LEA 27 August 2008D.LACARRERE1 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Underground - UXA Zone (protected area) Under DELPHI Barrel UXAUXB.

Slides:



Advertisements
Similar presentations
2014. PROPOSED SCHOOL SIGN Sign Height 6ft 6” Cabinet Size 3ft x 6’
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
S2 INVENTOR GAME BOY part one MAIN BODY. S2 INVENTOR Here is what the finished result might look like once put together...
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Wall N Pond C17 (surface) Outlet 2”Cast Pipe **surface measurements only – see additional graphics for bottom and depth of pond. Height of door is 5’10”.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
 This style was created by architect Piet Blom in the 1970s.  The cubic form is often outlined with stacks of larger blocks at the corners.  Doors.
A rectangular dog pen is constructed using a barn wall as one side and 60m of fencing for the other three sides. Find the dimensions of the pen that.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
Length in the Metric System
PLANOMETRIC VIEW OF A KITCHEN.
Architectural Design Modeling the Design Technological Design TDJ2O1 – Grade 10.
Chapter 35 Section Layout.
Geometry Honors Section 7.1 Surface Area and Volume of Boxes.
Wall and Ceiling Construction
ICARUS Cold Vessels Thermal insulation Project progress report.
AM test sample. outside 20 mm inside 19 mm wallthickness 1 mm height features 4 mm.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
Chapter 23 Elevation Layout and Drawing Techniques.
Wood Construction CTC-375.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
Fall Protection 1.  Falls are the most common cause of death on construction sites  According to OSHA, fall protection must be provided for workers.
Visitor’s path declassification for LS2 and LS3? (Summary of first discussion K. Barth with RP – H. Vincke)
Chapter 6 Wall Material. Introduction Small-size Hollow Block Fly Ash and Silicate Medium- size Block §6.3 Wall Blocks.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Area of a Rectangle A=LW Length times Width Length width = 20 cm =12 cm A=20 12 A=240 cm 2.
Find the volume of this cylinder 4 cm 3 cm Find the VOLUME of this prism 6 m 10 m.
Inventory of radioactive sources present in the cavern at pit 8 Gloria Corti Experimental Area Meeting 05 August 2008.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
The temple-pyramids were one of the Mayans most impressive achievements. The massive stone structures were built in the heart of Mayan cities. Mathematical.
1 SURFACE FINISHES, DOORS AND WINDOWS. SURFACE FINISHES OR PLASTERING Process of covering rough walls and uneven surfaces in the construction of houses.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
LEA 01 October 2008D.LACARRERE1 Level 1 Level 2 SX8 - Emergency Exit – Schematic Side View (from inside building) NO SCALE OPTION 1 Point 8 – Barrack inside.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
Building Boxes What is the largest volume open top box that you can build from an 8 ½ by 11 inch sheet of paper?
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
University of Houston Passage measurements and ½ inch width 79 and ½ inch height Elevator cabin measures 56 ½ x 79 ½ inches.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
The reading is 7.38 mm. The reading is 7.72 mm.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
Foundation – jay Desai.
Isometric & Orthographic Drawings
SX1 manipulation VERSION 1 Version
VELO-installation meeting CERN, January 17, 2006
AWAKE e-spectro update
MASS LAW.
Universal Vibration Rig Fixture for Govmark
MODULE 4 BUILDING MATERIALS.
Building Structural Systems
CEN 180: Civil Engineering Drawing II
Elevation Layout and Drawing Techniques
Trial and Improvement 100 cm2 Example
GAMING Mousepad XL.
Anomalous Data Spot the anomaly.
FBE05 – Mathematics and Statistics
Chapter 9 Nuclear Radiation
©2009 – Not to be sold/Free to use
Wall and Ceiling Construction
Graphic Communication
S1 Orthographic Sketching
Neutron guide Shielding Concept
The following model requirements are based on a basic slab door finish kitchen similar to the one shown in the image.
LIFT,ESCALATOR AND MOVING WALKS
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
TRANSPORTATION CASK AND CONCRETE MODULE DESIGN FOR MANAGING NUCLEAR SPENT FUEL PRODUCED IN BUSHEHR NUCLEAR POWER PLANT A.M. TAHERIAN Iran Radioactive Waste.
Presentation transcript:

LEA 27 August 2008D.LACARRERE1 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Underground - UXA Zone (protected area) Under DELPHI Barrel UXAUXB

LEA 27 August 2008D.LACARRERE2 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Underground - UXA Zone (under DELPHI Barrel) Supports barrel Concrete blocks 400 mm thick Door 1300 mm width 2200 mm height Surface Roughly 16 m2 Cover-sheets Fence Current Status (27 Aug. 08) 1 - Walls with concrete blocks : Achieved. 2 - Painting walls : Achieved. 3 - Door & fence : On going (wk 35). 4 - Cover-sheets : on going (wk 35). 5 - Painting Ground (wk 35-36). 6 - Card Reader (wk 36-37)

LEA 27 August 2008D.LACARRERE3 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Surface - SX8 Building zone Corner SX8 building

LEA 27 August 2008D.LACARRERE4 Surface Roughly 12 m2 Door 1300 mm width 2150 mm height PX Shaft Fence (top) Concrete blocks 400 mm thick Cover-sheets BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Surface - SX8 Building zone Current Status (27 Aug. 08) 1 - Walls with concrete blocks : Achieved. 2 - Painting walls : Achieved. 3 - Door & fence : Scheduled (wk 36). 4 - Cover-sheets : Scheduled (wk 36). 5 - Painting Ground (wk 36-37). 6 - Card Reader (wk 37-38)