ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.

Similar presentations


Presentation on theme: "ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights."— Presentation transcript:

1

2 ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. Meter Reading Replacement Modification Proposal - Update Stefan Leedham 26 August 2009

3 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 3 OBJECTIVES Action to provide examples Define Replacement Meter Readings Proposed solution User Pays Way forward

4 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 4 EXAMPLES Cross Meters: requirement to ensure that all meter readings are registered to the correct MPRN and address Duplicate readings: meter reader versus consumer versus xoserve IT issues Incorrect MAM flows EDF Energy requires the ability to correct data for sites were an error has occurred.

5 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 5 METER READING REPLACEMENT UNC TPD J 3.7.3: “In respect of the most recent Valid Meter Reading provided to the Transporter in accordance with paragraph 3.4 or 3.5 a User may at any time secure and provide to the Transporter a revised value of such Valid Meter Reading ("Revised Meter Reading"). “ UNC TPD J 3.7.4: “The Transporter will only accept such Revised Meter Reading where the Meter Read Date of such Revised Meter Reading is the same as or later than the Meter Read Date of the most recent Valid Meter Reading recorded by the Transporter.”

6 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 6 REPLACEMENT METER READING Based upon the current UNC a replacement meter reading is: Any meter reading taken on a date the same as or later than the most recent meter reading. Therefore the replacement meter reading does not have to be taken on the same date. EDF Energy is looking to maintain the same principle for meter reading replacement but allow the replacement of a meter reading when a subsequent read has been submitted.

7 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 7 REPLACEMENT METER READING TIMELINE Meter Reading Submitted to xoserve Replacement meter reading can be submitted for any subsequent day Closed

8 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 8 PROPOSED SOLUTION Create new meter reading type of Historic Revised Meter Reading An Historic Revised Meter Reading can replace a meter reading were a subsequent meter reading has been submitted provided that the date is later or the same as the meter reading it is replacing but earlier than the subsequent meter reading. The Historic Revised Meter Reading will be available for AQ Amendments and AQ Appeals The original meter reading will be used for any adjustments. This will be a temporary solution until system developments allow full retrospective updates including reconciliation. A User Pays Meter Reading Replacement report will be available to Users on a User Pays basis.

9 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 9 PROPOSED REPLACEMENT METER READING TIMELINE Meter Reading Submitted to xoserve Replacement meter reading can be submitted for any subsequent day up to D+64 Subsequent Meter Reading Submitted to xoserve D+65

10 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 10 USER PAYS EDF Energy believes this is a User Pays service: Additional service Shippers can chose to take the service Temporary solution Proposed funding: Development costs: 75% Shippers 25% Transporters Operational costs: 100% Shippers ICAM suggests 50/50 – but majority of benefits to Shippers Proposed Charges: Development costs: p/peakdaykWh/day Operational costs: p/Historic Revised Meter Reading submitted

11 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 11 WAYS FORWARD Any further development of Modification required? Are the business rules clear enough for a ROM? Options: 1. Mod/business rules require further development 2. A Transporter raises a ROM request with xoserve. The ROM is discussed at distribution workstream – how long will this take? Workstream report completed when ROM received Proposal and report submitted to panel for consideration 3. Mod Panel instructs Gas Transporters to construct a ROM

12 METER READING REPLACEMENT MODIFICATION PROPOSAL - UPDATE Stefan Leedham 26 August 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 12 QUESTIONS

13 ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. THANK YOU


Download ppt "ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights."

Similar presentations


Ads by Google