Human reliability analysis – challenges in modelling operational risk

Slides:



Advertisements
Similar presentations
1 INCOSE HRA Advanced Risk Management Conference 2007 Courtney Lane INCOSE HRA Risk Management Conference November 9, 2007 Its More Than Just Numbers:
Advertisements

ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Results Based Monitoring (RBM)
The Course experience questionnaire (P. Ramsden) Designed as a performance indicator 24 statements relating to 5 aspects 1 overall satisfaction statement.
1 Drafting a Standard n Establish the requirements n Agree the process n Draft the Standard n Test the Standard n Implement the Standard.
EMS Checklist (ISO model)
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
Introduction to the unit and mixed methods approaches to research Kerry Hood.
Intelligence Step 5 - Capacity Analysis Capacity Analysis Without capacity, the most innovative and brilliant interventions will not be implemented, wont.
PROJECT RISK MANAGEMENT
Progress Monitoring project DATA Assessment Module.
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
NCSR “DEMOKRITOS” Institute of Nuclear Technology and Radiation Protection NATIONAL TECHNICAL UNIVERSITY OF ATHENS School of Chemical Engineering Fuzzy.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Modeling Human Reasoning About Meta-Information Presented By: Scott Langevin Jingsong Wang.
1 ALLOCATING POLICE RESOURCES FOR RESULTS. 2 As fiscal pressures on local governments increase, cuts to core services are being made without an adequate.
Psychological Aspects of Risk Management and Technology – G. Grote ETHZ, Fall09 Psychological Aspects of Risk Management and Technology – Overview.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
DEFINING JOB PERFORMANCE AND ITS RELATIONSHIP TO ASSESSMENTS.
Quality Risk Management ICH Q9 Annex I: Methods & Tools
Part II Project Planning © 2012 John Wiley & Sons Inc.
Standards and Guidelines for Quality Assurance in the European
WMO UNEP INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP IPCC Good Practice Guidance Simon Eggleston Technical.
Health and Safety Executive IChemE – Process Safety KPIs Workshop session Ian Travers Head of Chemical Industries Strategy Unit Hazardous Installations.
Control environment and control activities. Day II Session III and IV.
Risk Assessment – An Essential Standard
ISTEP: Technology Field Research in Developing Communities Instructor: M. Bernardine Dias CAs: Sarah Belousov and Ermine Teves Spring 2009.
RESEARCH A systematic quest for undiscovered truth A way of thinking
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Lecture 1 What is Modeling? What is Modeling? Creating a simplified version of reality Working with this version to understand or control some.
Presented to President’s Cabinet. INTERNAL CONTROLS are the integration of the activities, plans, attitudes, policies and efforts of the people of an.
George Firican ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS.
Risk Management - ACostE Kate Boothroyd FIRM Director, KB Risk Consulting Limited.
TR 07- FI- 02 INTERNAL CONTROL – basic course RISK MANAGEMENT January 2009 EU Twinning Project TR 07-FI-02.
Risk Assessment. Risk As defined by Kaplan and Garrick, risk analysis consists of answering three specific questions: what can happen? what is the chance.
Semester 2: Lecture 9 Analyzing Qualitative Data: Evaluation Research Prepared by: Dr. Lloyd Waller ©
Irene Khan – Secretary General Building effective and responsive INGOs, the strategic role of HR: The IS Job Value Review 8 February 2008.
A COMPETENCY APPROACH TO HUMAN RESOURCE MANAGEMENT
1. Development Planning and Administration MPA – 403 Lecture 17 FACILITATOR Prof. Dr. Mohammad Majid Mahmood Bagram.
Event Management & ITIL V3
Using Human Component Mapping TO ANALYSE & INTEGRATE HUMAN FACTORS ISSUES & RECORDS WITH RAILWAY HAZARD LOGS 1 Dr. Amanda C. Elliott, Simon Macmull & Harry.
Overall Quality Assurance, Selecting and managing external consultants and outsourcing Baku Training Module.
Business Process Change and Discrete-Event Simulation: Bridging the Gap Vlatka Hlupic Brunel University Centre for Re-engineering Business Processes (REBUS)
Why Risk Models Should be Parameterised William Marsh, Risk Assessment and Decision Analysis Research Group.
Training and Developing a Competitive Workforce 17/04/2013.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
SOFTWARE PROJECT MANAGEMENT
Tier III Implementation. Define the Problem  In general - Identify initial concern General description of problem Prioritize and select target behavior.
Benefit: Cost Ratio David Pannell School of Agricultural and Resource Economics University of Western Australia.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
MEM 604: Social, Legal and Ethical Considerations for Engineering Managing Safety and Liability.
Human Reliability HUMAN RELIABILITY HUMAN ERROR
IAEA International Atomic Energy Agency The Human and Organizational Part of Nuclear Safety Monica Haage – International Specialist on.
National PE Cycle of Analysis. Fitness Assessment + Gathering Data Why do we need to asses our fitness levels?? * Strengths + Weeknesses -> Develop Performance.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
COSCAP-SA1 AERODROME CERTIFICATION COURSE AERODROME CERTIFICATION COURSE Safety Management System An introduction to the principles and concepts associated.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Organisational Issues Helen Jones Human Factors Consultant DNV.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Introduction Social ecological approach to behavior change
Human Error Reduction – A Systems Approach.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
IAEA E-learning Program
ALLOCATING POLICE RESOURCES FOR RESULTS
HUMAN RESOURCE GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE
Air Carrier Continuing Analysis and Surveillance System (CASS)
Air Carrier Continuing Analysis and Surveillance System (CASS)
Presentation transcript:

Human reliability analysis – challenges in modelling operational risk Tim Bedford Strathclyde Business School University of Strathclyde

Objectives Discuss modelling issues surrounding human reliability issues in operational risk Consider how time dynamics can be incorporated, and the potential benefits and difficulties Work done on safety relevant to other operational risks

Example – Lambrigg Derailment February 2007, Virgin train derails between Preston and Carlisle 1 Fatality, 22 Hospitalised Primary cause identified as faulty set of points

Inquiry Findings Deficiencies in the inspection and maintenance regime resulted in the points falling into disrepair. These deficiencies included: A breakdown in the local management structure responsible for inspection and maintenance The track patrolling regime’s systematic failure to inspect the area adequately Quality standards not being communicated or executed in the proper manner A lack of sample checking of the track to test inspection quality and arrangements

Inquiry Findings The patrol scheduled for 18 February 2007 was not done The QA regime did not identify failures in the reliability of inspection regimes, nor failures in application of best practice. Emergence of “Them & Us” culture Management structure based on activity, not location

Inquiry Findings High proportion of Staff on Temporary promotion Culture of “Learned Helplessness” Insufficient records on staff training and competencies Staff unsure of their contracted responsibilities Lapsed engineering qualifications

Is risk static? Clearly not Physical systems change through time, either through degradation or upgrading Human systems change through time, as a result of operating procedures, staff ability, organisational changes etc

Should we be concerned about dynamically changing risks? Maybe yes, maybe no…! No – over time it averages out to the same as the “static” risk, so that cumulative risk is same. Yes – If different risks change dynamically in a coupled way, then this can magnify the overall effect Yes – If no intervention then the risk at the end may be lower than acceptable (eg often regulate annual risk) Yes – If understanding the dynamics helps you create new strategies to reduce risks

Dynamic versus static statistical PRA models usually assume rates/probabilities not time dependent r Worst case Statistical estimate with conf bounds Achievable t

Interacting dynamics of productivity and safety pressures D. L. Cooke and T. R. Rohleder, Learning from incidents: from normal accidents to high reliability, Sys Dyn Review

Feedback from incidents Examples: Accident Precursors; CIRAS D. L. Cooke and T. R. Rohleder, Learning from incidents: from normal accidents to high reliability, Sys Dyn Review

Human reliability models In widespread use as part of Probabilistic Risk Analysis Aim to “give a number” as well as understanding of source of risk. Largely based on task analysis, breaking down human behaviour into steps (cognitive, decision, action etc). Performance shaping factors influence probability of success, and may be common to more than one step First generation methods Eg THERP, HCR, HEART, JHEDI Second generation methods Eg ATHENA, CREAM Third generation Monte Carlo based – linking cognition based models to technical system dynamics

{ THERP HRA Tree Total HEP [(7.5E-3)*3] +3E-3 = 2.55E-2 EF from Table Monitor primary system pressure & temp.; Table (20-10)1 Start SP pump 2 { THERP HRA Tree 1 3 4 5 6 7 8 9 10 Start LH pump 1 Start LH pump 2 Start LH pump 3 FT open PS valve 2 valve 3 1. Start confinement spray pumps 2. Start Low pressure pumps 3. Open Pressurizer safety valves (Depressurization) 7.5E-3 FT open press. safety valve 1 Stress Mod high, skilled, dynamic (heavy task load) THERP Table (20-16)5a = 5 Dependency Action could start as early as 6 minutes, so dependency based on 10 minutes Operator 2 = complete = 1 Shift Super. = high = 0.5 Assumed all pumps are required 4. Monitor primary system temperature & pressure Start SP pump 1; Selecting wrong control from functional group Table (20-12)3 =1E-3 [1E-3 * 5 (stress) * .5 (dependency)] * 3 branches = 7.5E-3 3E-3 Total HEP [(7.5E-3)*3] +3E-3 = 2.55E-2 EF from Table (20-20)7 = 5 SP pump 3 2

THERP Data Summary Table

What drives the main risks? The standard HRA models, while useful do not appear to capture the main sources of risk Accidents continue, and many (most?) are not due to random human failures Models do give insight and guidance about risk reduction including prioritization Qualitative approaches such as normal accident theory and HRO do not give guidance about prioritization, but may give insights about strategies for risk reduction

Organisational failure: Reason’s Swiss Cheese model

Modelling for understanding, or for optimization? Models typically one of Formative: inform system, organisation and process design, guiding management practice Summative: used to support decisions on, e.g., adoption, licensing or maintenance, by modelling cost/benefit trades Qualitative HR modelling tends to be formative. Quantitative HR modelling should be summative, but if not modelling the most significant system behavior then maybe actually most value in formative sense (risk analysis rather than management)

Summative Modelling Model building philosophy Models appropriate to purpose Cost-effective Taking account of uncertainties Models for DM should be able to include effects of intervention. Hard and soft interventions possible Hard example – employ extra staff member to increase capacity Soft example – give employees performance feedback

Some dynamic approaches to HR Holmberg et al (2000) Suggested use of marked point process David L. Cooke Thomas R. Rohleder (2008) Used systems dynamics Zahra Mohaghegh, Reza Kazemi, Ali Mosleh (2009) Used hybrid approaches combining SD, PRA and BBNs Lots of other dynamic risk modelling approaches, eg petri nets, living psa

Mohaghegh, Kazemi, Mosleh

Common framework A marked point process requires specification of Possible marks (event types) Relevant history for each mark The likelihood for a mark occuring, given the history Broadly, all three approaches fit into this framework, with either SD or BBNs driving the likelihood.

Main difficulties Complexity – existing models seem very complex… is this necessary for summative purposes? Measurement scales – for soft interventions these are often vaguely defined and not sufficient to build a robust model Elicitation – require ways of robustly assessing rates etc for these models Dependencies – interventions may impact on many different aspects of the system Model uncertainties – folding these into analysis of options

Possible approaches Complexity – restrict attention to cost/benefit of “discrete” feedback (major accidents) and “continuous” feedback (eg CIRAS). However, for summative approach also need to account for model uncertainties, which makes more complex again! Measurement scales – use locally valid subjectively defined scales Elicitation – assess possible changes in system outcomes and derive parameters implicitly (inversion) Dependencies – model through impact of intervention on common PSFs (eg workload) Model uncertainties – simulation

Broad brush effects on HR + Safety first culture Clear Quality standards - Quality drift Productivity focus Cost cutting

Example discrete feedback System is designed to have exponential time to failure with MTTF 1000 years However, due to lack of failures the system management becomes lax, and rate increases. When failure happens, system is reset to design standard. Suppose 1 failure per 30 years. + Hazard rate - Failure event

Model for failure rate is +t MTTF is 30= Solving gives =0.0017 Normal tail with mean –lam/mu and sd=1/sqrt(mu)

Local measurement scales example SLIM – based on MCDA Success Likelihood Index Methodology is an early HRA method Combines Performance Shaping Factor scores using “multiattribute utility” method to quantify Human Error Probability Key ideas Ideal points on PSF scale, Expert defined scores Pairwise comparison for attribute weights Two point calibration to identify scale length Common PSFs provide dependency across HR elements No nominal probability involved here! Theoretically a much better approach because don’t need to worry about the definition of the scale used to measure the PSF’s

Conclusions New growth in dynamic human reliability modelling Approaches more applicable to service operations Hybrid HR models with feedback loops give the possibility of modelling “soft” interventions BUT many open problems in implementing robustly

Acknowledgements Work in EPSRC funded project with Simon French, Jerry Busby, Emma Soane, David Tracy and others