Job opportunities in Asia in best value environments Early Registration before Dec 15, 2011: For more details visit us at

Comments / Questions 40