1 CNC-CIGRE Study Committee Report October 18-20, 2010 VANCOUVER CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure.

Slides:



Advertisements
Similar presentations
The Public Finance and Empoyment Database of the OECD Dirk Kraan National Accounts Working Party Paris 1 December 2010.
Advertisements

1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
CIGRE Paris Session Sunday 24 th – Friday 29 th August, 2014 Monday 25 th … General Assembly Tuesday 26 th … SC A3 meeting Wednesday 27 th AM …
AG.03: CIGRE SC A3 Green Book planning
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Study Committee A2 Colloquium in Shanghai, September, 2015 Study Committee A2 Colloquium in Shanghai, September, 2015 SC A2 will have their.
CIGRE 2012 A brief report regarding B1 and D1 activities (related to cables) Ray (Refat) Awad
Annual Review Meeting of SC activities October 4, 2009 Toronto Study Committee C4 System Technical Performance Danielle McNabb, Hydro-Québec -TransÉnergie.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
Frankfurt (Germany), 6-9 June 2011 CIRED st International Conference and Exhibition on ELECTRICITY DISTRIBUTION Opening Forum Sven Lindgren President.
1 60 th CIGRE Technical Committee meeting Paris France, 1 September th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Sustainable Energy Systems Int’l H 2 Safety Conf, Pisa, Italy, 8-10 Sep IPHE projects focus on pre-competitive collaborative research, development.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Report on SC 17A Activity HV switchgear & controlgear Denis Dufournet Anne Bosma A3-14 (AG 01 ) 013 IWD.
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
1 OECD Work on the Safety of Manufactured Nanomaterials Environment, Health and Safety Division Environment Directorate OECD.
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
1 IEEE Intelligent Transportation Systems (ITS) Council, International Collaboration to help People Travel Smarter Daniel J Dailey Ph.D. Past President.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.
3 rd International RILEM Workshop on Concrete Spalling due to Fire Exposure – Paris September 2013 PAGE 1 RILEM Technical Comity TC HPB Physical.
Environmental issues and local development Partnerships and the Green Economy Styria, 11 th October 2010 Gabriela Miranda
Bureau for International Language Coordination
Conformity Assessment and Accreditation Mike Peet Chief Executive Officer South African National Accreditation System.
1 CIGRÉ Study Committee Report SCA2 October 19, 2008 Winnipeg Claude Rajotte, Hydro-Québec-TransÉnergie.
The International Federation for Information Processing.
OECD Short-Term Economic Statistics Working PartyJune Establishing guidelines for creating long time series for short-term economic statistics.
Submittal of C as an IEC/IEEE Dual Logo Document IEEE Switchgear Committee Main Committee Meeting 18 October 2007.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2010 Study Committee Presentation C1 System Development and Economics.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
GEO Work Plan Symposium 2012 ID-01 Advancing the GEOSS Data Sharing Principles.
SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2009 Activity Report for SC C1 System Development and Economics David.
IEEE CIGRE Liaison Report on SCA2 Transformers
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
CIGRE JWG / CIRED Power Quality Indices and Objectives Progress report on joint Cigré / Cired Germain Beaulieu, conv. February 2003.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
The GRADE website and membership Yngve Falck-Ytter, M.D. Case Western Reserve University School of Medicine Barcelona, January 12&13, 2012 GRADE January.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Standardization Management Board Decisions How They Affect Your TAG! Jim Matthews Vice President & SMB Chairman.
Working Group on the Value and Benefits Chair´s Report 7th Meeting of the Steering Committee of the INTOSAI Committee on the Knowledge Sharing and Knowledge.
Session 2 (System Aspects) Rapporteur: Hiroshi Okamoto (JP) 2 nd International Symposium on International Standards for Ultra High Voltage, New Delhi,
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
GIGRE in the Dynamic Change of the Electric Power Sector GIGRE in the Dynamic Change of the Electric Power Sector Klaus Fröhlich President of CIGRE.
IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components.
IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components.
IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components.
IASC Mission IASC is a non-governmental organization whose aim is to encourage and facilitate cooperation in all aspects of Arctic research, in all countries.
“Hydrogen detection apparatus” Dr. Ichiro Matsubara, convener
Protection Specialist
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
ISO TC268 SC1 - Smart Community Infrastructures -
CIGRE WG C4.28 Extrapolation of EMF measurements
Evolution of the IECEx Scheme – Ex TAG Training Workshop Shanghai
Evolution of HV Cable Systems
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
For 24 countries with more than 20 citations, this figure compares contributions to ESMO and the UK cancer CPGs. Solid line of identity indicates equal.
Standardization Management Board Decisions How They Affect Your TAG!
Presentation transcript:

1 CNC-CIGRE Study Committee Report October 18-20, 2010 VANCOUVER CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure

2 SC – A3 Mission of the Study Committee The mission of SC A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge in the field of high voltage equipment, and to add value to this information and knowledge by means of synthesizing state-of-the-art practices and developing recommendations.

3 Responsible for the theory, design, construction, and application of High-Voltage equipment components, equipment, and equipment systems for both AC and DC systems. It includes all other High-Voltage equipment not specifically covered under another equipment study committee’s scopes Emphasis is on function and interaction of HV Equipment Maintain liaison with standardisation bodies such as IEEE, IEEE- PES, IEC, CENELEC, CSA SC – A3 Scope

4 The SC currently consists of a Chairman (Mark Waldron, UK), a Secretary (Edelhard Kynast, GE), 25 Regular Members and 5 Observer Members. The 25 countries represented by Regular Members are: Australia, Austria, Bosnia-Herzegovina, Brazil, Canada, China, Czech, France, Germany, Greece, India, Ireland, Italy, Japan, Korea, Norway, Poland, Portugal, South Africa, Spain, Sweden, Switzerland, The Netherlands, United Kingdom and United States The constituents of the SC come from Utilities, Manufacturers, Consultants, Research and Testing establishments and Universities. SC – A3 Study Committee Membership

5 TypeNumberTitle of groupName of ConvenerDate “on” Date “off” AGA3.01Strategic PlanningM. Waldron (GB)2002 AGA3.02TutorialsD. Peelo (CA)2001 WGA3.06Reliability of High Voltage EquipmentC. Sölver (SE) WGA3.15Non Conventional Instrument TransformersP. Tantin (FR) WGA3.17Surge ArrestersB. Richter (CH) WGA3.21Non-ceramic insulatorsM. De Negris (IT) WGA3.22UHVHiroki Ito (JP) WGA3.23Guidelines and selection of FCLH. Schmitt (DE) WGA3.24Simulating Internal Arc and Current Withstand TestingM.Kriegel (DE) WGA3.25MOV and SA for emerging system conditionsB. Richter (CH) WGA3.26Capacitor bank switchingA. Bosma (SE) WGA3.27Vacuum switchgear at transmission voltagesR. Smeets (NL) WGA3.28Switching phenomena & testing for UHV and EHVH. Ito (JP) WGA3.29Ageing substationsA.Maheshwari (AU) WGA3.30Overstressing of substation equipmentA. Carvalho (BR)

6 WG A3.06 Reliability of HV equipment Convener: Carl-Ejnar Sölver Membership 23 members (1 corresponding) Canadian member: Bill Bergman (CM; PowerNex) Highlight The data base is in a very final stage and the analysis is starting within task forces which are focused on specific equipment. Publication: CIGRE 2011, CTB to be completed, “The 3rd international enquiry on failures of HV equipment and GIS” SC – A3 Report on Working Groups

7 WG A3.15 Non Conventional Current Transformers Convener: Pascal Tantin Membership: Past-convener Pascal Tantin and reviewers Canadian member: Farnoosh Rahmatian (Quanta Technologies) Highlight: Final revision by special task force completed and pending authorization for publication and future 2011 Electra Report. - WG will be disbanded. - «NCIT with digital output» : New TOR to be proposed in SC – A3 Report on Working Groups

8 WG A3.17 Surge Arresters Convener: Bernhard Richter Membership 22 members (7 corresponding) Canadian member: Jack H. Sawada (Eng. Consulting Services) Highlight: The draft TB and Electra paper will be finalized within the next weeks and ready for distribution within the SC in September - WG has been disbanded at Paris 2010 meeting Publication: CIGRE 2008, A3-309, “Energy handling capacity oh HV metal-oxide surge arresters”; CTB and Electra paper have been finalized SC – A3 Report on Working Groups

9 WG A3.21 Application of Non-ceramic Insulators Convener: Bernhard Richter Highlight: The WG is effectively closed Publication: Final draft being circulated SC – A3 Report on Working Groups

10 WG A3.22 UHV Equipment Convener: Hiroki Ito Membership 34 members (9 corresponding) Canadian members: Yvon Filion (Hydro-Québec TransÉnergie) David Peelo (DF Peelo & Associates) Highlight: The draft of the TB are pending approval Publication: CTB 2010, “Background of technical specifications of substation equipment exceeding 800kV ” and Symposium Paper A3-3.1, 2009, “System impact on UHV substation equipment ” SC – A3 Report on Working Groups

11 WG A3.23 Application & feasibility of FCL in power systems Convener: Heino Schmitt Membership 25 members (2 corresponding members) Canadian members: Yves Brissette (Hydro-Québec Technologie) Ken Edwards (BPA) Highlight: A guide on «how to test FCL» is being prepared by IEEE WG A contact is made to benefit from this close relationship Liaison: Interest of FCL community to link with new IEEE WG “Guide for Fault Current Limiter testing ” SC – A3 Report on Working Groups

12 WG A3.24 Simulating internal arc & current withstand testing Convener: Neudad Uzelac (formely Martin Kriegel) Membership 18 members (3 corresponding) Canadian members: Ryszar Pater (Hydro-Québec Technologie) Iulian Profir (Rockwell Automation Canada) Highlight: Work progressing adequately Publication: CTB TBD/2010, “Tools for the simulation of pressure rise due to internal arc in MV and HV switchgear ” SC – A3 Report on Working Groups

13 WG A3.25 MOV and SA for emerging system conditions Convener: Bernhard Richter Membership 22 members (4 corresponding) Canadian member: OPEN Highlight: Work progressing adequately. - The subject of «ageing of SA» is deemed important to this WG SC – A3 Report on Working Groups

14 WG A3.26 Influence of shunt capacitor banks on CB fault interruption duties Convener: Anne Bosma Membership 19 members (3 corresponding) Canadian member: Bruce R. Sunga (BCHydro) Highlight: Work progressing adequately. - Mandate also to include «series reactors». SC – A3 Report on Working Groups

15 WG A3.27 The impact of the application of vacuum switchgear at transmission voltages Convener: Rene Smeets Membership 27 members (5 corresponding) Canadian member: René Doche ( Hydro-Québec TransÉnergie) Highlight: Just underway, yet work progressing adequately. SC – A3 Report on Working Groups

16 WG A3.28 Switching phenomena and testing requirements for UHV & EHV equipment Membership 40 members ( 7 corresponding members) Canadian members: Sébastien Poirier (Hydro-Québec TransÉnergie) David Peelo (DF Peelo & Associates) Highlight: Kick-off meeting was held in Paris. Activities planned: 3 task groups to conduct a benchmark study and gather field experience with various CB technologies and compare simulation results with model networks and/or actual substations. SC – A3 Report on Working Groups

17 WG A3.29 Deterioration of ageing substation equipment and possible mitigation techniques Convener: Anwar Maheshwari Membership: call for experts still running Canadian member: OPEN Activities planned: Assets are expected to remain in service for longer than ever before. At the same time, guidance in this field is not readily available. This WG proposes to undertake a comprehensive review of experiences in the field of degradation process, lifetime assessment and life extension techniques and asset condition monitoring. SC – A3 Report on Working Groups

18 WG A3.30 Impact of overstressing on substation equipment Convener: Antonio Carvalho Membership: Call for experts still running Canadian member proposed: OPEN Activities planned: In addition to classical, condition based, end-of-life considerations, lifetime management is now facing system conditions that may exceed proven equipment capabilities, often referred to as «overstressing». The WG will review end-of-life decision making in this changing environment. SC – A3 Report on Working Groups

19 New work items (some examples) 1.«Instrument transformers with digital output» / Convener: Farnoosh Rahmatian (CA) 2.«Requirements for interruption of short-circuit currents with delayed zeros» / Convener: Jorge A. Filho (BR) This may also interest other SC’s in the network modeling area 3.«DC equipment» : Is it the right time to start WG work on DC substation equipment ? There is already interest for DC circuit- breakers. Chairman of SCA3 to discuss this subject with SC B4. SC – A3 Report on Working Groups

20 SC A3 Website /

Groupe – Technologie 21 © SC A Hubert Mercure Canada (450) Do you wish to be part of SC A3’s Canadian discussion forum ? Please contact me: Take-away SC A3 summary sheet available