PPC Industry Forum, 1 st March 2007. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Slides:



Advertisements
Similar presentations
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
Advertisements

11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Simultaneous PSTN and Broadband Provision Process Incorporating Broadband Movers Issue 5.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Ofcom Consumer Switching
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
This update is a BT perspective of Working Group status including input from the Co-Chair call of 7 th September Nigel Scott 13 th Sept 05 Consult21 -
Thank you.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
1 New actions from Oct 2012 ActionOwnerActionStatusDetail AP1 10/12 Simon Brisbourne Investigate requirement to have bills in PDF format New AP2 10/12.
Change to presentation of financial results Phil Moses – Group Controller & Director of Investor Relations 23 January 2008.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
PPC Industry Forum, 06 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
1 Workshop sessions: day two ● CD infrastructure ● CD advisors ● Quality and contract management ● Referral pathways and standardised service ● Discussion.
BEREC – Examining EoI Jon Furmston, Director Equality of Access Office.
Geoff Hammond Head of Revenue Assurance. Agenda Interconnect – CRAB the start Current Wholesale Revenue Assurance Focus PPC current position PPC Radial.
PPC Industry Forum, 4 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Imposing access obligations under the new framework Karen Hardy.
BT Wholesale HARD TURN BACK When shouldn’t I call or request an escalation? There are several occasions when BT Wholesale receive requests on the phone/via.
PPC Industry Forum 2 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Main outcomes of 21 th ERG Plenary Roberto Viola, ERG Chair Brussels, 15 June 2007.
BT Wholesale Customer Roadmap 1 st July 2008 Welcome Chris Booth Business Improvement Programme Graham Crane Consult21.
Implementing Oftel’s Broadband Strategy John Russell 12 July 2002.
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Forum, 7 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
PPC Industry Forum 16 September Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Consult 21 - TWG The Pathfinder Programme Keith Fowler 14 January 2005.
BT Wholesale Products June, SOR Management Tool Angus Flett John Skingle.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Consult21 webcall – BT Wholesale Service availability data (Datasets) Peter Davis, BT Design Bill du Cann, BT Consult21.
CONSULT 21 Broadband and LLU Working Group BROADBAND AND LLU PRODUCTS - MIGRATION TO 21CN Ynyr Roberts BTW 16 th June 2005.
Business unit (if required) business unit (if required) SDH Serving Nodes Determination at the Point of Handover.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Consult21 Consult21 Working Group – Broadband and LLU 3rd Meeting 19 April :00 – 14:00 WELCOME.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Information in this presentation is subject to change NEXT GENERATION BROADBAND UPDATE Thursday 3 April 2008 Delivered over BT’s 21 st Century Network.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
PPC Industry Forum, 03 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
KCOM HEY Wholesale FibreLine Services
Strawman Best Practice IIA Change Forum June 2017
West Essex Business Planning Process
Key Value Indicators (KVIs) Version 1.1 (amendments from V1.0 in red)
Customer Issue Management CoMC Update for June 2019
Presentation transcript:

PPC Industry Forum, 1 st March 2007

Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information contained in the following slides was accurate at time of publication. Any price indications or timescales contained within this presentation are estimates for information purposes only and do not constitute any contractual or other obligation. In relation to any products/services referred to in this presentation which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available BT reserves the right to make changes to the information in this presentation at any time without further notice Exclusive reliance on the information in this slide pack is at your own risk Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Agenda Review of previous actions – Pauline Cowie/All Presentations – EAB Update – Bob Day Pricing Tool Update – James Dewing Product Development Update – Pauline Cowie/All Product In Life Update – Pauline Cowie/All QoS Billing Communications Third Party Equipment Re-Use Regulatory Update – Kath Embleton COLT’s SOR – Gordon Robinson AOB - All Date of next meeting - All Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Action Point Review

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 12/1 (01/12/05) – “BT to investigate the inclusion of eCo Repair in the data quality monitoring on the One Truth Data Base” Due to continued EOI work, which is given priority over other developments, no date for the alignment of eCo to the PPC OTDB is available.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 3/5 (02/03/06) – “BT to review the breakdown of charges of the different shift charges on the CPL, and look into the possibility of retrospection if appropriate” Closure date for Retrospection claims 31 Jan 07 Those Retrospection claims received from industry are being validated. Payment is expected 1 st Qtr 07/08 financial year.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 6/8 (08/06/06) – “CPs believe CDDs are being pushed out and asked for this to be clarified in the Handbook. BT were also asked to look into the possibility of a process which allows quicker delivery when possible” Handbook under review and clarity will be given to when CDDs can be extended. CPs to provide BT with examples where CDDs are being pushed out without their agreement. BT to investigate on receipt of examples.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 6/9 (08/06/06) – “Product Handbook – When will the changes be made” Interim revision made based on Industry’s feedback. Product Line revising Handbook based on feedback received. Revision due for distribution to Industry mid- March for agreement.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 9/1 (08/09/06) – “How many times is ‘Stop the Clock’ initiated because of a 3 rd Party customer issues e.g. refusing access? Data to be fed back via the Service Reviews” ReasonPercentage CP Customer/ Site contact not available or no contact0.22% CP Site Not Ready (Building or Cabinet etc)1.74% CP Site Access not available1.60% 3rd Party Customer/ Site contact not available or no contact20.20% 3rd Party Site Not Ready (Building or Cabinet etc)9.47% 3rd Party Site Access not available18.66% All reasons including access (CP and 3rd Party)100.00%

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 12/1 (07/12/06) – “Wolverhampton CMC have asked CPs to provide circuit IDs of A Ends to begin provision process, but SNEiD is already provided to the CMC and should suffice. BT to check why this is requested” This request is due to a change in the ISH provision process to overcome issues whereby BT occasionally bill ccts from the CP’s POH rather than the BT Exchange. To ensure the right information is gathered up front and both parties agree the address of the SNEID, which should follow through to correct bills being generated.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 12/2 (07/12/06) – “Do BTW provide wholesale variants of Defence Private Services, and if not, can these be developed as a service for CPs to take?” BT Wholesale do not provide Defence Private Service variant. To evaluate whether a BT Wholesale product is possible BT requests CPs submit their requirement as an SoR.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 12/3 (07/12/06) – “CPs requested that BT initiate a process to communicate closure of exchanges to CPs as and when this happens, as this only happens from an LLU perspective” Current: CPs notice of Exchange Closure minimum of 6 months Notification posted on LLU & TSR websites. Future: CPs to provide PPC Product Team with details of persons in organisation to whom the closure notification to be distributed. BT to ensure Closure Notification Team receives CPs list of notification recipients.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 12/4 (07/12/06) – “BT to provide CPs with a process of what happens when exchanges close with regards to moving circuits, downtime, possible cost increase etc. Ideally BT to provide this ahead of the next PPC forum” Once notified the Planned Engineering Works process as detailed in CPs Customer Service Plans is initiated. CPs to liaise with Service Managers regarding circuit downtime. There may be no increase in cost to existing service as a result of the closure, currently being clarified. New circuits will attract the charge from the re-allocated exchange.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Action: 12/5 (07/12/05) - BT to define exactly what the 0207/CLZ geographic zone is, as there are potential NGN implications? BT to also define what the difference is between Metro/CLZ charging structures. A snap-shot of the PPC Exchange Data is provided to clarify CLZ listings – See next Slide

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Response to Action Point 12/6 (07/12/06) – “BT to check legal implications of previous application of Ancillary Charges which were charged but not noted in the CPL” BT agree to change the cancellation charges to reflect the following: Cancellation on same day as FOCA will only incur actual charges incurred. Cancellation from day after FOCA onwards will incur published cancellation charges.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits BT Wholesale PPC Equivalence Measures Bob Day March 2007

Managed Bandwidth Services BTW Products and Strategy BT Reporting Structure BT BT Retail Main BT PLC Board BT Global Services Openreach Openreach Board Operatin g Committee BT Wholesale Board BT Retail Board BT GS Board EAB BT CEO Management reporting Compliance oversight Wholesale

Managed Bandwidth Services BTW Products and Strategy Wholesale Product KPIs reported to the EAB BT IPstream Fulfilment % orders completed by CCD Assurance % Broadband faults cleared by BT Wholesale within 40 hrs of receipt Migrations External CPs to BT; BT to external CPs; IPstream to Datastream and Datastream to IPstream. (wef Apr 07) BT Datastream Fulfilment % orders completed by CCD Assurance % Broadband faults cleared by BT Wholesale within 40 hrs of receipt PPC Fulfilment The percentage of Service orders successfully completed on or before the committed delivery date Assurance The number and percentage of product faults that are cleared within 5 hours

Managed Bandwidth Services BTW Products and Strategy Analysis Analysis is carried out in line with agreed EAB reporting principles i.e. initiated after 2 months’ and reported after 3 months’ when performance is outside of the control limits (pooled z-test) Commentary supporting current results and any resulting analysis is included in the monthly report compiled for the EAB. A quarterly commentary now being added to the added to the published charts on the Industry Web site. The same approach will apply to all new measures.

Managed Bandwidth Services BTW Products and Strategy Industry requirements captured and analysed. Availability of measures and feasibility of reporting on them being investigated. Measures are being developed where possible. Data will be collected and produced in publication format (absolute measures and pooled z-test where appropriate). Additional PPC Measures

Managed Bandwidth Services BTW Products and Strategy Progress on Measures. Industry SuggestionsMeasures under Consideration / Development % Success AssuranceThe percentage of Private Circuit / Partial Private Circuit fault reports cleared in objective time. This measure can be split between bandwidth groups. % Success Fulfilment (CDD, std lead-times) The mean time it takes to Provide a Private Circuit / Partial Private Circuit measured from Order Validation Date (OVD) to Service Completion Date (SCD). This measure can be split between bandwidth groups. Fault RatesAverage number of Private Circuit / Partial Private Circuits faults per circuit per year. Average time to restoreThe average time taken to clear a Private Circuit / Partial Private Circuit fault Service AvailabilityThe average OST (out of service time) per circuit per annum.

Managed Bandwidth Services BTW Products and Strategy Format of new measures Absolute Measures: Performance will be measure monthly for BT and external CPs, and will include a twelve month rolling average. Statistical comparison test: performance for BT and External CPs will be measured monthly against a standard 5% two tailed pooled z-test. The pooled z-test will only be applied to volumes greater than 200. If the denominator for either BT or external CPs is less than 200 per month, only absolute measures will be provided.

Managed Bandwidth Services BTW Products and Strategy Example of New measures for PPCs

Managed Bandwidth Services BTW Products and Strategy Example of New measures for PPCs

Managed Bandwidth Services BTW Products and Strategy Next Steps Validation of Measures Signoff within BT Group Formal Response to Industry (March/April 07) Information made available to the EAO/EAB Measures published on Industry Web site

Managed Bandwidth Services BTW Products and Strategy Questions…

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits BT Wholesale PPC Pricing Tool James Dewing

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Issues Log Update

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Product Development Update

Managed Bandwidth Services BTW Products and Strategy Data Connectivity Development Timeline TDM on 21CN (Strategy statement) Ethernet Portfolio Harmonisation DecJanFebMarAprMay Jun JulAugSepOctNov Dec Q4 IPClear UDS Special Offer E-Line revised pricing E-Line Migration MPLS Interconnect trial 622Mbit/s PPC (re) launch High band PPC pricing review (155Mbit/s) Bundled Cct Pricing (PPC) Data Connectivity Pricing tool – Phase 1 (PPC) PPC Enhanced (phase 2) – Vol & term discounts Harmonised Ethernet – Release 1 Managed BNS PPC Metro Pricing (Phase 2) Metro E-ring MPLS Interconnect Campaign (type A) Managed PPC (Enhanced Phase 3) Harmonised Ethernet – Release 2 Harmonised Ethernet – Release 3 Traditional iVPN – Harmonised MPLS (Int) Data Connectivity Pricing tool – Phase 2 iVPN – Harmonised MPLS (Phase 2) PPC Metro Pricing (Phase 1) On-net pricing (PPC) RPC to PPC Novation Process Wires only PPC MPLS NB - All dates quoted are target launch dates only See next slide

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Product In-Life Update QoS Billing Communications Third Party Sited Equipment Re- use Customer Satisfaction

Managed Bandwidth Services BTW Products and Strategy QoS QoS Performance - Reporting Update Q3 Aggregated Report published on website Q3 CP reports distributed Retail Comparison available on CDD, CRD and Repair PPC/Retail Comparison Q3 CDD Retail 95.03% PPC 93.67% Repair Retail 83.00% PPC 86.07%

Managed Bandwidth Services BTW Products and Strategy QoS QoS Performance – Q3 Highlights Circuit CDD performance improved to 93.67% from 92.05% last quarter FOCR targets decreased for the 5th quarter in a row. FOCR success is 78.81% against 77.89% in the last quarter The repair performance improved from 83.88% (7679 faults) to 86.07% 9197 faults) despite increased fault volume

Managed Bandwidth Services BTW Products and Strategy QoS QoS Performance – Q3 Lowlights The Highband FOCR remain stable. CP’s customers STC increased to 92% from 88% in the last quarter against slight increase in the number of Stop the Clocks. The number of new installation faults down to Communication Providers increased from 65.71% in the last quarter to 71.19%.

Managed Bandwidth Services BTW Products and Strategy Billing Migration to Geneva – Proposed Delivery & Migration Development to go live mid May 07 Parallel feeds between PCNBS & Geneva from mid-May to end-Sept. Parallel bills to show correlation between bills produced by PCNBS and those produced by Geneva. Migration commences July 07 30/09/07 PCNBS switch off 01/10/07 – Geneva commencing PPC bill production Throughout October reconciliation of PCNBS & Geneva Bills. Trial Period Trial will be between mid-May and 30/9/07.

Managed Bandwidth Services BTW Products and Strategy Communications January: 002/07 – PPC Data File update – 16/01/07 ACCN764 – Withdrawal of New Circuit on Spare Capacity Charges – 18/01/07 March External Briefing – Withdrawal of New Circuit on Spare Capacity Charges – Mid-March Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Third Party Sited Equipment Re-use WEEE and RoHS directives Recovery of Third Party Equipment on cessation of last PPC.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits SOR Gordon Robinson

Managed Bandwidth Services BTW Products and Strategy A.O.B Next Meeting Scheduled 7 th June 2007 BTC, Business Showcase Partial Private Circuits