Xoserve sense checks & validation Reasonable Endeavours Claims.

Slides:



Advertisements
Similar presentations
DRAFT Shipperless and Unregistered sites 3 November 2010.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
THEFT OF GAS TEAM. THEFT OF GAS TEAM PO Box 6803, 31 Homer Road, Solihull, B91 3LT Fax : Free Phone : Seamus Rogers Account.
Data Logger/ Daily Meter Reading Processes. New Daily Metered Site  DM Service Provider receives a request from Gas Shipper for installation of daily.
Reasonable Endeavours Claims Distribution Workstream MOD231 16/12/08.
Income Tax Bar Association Karachi WORKSHOP ON SALES TAX Pearl Continental Hotel, Karachi 15 – 16 July 2005.
Energy Networks Association Root cause solution for unregistered sites / MPRN creation David Mitchell 1 st November 2013.
Adjustment & COCP Barbara Kwok Licensing Operations Specialist.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CHAPTER FOUR – SOURCES OF FINANCE. SOURCES OF FINANCE  Internal Sources  Refers to funds that are generated from within the firm itself – from owner’s.
1 Modification 422 Creating the permission to release data to Meter Asset Provider organisations A presentation by the Community of Meter Asset Providers.
CONSUMER PROPOSALS. WHAT IS A BANKRUPTCY PROPOSAL? Proposed agreement between debtor and creditor Serves as a legally binding compromise between parties.
UNC Urgent Modification Proposal 0275 Supplemental Analysis and Timeline.
Part Seven Sales And Receivable Audit. Structure of Seminar 1. Control objective and Control procedures 2. Tests of control 3. Substantive tests 4. Trade.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Self-Insurance Quarterly Workshop Dave Sievert – Interim Director, Self Insured Department.
Shipperless & Unregistered Workgroup Friday 1 st November 2013.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
PN UNC Workgroup Supply Point Register 25 th October 2011.
P274 – National Revenue Protection Service. 2 Principles of X-industry gas theft service The impact on the participants will be revenue neutral (no supplier.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
DN Emergency Procedures – Theft of Gas Simon Trivella –15 th June 2009 Review Group 0245 – Theft of Gas arrangements.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Theft: Best practice 15 th June Best practice should extend across the process Investigation and detection. Data collection. Reconnection. These.
1 UP commercial basis 12th November User Pays commercial arrangements – type 2 services Four contractual documents published in the public domain: - Terms.
Distribution Network Interruption - Initialisation 28 September 2010.
Industry Shipperless &Unregistered Working Group Thursday 17 th September 10:30 at Xoserve.
ROM and DCA. Scene setting Our house Our aspiration for our house Our project manager Us.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Accounting & Financial Analysis 111 Lecture 8 Source Documents, Day accounts/Specialised Journals, Debtors & Creditors Subsidiary Ledgers.
Références, date, lieu Xoserve Service Model – Shipper’s View Total Gas and Power Ltd Gaz de France ESS.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
SEARCH POWERS PILOT S44-47 UK BORDERS ACT 2007 Police Training Presentation Central Policy Unit.
Current and New process Current Process New Process Response: Does not want service but live supply -Passed into Orphaned Report Intends to confirm – Remains.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 Industry Shipperless &Unregistered Working Group Thursday 7 th January 10.30am at xoserve.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
SoS Report PAC – 13th December 2016.
Administration of a FIDIC Contract - Project Control
Must Read Process Guide For Shippers
Chris Warner Network Code Manager
Incentives 26 September 2018.
Theft on Shipper-less Sites
Reasonable Endeavour Claims
Chris Warner Network Code Manager
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
TOG Review Group UNC245 Xoserve Actions.
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
SPA Processes for DM Sites
Deferral of Retrospective Updates Functionality
Joint Theft Reporting Review (from meeting 1st March 2019)
M Number Creation process
Project Nexus Workgroup
AQ BTU Form – Process & Timeline 29th September 2009
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
Presentation transcript:

xoserve sense checks & validation Reasonable Endeavours Claims

Required Evidence ClaimDescriptionValueEvidence Required 1 This claim can be made when the shipper has confirmed who the consumer is and has reported an offence of Theft to the Police involving Tampering (Gas Act Schedule 2B 10 1)/ Illegal connection (Gas Act Schedule 2B 11 1). £125 Evidence of Police notification. Or Witness statement or report. Or Police Details of Attendance. Or Crime Reference Number. Or other supporting evidence 2 This claim can be made when, under a Deemed contract (Gas Act Schedule 2B Para 8(2)) either: (a) the occupier was in unlawful occupancy with no genuine intent to pay; or (b) Occupier left the premises without informing Supplier of new address. £125 Evidence of Police notification. Or Witness statement or report. Or Police Details of Attendance. Or Crime Reference Number. Supporting evidence: TOG KwH value, Dates etc. 3 This action can be made when the consumer has been issued an Invoice for the Theft. ‘Costs incurred’ includes those associated with the replacement of damaged meters and gas fittings, isolation and restoration of the supply, investigation and debt recovery insofar as the supplier is entitled (whether by contract, deemed contract or otherwise) to recover the amounts. The demand should clearly show how the charges have been calculated. £125 Estimated gas used – KwH. Details of actual costs. Details of Work undertaken.

Required Evidence Cont. ClaimDescriptionValueEvidence Required 4 This claim can be made when the shipper has made available payment arrangements with the consumer, which have broken down in part or full. Where arrangements to pay for the gas taken illegally have been made available it should also be taken into account the person’s ability to pay and must not provide an opportunity for the person to avoid any part of the payment, which could reasonably be made. Where appropriate, a prepayment meter should be installed to assist recovery of the charges. £125 Evidence of payment arrangements. Copies of invoice/letters issued. Steps taken to recover charges. Percentage of value to be claimed 5 This claim can be made when the consumer fails to pay or breaks payment agreement terms and the shipper has exercised their right to disconnect the consumer and the consumer has made no attempt to rearrange payment. £250 Disconnection method. Disconnection date. Meter Point Status. Steps taken to recover charges. Percentage of value to be claimed. 6 This action is where the consumer has become either bankrupt, interim order or gone into liquidation. £125 Document from receivers that the claim for costs has been submitted and how much the receiver has advised will be distributed to the Supplier. Percentage of value to be claimed. 7 Where civil action is taken against an I&C customer. To value of costs Evidence of Civil action taken, documents submitted to the courts If no civil action taken, evidence of reason not to take this action

General Validation ConQuest System Checks - The information held on Conquest for the related TOG Contact is compared with the information provided on the claim form. SPA Management Criteria - The information on the claim form is compared to UK-Link. UK-Link Checks - Additional information is obtained from UK-Link for the MPRN provided on the claim form. This is used when raising the invoice. Supporting Evidence – This is to check that the evidence provided to support the claim is adequate.

The main classifications of the rejections are listed below: A. A valid TOG Contact does not exist on Conquest. E.g. Shipper states “Not Pursuing” on corresponding TOG Contact. Shipper does not provide kWhs or ToG period on Corresponding TOG Contact. No theft details have been provided on the Conquest TOG Contact. B. Information/eviden ce provided is not sufficient. E.g. Mandatory information or evidence has not been provided. C. Information/eviden ce provided does not concur with xoserve systems. E.g. Witness Statement claims meter was removed but UK-Link shows meter still in situ. Information provided on the Conquest TOG Contact does not match that provided on the claim. D. Information/eviden ce provided suggests payments have been completed or are being made. E.g. Witness Statement claims payments have been completed. A credit meter has been subsequently fitted. Letter to End User states that supply would not be reinstated until payments were made, and supply is Live. E. Information/eviden ce provided invalidates claim. E.g. Witness Statement states “Not Reported to the police” Evidence suggests that end user has not been issued with an invoice. F. Claim has been previously submitted. E.g. A previous claim has been submitted for this instance of theft. G. Incorrect claim type has been submitted. E.g. Claim 3 has been submitted when Claim 2 should have been submitted. H. Claim is for period outside Shipper ownership. E.g. Claim submitted is for a period which is entirely or partially for a period when the site was not supplied by the shipper. Rejection Reasons

Questions on the Validation of the Proposed Scheme (MOD231)  Will evidence be submitted to support the costs incurred?  Will xoserve be required to carry out any additional validation?