West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Paul M. Kohler Noise Abatement Program Manager INTERSTATE 95 EXPRESS LANES FUNDAMENTALS OF TRAFFIC NOISE.
City of Bloomfield Hills 2015 Road Improvement Program.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Capital Improvement Program City of Warren, Ohio April 2012.
Benefits of Precast Concrete Sound Walls over Alternative Products Case Study June 4, 2010.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
I-65 Added Travel Lanes Project in Tippecanoe County
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
Dr Alireza Gharagozlou Mojgan Hejrani Diarjan
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
What’s HOT in DOT Noise Policy Revisions? Mia Waters Washington State Department of Transportation TRB ADC40, Transportation Related Noise & Vibration.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Traffic Generation Assessment February 21, What did the County do BEFORE TGA and what is it?
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
1 Cold Spring Canyon Bridge Proposed Suicide Barrier Project Information Meeting & Open House Sara von Schwind Caltrans Project Manager.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
KARA – Development & Traffic Update KARA AGM – March 29, 2012.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
Indian Hill Boulevard Grade Separation Proposal, January 25, 2016.
POLK RAIL QUIET ZONE ANALYSIS Conditions Assessment CSX “S” Line March 24, 2016.
August 6, 2013 LAKE FORREST DRIVE UPDATE. sandyspringsga.gov Lake Forrest Drive Update  Actions To-Date Work Orders – 13 since 2009 for clean-up, 8 of.
Santiago Hills II East Orange General Plan Noise Assessment Matthew B. Jones, P.E. Mestre Greve Associates.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Pioneer Road Relocation and Reconstruction Project
City of Charlottesville
Village of east aurora sycamore street water improvements
Four Winds Condominium Association August 2, 2017
Sheldon (Maple to Library) Preferred Design Meeting
US 92 Pedestrian Connectivity & Safety Assessment Study
Jefferson County Planning Commission Hearing April 10, 2013
The Oakton Condominium Association September 12, 2017
Low Level Road Project – Traffic Management Meeting August 2012
US 92 Pedestrian Connectivity & Safety Assessment Study
Noise Pollution Noise Mitigation
I-94 Maple Grove to Rogers Community Noise Engagement Meeting #1
Lower Makefield Township Community Meeting
SE 12th Street Roadway Improvements February 8, 2005.
Engineered Scoring System for Bicycle Lane Mapping Development Pedro Zavagna, Mena Souliman  The University of Texas at Tyler, Departments of Civil Engineering.
Meadow Lake Boulevard Street Extension Project
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
November Bond Election
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of Anchorage Project Management and Engineering Dept. and CRW Engineering Group, LLC

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 2 Introduction Rebecca Campbell, CRW Engineering Steve Gillette, PM&E

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 3 Study Area West Northern Lights Boulevard – Forest Park Drive to Arlington Drive Overview

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 4 Study Results One 24 hour monitor was set at 2050 Churchill Drive (Ldn) Numerous Spot Measurements were taken along the study area. (LEQ) The Equivalent Level (LEQ)- represents the average noise level for an entire hour The Day-Night Level (Ldn) – 24 hour weighted noise average Noise Study

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 5 Study Results 24 Hour average (Ldn) at 2050 Churchill Drive was 78 decibels (dBA) The standard noise criteria for residential developments are: – Ldn 60 dBAnormally acceptable – Ldn 65 dBAconditionally acceptable – Ldn 70 dBAnormally unacceptable – Ldn 75 dBAunacceptable Noise Study

6 Noise Study Results Peak Hour LEQ

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 7 Sound Barrier Goals Reduce sound levels by 10 decibels Provide a cost effective solution that will benefit the maximum number of residences Maintain the aesthetic properties of Northern Lights Boulevard Maintain the aesthetic qualities of the residences Noise Barrier Options

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 8 Noise Levels Location and Height Barrier Material Utility Impacts ROW Impacts Construction Access Cost Design Factors Noise Barrier Options

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 9 Location and Height Noise Barrier Options Location – Located where the barrier will provide maximum noise reduction – In cut sections, the barrier is most effective at the top of the cut slope – Safety must be considered Height – High enough to block the line of sight of traffic

10 Preferred Location for Maximum Noise Reduction

11 Section A-A

12 Section B-B

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 13 Barrier Material Noise Barrier Options Earthen Berm Wooden Wall Masonry Wall Synthetic Wall

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 14 Noise Barrier Material Wooden Barrier Wooden Barrier - New Seward Highway North of DeArmoun Wooden Barrier - Glenn Highway East of Bragaw Street

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 15 Synthetic Wall Noise Barrier Material C Street North of DimondMuldoon Road at James Drive

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 16 Noise Barrier Costs MaterialCost per foot 1 Total Cost 2 Wooden$380$465,000 Masonry$550$660,000 Synthetic$900$1,080,000 1 Estimated Total Length of Wall Required = 1,200 feet 2 Available budget is $150,000

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 17 Project Schedule Noise Data Collection (April 2006) Design Study (July-August 2006) Public Meeting (August 2006) Design (August – November 2006) Additional Funds Required (April 2007) Bidding (May 2007) Construction (July 2007) Summary

August 16, 2006 West Northern Lights Blvd. Sound Barrier Improvements 18 Contact Information Key Personnel – Rebecca Campbell, PE – CRW Project Engineer Phone Steve Gillette, PE – MOA Project Manager Phone THANK YOU!