ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.

Slides:



Advertisements
Similar presentations
SRF Accelerator Test Facility at NML Jerry Leibfritz May 23, 2011.
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
SRF Beam Test Facility at NML Jerry Leibfritz April 26, 2010.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Progress and Plan for Superconducting RF Cavity RF Group.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
F ILC Accelerator R&D and AAR&D at NML Sergei Nagaitsev FRA Visiting Committee Review April 20/
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
F ILC/SRF Strategic Planning OHAP Rich Stanek September 17, 2009.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
SRF Infrastructure at Fermilab (and more) Rich Stanek Engineer’s Week February 15, 2010.
Facility Layout and Infrastructure Requirements Rich Stanek (on behalf of CMTF facility team) PXIE Program Review January 16-17, 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
CBETA Technical Review
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
Uppsala Commitment to ESS and FREIA Planning
Chris Adolphsen Sergei Nagaitsev
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Infrastructure and Test Facilities in the U.S.
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Injector / Linac Installation Current Status
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
LCLS Injector System Overview D. H
Injector/Linac Design Status C. E
Presentation transcript:

ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007

ILC Main Linac R&D Meeting – September 6, NML Project Overview Overall Plan –Build an ILC RF Unit Test Facility at New Muon Lab Building (NML) One ILC RF Unit (3 Cryomodules) 10-MW RF System ILC-like Beam (3.2 MHz, Up to Hz, 300-μm rms bunch length) Phase-1 (FY07 - FY08) –Prepare Facility for Testing of First Cryomodule (CM1) without Beam Infrastructure RF Power Cryogenics (Refrigerator #1) Phase-2 & 3 (FY08 - FY10) –Install Gun, Injector, CM2 and CM3, Test with Beam New RF Gun Move A0 Photo-Injector to NML and Install Test Beamlines Extend Building to fit Third Cryomodule Croyogenics (Refrigerator #2 and New Cryoplant-300W) Upgrade RF System to 10 MW

ILC Main Linac R&D Meeting – September 6, Exterior of NML

ILC Main Linac R&D Meeting – September 6, Overall Layout of NML Cryomodules Capture Cavity 1 (CC1) CC2 Gun RF System CC1 & CC2 RF RF Gun 5MW RF System for Cryomodules Space for 10 MW RF System

ILC Main Linac R&D Meeting – September 6, Phase-1 Layout of NML Cryomodule-1 (CM1) (Type III+) Capture Cavity 2 (CC2) CC2 RF System5 MW RF System for CM1

ILC Main Linac R&D Meeting – September 6, NML Building Infrastructure - FY07 Removal of CCM –Completed Removal of Chicago Cyclotron Magnet (CCM) –Filled in CCM Pit (~10’ deep) with Concrete Prepared Building Infrastructure –AC Power Distribution/Network Cabling –Relocated Piping, Cable Tray, Duct Work –Cleaned out Building, Epoxy Coated Floor –Began Preparation of Control Room (new ceiling, paint, carpet, furniture) –New AC Units in Office Area, Repaired Sewer Line, Replaced Boiler, New Roof

ILC Main Linac R&D Meeting – September 6, ILC Test Area at NML NML During Removal of Chicago Cyclotron Magnet(CCM) (September, 2006) NML Facility after CCM Removal and Floor Painting (February, 2007)

ILC Main Linac R&D Meeting – September 6, NML Test Facility Infrastructure - FY07 Test Facility Infrastructure –Construction of Cave for Phase-1 (~3/4 of Full cave) (90% complete) –Installed Electrical Racks and Cable Tray –Design of Waveguide Layout/Penetrations Complete –Beam Absorber/Dump Analysis complete Alignment –Installed Deep Rod Monuments (DRM’s) –Established Alignment Network –Installed Water Level System

ILC Main Linac R&D Meeting – September 6, Current Picture of NML Facility

ILC Main Linac R&D Meeting – September 6, View From North

ILC Main Linac R&D Meeting – September 6, NML Cryogenic System - FY07 Cryogenic System –Installed Gas Storage Tanks –Refrigerator #1 Complete & Ready to Operate Commissioning Started (8/28) –Distribution System Feed Can, Feed Cap, End Cap out for Bid Pipe Installation (50% complete) End Cap Support Girder Design in Progress –Added Positive Isolation Back into System Bayonets to Separate Injector Components from Cryomodules

ILC Main Linac R&D Meeting – September 6, NML RF System - FY07 RF System –5 MW for CM1 3 MW Klystron (from A0), Pulse Transformer, New Modulator Ready to Install (waiting for cave construction to finish) New 5 MW Klystron Ordered –300 KW for CCII (from DESY) Ready to Install (waiting for cave construction to finish) –5 MW for Gun 5 MW Klystron and Pulse Transformer coming from A0 Modulator Parts ordered –Distribution Waveguide, Distribution Components Ordered CM1 Distribution Coming from SLAC

ILC Main Linac R&D Meeting – September 6, NML Injector/Accel./Test Beamline - FY07 Injector –RF Gun Design is Progressing (Cavity-DESY, Cathode System-INFN) –Requisitions Written for Gun Solenoids and Power Supplies –Specification for New Injector Magnets being Reviewed –Injector Lattice being Finalized –Requisition Written for Laser Hut/Climate Controlled Instrument Room Accelerator –Cryo. Girder/CM Support Being Designed –First Cryomodule Assembly Began - 7/23/07 (Delivery 11/07) –Design Work has Begun on HOM Absorber Test Beamline –Lattice is being Finalized –Specifications for Magnets being Reviewed –Beam Absorber/Dump Analysis Complete

ILC Main Linac R&D Meeting – September 6, NML Auxillary Systems - FY07 Vacuum System –Components Ordered for (2) Vacuum Carts Leak Detectors, RGA’s, Pumps, Gages, Controls –Equipment for Insulating, Beamline, and Warm Coupler Vacuum Systems being Specified –Warm Beam Valves for CM1 Ordered –Designs for CM1 Vacuum Spools from Cold Beam Valve to Warm Beam Valve are Complete Water Cooling System –System Design Complete –Have New Pumps and Heat Exchanger –Piping Installation (80% complete) –Temporary Skid Moved to NML (for Phase-1) Safety Systems –Radiation, ODH, Safety Assessment, etc. Documentation Being Prepared

ILC Main Linac R&D Meeting – September 6, NML Controls/Instrumentation - FY07 Controls –Control Room Furniture Installed –Wireless Network Installed Throughout Building Instrumentation –Wire Position Monitors for CM1 –Faraday Cup Fabrication –RF Protection System Before After

ILC Main Linac R&D Meeting – September 6, Remaining Work for Phase-1 Finish Installation of: –Cave Roof –Cable Trays Over Cave –Cryogenic Distribution System –Control Room (computers, etc.) –Water Piping & Skid Install –RF Systems and RF Distribution for CCII and CM1 Waiting for Cave Completion (1-2 weeks away) –Safety, LLRF, and Control Systems –Cables –Fabricate Cryo Support Girder

ILC Main Linac R&D Meeting – September 6, NML Conventional Facility Building Extension Began Design of NML Extension with CF&S Group (FESS) Room for 6 Cryomodules (2 RF Units) Expanded Diagnostic and AARD Test Area Cryoplant (300W) Possible 2-Tunnel Design to Mock-up ILC Design

ILC Main Linac R&D Meeting – September 6, Schedule Milestones Refrigerator #1 Operational(8/07) Begin Civil Design of Building Extension(8/07) Move RF Systems to NML (5MW & CC2) (9/07) 1st Cryomodule Delivery to NML (Type III+)(11/07) Begin 1st Cryomodule RF Tests (Warm)(2/08) Begin Move of A0 Injector to NML(2/08) Move CCII to NML(2/08) Delivery of Waveguide from SLAC(2/08) PhotoCathode from INFN(6/08) Cryo System Components in Place(6/08) Refrigerator #2 Operational(7/08) Begin Construction of Building Extension(7/08) Begin Cooldown of 1st Cryomodule (8/08)

ILC Main Linac R&D Meeting – September 6, Schedule Milestones (Cont.) 2nd Cryomodule Delivery to NML (Type III+) (10/08) First Beam (Temporary Dump)(12/08) Order Cryoplant(12/08) Building Extension Complete(4/09) 3rd Cryomodule Delivery to NML (Type IV)(~4/09) Beam Through Full RF Unit(10/09) Replace 3 CM’s with Type 4+(2010) ILC RF Unit Operations(2011)

ILC Main Linac R&D Meeting – September 6, Goals for FY08 Goals for FY08 (Oct. 1, Sept. 30, 2008) –Install First Cryomodule (CM1) –Install RF, Cryogenics, Controls, LLRF, Instrumentation, Safety Systems, etc. to power and cooldown CM1 –Power and Cooldown CM1 –Install Laser Hut –Move/Install Injector (Gun, A0 Photoinjector, CCII) –Begin Construction of Building Extension