1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
CTC-470 Construction Administration Project Management Concepts.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Operations Erik D. Johnson, Deputy ALD for Programs NSLS-II Project Advisory Committee February 8-9, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
M. Scharfenstein - ES&H Coordinator 8 June 2009
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Agency Construction Management :CM NOT AT-RISK
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David Dale Procurement Manager CFAC Status Meeting May 8, 2008.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
OTE Building PMG Report March 2, 2012 Rhonda Merchut 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Enterprise Content Management Owners Representative Contract Approval
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Meeting of the LCLS Facilities Advisory Committee
Controlling Project Cost and Schedule
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Integrated Safety and Environmental Management
CONVENTIONAL FACILITIES
Preliminary Project Execution Plan
Department Of Energy Review Linac Coherent Light Source Project
Phase 1 Statement of Work Preconstruction “Plan The Work”
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities Advisory Committee Review November 9 & 10, 2009

2 BROOKHAVEN SCIENCE ASSOCIATES CM Status Outline Construction Safety Status Of CM Activities Project Staffing Commissioning External CM Services Issues and Challenges Path Forward Conclusions

3 BROOKHAVEN SCIENCE ASSOCIATES Construction Safety Maintain “Best in Class” Safety Program Objective Early Incidents a Concern Torcon Needs to Reinforce Safety Effort CF-CM Working Closely with ESH Regular Meetings to Continue Improvements Daily Morning Safety Meetings w/ Torcon Will implement corrective actions as needed pending accident investigation report findings Our success measured by our Safety Performance

4 BROOKHAVEN SCIENCE ASSOCIATES Construction Management CM Team Inspecting and Managing Construction Activities Managing Geo-Tech Engineers and Testing Agencies Ongoing Involvement with ESH Managing Environmental Compliance Partnering with Torcon Managing prompt return on Submittals and RFIs Verifying Compliance

5 BROOKHAVEN SCIENCE ASSOCIATES Status Of CM Activities CF CM Up and Running CM Team Permanent Staff Hired CM Plan Completed and Approved – periodic updates CM Procedures Manual Completed – periodic updates Site Office Designed, Built, Occupied and Operational CM Support and Staff Augmentation Contract in place Ring Building Contract Awarded in February Torcon’s ESH Plan Approved, NTP on March 25, 2009 Site Logistics and Mobilization Complete Phasing/Schedule Developed

6 BROOKHAVEN SCIENCE ASSOCIATES Status Of CM Activities (continued) CF CM Inspection Team Fully Engaged Inspecting, Testing & Reporting Planning Site Office Expansion to Support Additional Staff Construction Fully up to Speed Site Demolition Complete Mass Cut and Fill Earthwork Complete Concrete at 20% ( 8k/40k CY) Electrical Substation and CHW Piping Awarded July and August respectively Utilizing staff augmentation to support oversight

7 BROOKHAVEN SCIENCE ASSOCIATES Procedures Manual

8 BROOKHAVEN SCIENCE ASSOCIATES Submittal Log

9 BROOKHAVEN SCIENCE ASSOCIATES Open RFI Log

10 BROOKHAVEN SCIENCE ASSOCIATES Project Staffing Current Staffing Permanent Staffing Hires Complete (6 positions filled) Staff Augmentation Started (2 positions filled to date) Potential Future Positions Clerk of the Works – In Process Safety Engineer – Outgrowth of 9/30/09 Injury Construction Inspectors – As required – Additional1.5 FTE approved as a result of accelerating the LOB package and safety concerns

11 BROOKHAVEN SCIENCE ASSOCIATES CF Staffing Plan

12 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Organization

13 BROOKHAVEN SCIENCE ASSOCIATES Commissioning BVH Integrated Services Contract Awarded October 2008 Commissioning Agent for CFN Scope of Services – Ring Building and LOBs Design Phase –Develop Commissioning Plan –Review Design Construction Phase –Submittal Review –Witness Start Up –Functional Testing

14 BROOKHAVEN SCIENCE ASSOCIATES Commissioning (continued) Scope of Services Continued Construction Phase –Develop Training Manual and Train Staff –Review O&M Manuals and Warranties Warranty Period –Facilitate Warranty Compliance –Near Warranty End Review Commissioning Status Reviewed Ring Building T-II Design Prepared Ring Building Commissioning Plan Review of Ring Building Submittals

15 BROOKHAVEN SCIENCE ASSOCIATES Commissioning (continued) Commissioning Status Continued Review Ring Building RFIs Attended Meetings With Torcon –Introduction to Torcon and their Subcontractors –Reviewed Commissioning Flow Chart –Reviewed Commissioning Plan –Reviewed Schedule (Identified Inspection and Start-up Dates) –Identified Roles and Responsibilities (Support BVH Cx) –Discussed BVH Commissioning Portal –Building Turn-over Reviewed LOB T-II Design

16 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Flow Chart

17 BROOKHAVEN SCIENCE ASSOCIATES Commissioning Plan

18 BROOKHAVEN SCIENCE ASSOCIATES Outside CM Services Need for Outside CM Services Identified Construction Management Evaluation and Consultation Staff Augmentation Independent Estimating for LOB Title II Design Liro/Gilbane Provided CM Services during Design Estimating Value Engineering Design/Constructability Reviews Market Evaluation Construction Phase CM Services Awarded to Liro/Gilbane

19 BROOKHAVEN SCIENCE ASSOCIATES CM Review Report

20 BROOKHAVEN SCIENCE ASSOCIATES CM Review Report (continued)

21 BROOKHAVEN SCIENCE ASSOCIATES CM Review Report (continued)

22 BROOKHAVEN SCIENCE ASSOCIATES CM Audit Recommendations CM Team to Read and Sign Contract (Complete) T&M Tickets to Include Disclaimer (Stamp Made) “Signature verifies time and material only but does not change contractual obligations of either party“ Develop Close-out Procedures (In Process) Gilbane Provided Samples of Procedure and Check List Anticipate Potential Claims Create Files and Document Try to Resolve Upfront Create Activity Check Lists (procedures manual)

23 BROOKHAVEN SCIENCE ASSOCIATES Issues and Challenges Safety ‘Best in Class’ Program Going Forward Meeting Phase 1 Milestone (Pentant 1 Occupancy) Weather Impacts ‘Wet Days’ to Date Winter Construction Change Management – Submitting and Processing Proposals Different LOB Contractor – Ongoing Logistics Meetings with Torcon

24 BROOKHAVEN SCIENCE ASSOCIATES Path Forward Refocus ‘Best in Class’ Project Safety Program Work with Torcon to Facilitate Project Continue Inspection and Testing Effort Continuous Improvement of CF Procedures Manual Ramp Up Commissioning Prepare for Upcoming Activities – Checklist Structural Steel, Roofing (SSR), Wall Panel Manage and Coordinate Packages Substation Upgrade Contract Chilled Water Piping Contract Continue Training When Applicable

25 BROOKHAVEN SCIENCE ASSOCIATES Conclusion Reinforce Safety Effort Lessons Learned from Early Incidents Modify collaborative approach pending report recommendations Project on Track Within Budget On Schedule Torcon a Proven GC Continued Partnering BNL, Contractors and Designers Identify Shared Goals