1 INTRODUCTION P OSTAL A UTOMATED R EDIRECTION S YSTEM First Article Test Site = Central Florida District Mid-Fl Plant Orlando Plant Mid-Fl CFS Unit CFD.

Slides:



Advertisements
Similar presentations
Mail Handling Unit 2D. Mail Handling The way in which mail is dealt with depends on the: –Size of the organisation –Number of staff involved –Type of.
Advertisements

PARS Activation Readiness Human Resources Central Florida District First Article Test - Sept Nov. 7, 2003.
NCOA Link® and ACS ™ — Which is Best? National PCC Day September 10, 2014 Audrey Conley, Address Management, USPS ® 1.
® Service Performance Measurement using Intelligent Mail & Seamless Acceptance.
Global Systems Management Surface Visibility Presented by USPS at July 10 Packages Subgroup Meeting.
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013.
® Flats Symposium 2008 USPS Engineering - Future Technology National Postal Forum ® Walt O’Tormey Vice President, Engineering USPS National Postal Forum.
Mailers+4 The #1 Mailing Software in the Industry.
Registered Mail Redesign Program MDPS Briefing August 7 th, 2008.
® ACS PROCESSING IMPROVEMENTS IN CFS AND DELIVERY OPERATIONS May 26, 2011.
Small Office Variance (SOV) Course Number 100####.
1 MID-FLORIDA CFS and CFPS Unit C hange-Of-Address F orms P rocessing S ystem C omputerized F orwarding S ystem.
PARS OPERATIONS OVERVIEW. 2 PARS OPERATIONS OVERVIEW PARS Plant Training PERSPECTIVE 43 Million COA Orders 4.3 Billion Machineable UAA Letters $ 1.9 Billion.
Progress with the Postal Act of 2006 November 18, 2009.
1 DSCF Entry Discount Review Tampa Bay Suncoast PCC January 14, 2015.
CEO Juice Process for Sales Orders: Paperwork to Delivery Equipment Sales Order Process.
FSS / DPP PROGRAM OVERVIEW Flats Sequencing System & Delivery Point Packaging Status Update February 2005.
1 Understand The Differences in the Change-of-Address Programs National Postal Forum March 17 – 20, 2013 Michael Tate, SVP Enterprise Postal Strategy,
Postal Automated Redirection System (PARS) John Keegan Manager, Automation Equipment Engineering Mailers´ Technical Advisory Committee (MTAC) November.
Solar Metering and Performance Monitoring Exposition June 4, 2007.
Through Innovative use of Technology and Process Enhancements.
UPU & IPS Web Established in 1874, the Universal Postal Union (UPU), with its headquarters in the Swiss capital Berne, is the second oldest international.
Background on USPS mail forwarding operations Overview of PARS
MTAC Workgroup 114 Establish Service Standards and Measurement First-Class Mail Measurement July 24, 2007 FCM Subgroup Meeting.
1 New Move Update Standards Keeping Track of Your Customers Malaki Gravely Business Mail Entry Unit US Postal Service Baltimore PCC March 24, 2011 Baltimore,
Overview of Scanning Presented by Tom Day Senior VP, Intelligent Mail & Address Quality Friday, February 20, 2009 Webinar #14.
® Product Visibility Baltimore PCC Jeff Freeman Manager, Network Visibility Systems March 16, 2012.
® Intelligent Mail Update Measurement & Barcodes Periodicals Subgroup June 25.
Network Rationalization Mail Moves, Labeling Lists and Mail Direction File Industry Webinar July 1, 2013 To listen to a recording of this presentation.
Status of NDC Activations MTAC Briefing August 12, 2009.
® Service Measurement & Reporting Format MTAC November 7, 2007.
® Flats Update Rosa Fulton Executive Director, FSS Krista Finazzo Manager, Operational Requirements MTAC – November 2010.
® MTAC Workgroup 114 Establish Service Standards and Measurement USPS Service Measurement Capability July 31, 2007.
Mailers Technical Advisory Committee John Sadler Manager, Business Mail Acceptance August 2001 Mailers Technical Advisory Committee John Sadler Manager,
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
Corporate Flats Strategy MTAC November 7, Slide 2 Presentation Overview Background Near Term Actions (FY 2003 and 2004) Longer Term Planning (FY.
Moving the Mail. NETWORK FACILITES NDC NETWORK RE-EGGINEERING HOW YOUR MAIL MOVES IMPROVING THE PARNTERSHIP.
MTAC Meeting February 23, 2005 Integrated Mail Management.
Intelligent Mail February Vision Provide end-to-end visibility and a seamless process for mail acceptance and delivery, using standardized intelligent.
1 MID FLORIDA P&DC PARS READINESS ASSESSMENT Mail Processing Mid-FL P&DC Orlando P&DC.
1 Gary Reblin and Jan Caldwell Intelligent Mail & Address Quality Intelligent MAIL ™ in the U. S. Postal Service MTAC February 5, 2004.
POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)
USPS Product Information MTAC Jim Cochrane Vice President, Product Information February 17, 2011.
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
® Letter Automation History Bill Galligan Senior Vice President, Operations MTAC Meeting January 31, 2008.
® Intelligent Mail® and Start-the-Clock (101) Presented by Pritha Mehra, Vice President, Business Mail Entry Friday, October 10, 2008.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
MTAC Workgroup # 87 Update Improving the Drop Shipment Process Washington, D.C. May 18, 2006.
1 FOOTER (10PT. ARIAL, BOLD, GREY, CAPS) TITLE OF PRESENTATION (24PT. ARIAL, BOLD, ALL UPPERCASE) Subtitle (20pt. Arial, Bold, Title Case) Network Rationalization.
® August 12, 2009 MTAC General Session August 12, 2009 MTAC General Session Update.
® Intelligent Mail Measurement Readiness. Letters - Automation Data Capture PointTechnologyTimelineBarrier Start the Clock: Induction Acceptance scans.
1 Intelligent Mail – Importance and Vision February 5, 2003 MTAC Briefing Charles Bravo, Sr. V.P. Intelligent Mail and Address Quality (IMAQ) Gary Reblin,
® Intelligent Mail Measurement Readiness June 13, 2007 Full WG Meeting.
1 Move Update February Move Update Nov. 23, 2008  Move Update required for mailpieces claiming Presorted or Automation prices for First-Class®
® Webinar #10 Commercial First-Class Mail and Standard Mail Measurement Presented by Tom Day Senior Vice President, Intelligent Mail and Address Quality.
Office Performance AM Standard Operating Procedure Improvement Through Management.
1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.
1 Operations’ Update Fall and Holiday Periods 2002 Mailers Technical Advisory Committee Meeting August 7, 2002.
POSTAL AUTOMATED REDIRECTION SYSTEM (PARS). Page 2 PERSPECTIVE 43 Million Change of Address Orders 4.3 Billion Machineable UAA Letters $1.9 Billion Spent.
ENTER To view the PS Form 3546 tutorial slide show, press the F5 key or click on Slide Show at the top of this window. In the dropdown window, click View.
Military Postal Service Agency FOUO 1 DoD Mail Acceptance & Delivery Solutions.
Presented By: Ms. Fran Mutschler DDC J4/5 Supply Chain Transportation Distribution Planning & Management System (DPMS)
POSTAL AUTOMATED REDIRECTION SYSTEM (PARS). SYSTEM AND OPERATIONS OVERVIEW.
® Managing Function 4 AM Operations WSS/ WSH Don Marbrey Ken Capps June 2011.
PARS MAIL PREPARATION. PARS DEFINITIONS CFS Computerized Forwarding System CIOSS Combined Input Output Sub System CIF Carrier Identified Forwards RTS.
USPS Pricing October 24, 2011 | 12:30 – 1:30 pm Eastern Time
TYPES OF SERVER. TYPES OF SERVER What is a server.
Mail Prep & Entry Pre-MTAC Webinar
Reduce Your Return Mail By One Third
Network Rationalization
Presentation transcript:

1 INTRODUCTION P OSTAL A UTOMATED R EDIRECTION S YSTEM First Article Test Site = Central Florida District Mid-Fl Plant Orlando Plant Mid-Fl CFS Unit CFD Delivery Offices Tampa REC

2 PERSPECTIVE 43 Million Change-of-Address Orders 4.3 Billion Machineable UAA Letters $1.9 Billion Spent on UAA Processing POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)

3 PROCESSES AUTOMATED BY PARS Change-of-Address Forms Processing UAA Redirection Processing (Forwards) Postal Service UAA Endorsement Application (RTS) Form 3547 Address Change Notification POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)

4 KEYS TO SUCCESS POSTAL AUTOMATED REDIRECTION SYSTEM (PARS) Provide Service to Improve Customer Satisfaction Automate Operational Efficiency Remove Mechanized Terminals Save Work Hours and Complement

5 TOTAL ANNUAL WORK HOUR SAVINGS PHASE-1 Savings –Function 1 – Mail Processing 80 K –Function 2 – Carriers 120 K –Function 4 – Delivery Unit Clerks 920 K –Function 4 – CFS 2.0 M Costs –Maintenance 27 K –Training 34 K –Remote Encoding Centers 270 K Net Work Hour Savings 2.8 M POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)

6 PARS PROGRAM SCHEDULE Contract Award - Phase IJune 2002 First Article Testing Sept – Nov 2003 (Mid-FL P&DC) Start Deployment Nov 2003 (53 PDC/86 CFS/20 REC) CFPS Deployment Sept – February 2004 Finish Deployment – Phase IAugust 2004 Full Deployment - Phase IIMarch 2006 POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)

7 First Article Test FAT Equipment Installation (2 weeks) = August 18 – August 31 FAT MP Equipment Modifications and Training (2 weeks) = September 1 – September 14 FAT Contractor Siemens Pre-Test Period (2 weeks) = September 15 – September 28 FAT USPS September 29 th (2 weeks) = arrival of test crews, people PARS USPS First Article 4 weeks = October 13 – November 7

8  First Article Test CIOSS Operation FAT live test Oct 13th - Nov 7th (4 weeks) 200 daily volume with PARS Interception 16k Seeded Test pieces Carrier Identified volume from selected AO’s RTS volume from selected AO’s CFPS/CFS Operations & REC COA keying MID-FLORIDA PARS Testing POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)

9 Siemens AreaHQ Maint AreaVisitors AreaSiemens Room DEL/OPS/CSVCTest Team Room & Verification Area

10 NEW EQUIPMENT AT P&DCS CIOSS Machine –Modified DBCS Phase 2-5 –Additional 24’10” –DIOSS, BCS Processing Software Enhancements to Existing MPE –AFCS, OSSBCS –MLOCR –DBCS Image Handling and Database Intercept Capability AFR – Advanced Forwarding Reader RIC – Redirection Image Controller FSU – Forward Storage Unit CARS – Change of Address Record Server POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)

11 RETURN TO SENDER MAIL Carrier Identifies Machineable RTS Mail RTS Mail Dispatched Using Separator Cards With RTS Placards CIOSS Staging Area For RTS Image Lift Mode CIOSS RTS Image Lift Run CIOSS Staging Area For RTS Label Mode CIOSS Label Mode Run Pull Rejects and Dispatch Mail Postal Service Endorsements POSTAL AUTOMATED REDIRECTION SYSTEM (PARS)

12 POSTAL AUTOMATED REDIRECTION SYSTEM (PARS) CARRIER CONFIRMED FORWARDS Carrier Identifies Machineable Forward Mail Dispatch Mail to The Plant With Forward Placards CIOSS Staging Area For FWDS Image Lift Mode CIOSS FWDS Image Lift Run CIOSS Staging Area For FWDS Label Mode CIOSS Label Mode Run Pull Rejects and Dispatch Mail

13 POSTAL AUTOMATED REDIRECTION SYSTEM (PARS) INTERCEPT MAIL COA Mail Captured on Most Automation Letter Machines ISS Modes Flow to CIOSS Label Mode DBCS Intercept Flow to CIOSS Image Lift Mode

14 DBCS #11, ready for the CIOSS modification Workroom floor ready for 25’ addition

15 Move OSS #1 off the workroom floor Move OSS #3 into vacant #1 slot Move Patch-up & Maint Cage Move OSS #4 to CIOSS area (temp) Install DBCS-EC Install DBCS #17 Move DBCS #15 Move OSS #4 from CIOSS slot Move DBCS #11 & turn 180 o Install FAT CIOSS mod. Move CIOSS #1 to CFS Move DBCS #15 to CFS for CIOSS #2 mod

16 Install: FCS, KFP, Scanner, #1 CIOSS #2 CIOSS Excess: All 13 Mech. Terminals, Non-Mechs, 3547 printer

17 PARS - Mid-FL Plant Issues TRAINING RBCS / PARS IMAGE MANAGEMENT PARS FAILURE CONTIGENCY, CIOSS/CFPS MAIL PREP, Plant/Delivery Units Local “Waste” Mail Procedures SEPARATOR CARDS OPERATING PLAN PARS MAIL - TO DELIVERY UNITS

18 MPE INTERCEPT DBCS (to Image) ISS, OSS, AFC (to Label) CIOSS IMAGE LIFT MODE Oper RTS Oper Carrier Identified Forwards Oper 095/096 - rescan/other CIOSS LABEL MODE Oper Intercepted FWDs Oper Carrier Identified Forwards Oper RTS PARS - Mid-FL Plant Mailflows  Future new flows from DDC Interception

19 MID-FLORIDA CFS and CFPS Unit C hange-Of-Address F orms P rocessing S ystem C omputerized F orwarding S ystem

20 PARS Changes for CFS Unit Removal of All Mechanized Workstations Mailflows between CIOSS Plant Operations COA Forms Scanning and Rejects keying 3982 Labels for “Moved/Hold” Addresses CIOSS Rejects and Parcels FFT keying

21 Determine Complement Impact for CFS Unit LDC-49 Volume and Workhour Staffing Analysis DAR Analysis Period CFS LDC-49 Complement History »Bottom-line Annual Workhour Savings = 87,300 hrs

22 CFS Arrival Profiles RTS and COA Carrier Identified – 327 Inbound Dock CT 19:35 Mail Prep = 21:35 – ORL Inbound Dock CT 23:30 Mail Prep = 01:30 A B C D E COA Intercept, Originating – 327 OGP CET 23:20, CT = 00:20 – ORL OGP CT = 00:40, MFL Arv = 01:50 COA Intercept, Destinating – 327 AADC, Committed CT = 04:15 – ORL AADC, Committed CT = 04:00 – Mid-FL HASP, CT = 15:00 – ORL DDCs, CT = 08:00 (pending) F G H I

23 Arrival Profiles RTS/Identified - COA Intercept 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 A Oper Plan C.T. BCDE I GHF A CollectionsB -328 CollectionsC - 329/347 CollectionsD OGPE - ORL OGPF AADCG - ORL AADCH HASP I - ORL DDC

Label Generation Labels are Printed in Carrier Route ID Order Labels without a Carrier Route ID are Printed Last Each Zone Ends with a Zone End Label Dispatch by CT, with No-Record volumes

25 CFPS/CFS Operating Plan CFS Operations –12:30 CFS Crew FFT volume processing Lead Clerk, scans/KFP available volume –21:00 CFS Crew Completes FFT volumes Preps Incoming, COA forms, EXFC intercept Scanning/OSW/KFP/3982 print crew Finalizes CIOSS Forwards rejects – CIOSS Operations 09:00am - 01:00 am

26