F. Formenti - November 22nd, 20111 Visit to NewFlex technology WHEN:September 5 th, 2011 (“detour return trip” after Kobe’s RD51 meeting) WHO: From CERN.

Slides:



Advertisements
Similar presentations
Sierra Proto Express Introducing our Micro Electronics Division.
Advertisements

Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
Carclo plc Analyst & Shareholder Presentation 22 nd and 23 rd June 2009.
CREATING STRATEGIC MANUFACTURING PARTNERSHIPS PROVIDING STRATEGIC MANUFACTURING SOLUTIONS.
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
One Way Circuits Limited Printed Circuit Board Manufacturer A Guide To Manufacturing Multilayer PCBs Use Left and Right Cursor keys to navigate ESC to.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
Manufacturers Profile Prototype, small to medium, quick turn production in Taiwan High volume production in China available Certificates : ISO/TS
Printed Circuit Board Design
RD51 22/11/2011 RD51 22/11/2011 Your PCB partner RD51 22/11/2011.
High Mix Low Volume High Tech. Shenzhen Sunshine Circuits Phase I Phase II ~1000km north of Shenzhen Sunshine. 3km to Long River New Factory in Jiujiang,
4/11/2011Rui de Oliveira1.  Collection of the biggest PCB failures we’ve seen at CERN workshop since 10 years.  The PTH (plated through hole) is the.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
TE/MPE/EM/PMT activity Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
Marco Bianchi, Maurizio Grimoldi - TVR - RD51 Collaboration Meeting, CERN 1 Professional Printed Circuit Boards and Value-Added Services TVR company presentation.
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Atsuhiko Ochi Kobe University 28 August 2012 ATLAS muon chambers R&D on micromegas meeting.
CERN PCB workshop activities
F. Formenti - Annecy industry-academia meeting on MPGDs - April 27th Efforts for industrialization of GEMs and Micromegas at CERN Outline: 1)WG6.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
1 Fulvio TESSAROTTO RD51 meeting, Paris, 14/10/2008 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
Dan Cheng 1/13/2015 LARP Copper Plated Trace Development Update.
Situation with industry Rui de Oliveira RD51 CERN October
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
Marc De Vos, Dr Russel Torah, Prof Steve Beeby and Dr John Tudor
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
Situation with industry
L. M. Pant 1, A. K. Mohanty 1, O. J. Pinto 2, S. Gadhadharan 2, Pradeep Menon 2, Archana Sharma 3, Rui De Oliviera 3 1 Nuclear Physics Division, Bhabha.
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors CERN TS-DEM-PMT Capabilities.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
Company Profile XIAMEN G&P ELECTRONICS CO., LTD. Jiayi Industrial Park, Huli District Xiamen, Fujian province, China TEL: FAX:
Piotr Bielówka ul. Muchoborska 18 PL Wrocław Phone: Phone/Fax E -mail: 22 nd.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
F. Formenti - RD51 collaboration meeting February 20th-22nd, Brief CMS and Atlas upgrade plans Status and follow up for: Newflex Eltos Techtra Recent.
Large area detectors Aida WP 9.2 RD51 WG6
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
5 th RD51 meeting (WG1) 25 May 2009 Atsuhiko Ochi ( Kobe University )
GEM foil and Simulation work at CIAE Xiaomei Li Shouyang Hu, Jing Zhou, Chao Shan, Siyu Jian and Shuhua Zhou Science and Technology Science and Technology.
Precision GEM Production in Korea Chonbuk National Univ. Hyunsoo Kim, Min Sang Ryu University of Seoul Minkyoo Choi, Younggun Jeng, Inkyu Park.
Low Mass Rui de Oliveira (CERN) July
Resistive protections Rui de Oliveira 09/12/15
PCB Manufacturing Automatisation
L. M. Pant, A. K. Mohanty Nuclear Physics Division Bhabha Atomic Research Centre, Mumbai on behalf of India CMS GEM collaboration Indian Industrial Outreach.
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
GEM Foil Development at ECIL
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
1 Fulvio TESSAROTTO THGEM discussion, 02/11/2009 THGEM production at ELTOS Production of THGEM at ELTOS S.p.A. Company profile Production procedures Small.
Suggestions for a MPGD Workshop in Frascati Rui de Oliveira 1.
Workshop How to make a PCB
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
GEM Production at NewFlex H.Taureg 1 WG6 Kobe 2011.
Large volume GEM production Rui De Oliveira TE/MPE/EM
Sierra Assembly Technology Inc.
Printed Circuit Board Design
GEM and MicroMegas R&D Xiaomei Li Science and Technology
GEM-VIEW: Direct Data Radiodetector based on GEM technology
Designing Process Of Printed Circuit Boards
DAEDUCK Micro via PCB
Development of thin GEM readout structures
Excellence PCB Co., Ltd Profile
Global Expert Technologies
USER-INTERFACE ASSEMBLIES & ELECTRONICS ASSEMBLY MANUFACTURER
Xiamen Qiangli Opto-Electronic Technology Co., Ltd
MPGD Experience with Technology Transfer
Presentation transcript:

F. Formenti - November 22nd, Visit to NewFlex technology WHEN:September 5 th, 2011 (“detour return trip” after Kobe’s RD51 meeting) WHO: From CERN :R. de Oliveira, F. Formenti, H. Hillemanns, H. Taureg (for RD51 collaboration) From Korea Uni.:Prof. Sung Keun Park (Director detector laboratory and CMS muon system) From NewFlex:Mr. Woo Hyun Lim (CEO), Mr. Ki Young Jung (new tech. devel. Team Manager) WHY:Feedback on first small prototype GEM Get agreement on GEM licensing procedure Propose plan for technology transfer Imperial city Emperor’s guard LINAC4 ???

NewFlex technology company Location: Asan, south west of Seoul, South Korea – about 1.5 hour by underground from Seoul center Size: 400 employees, m 2 plant surface Production capacity: ~40000 m 2 /month of Flexible PCB, ~ m 2 /month of Metal PCB 2F. Formenti - November 22nd, 2011

Also part of NewFlex group (note: both of these companies not visited) NewCRETEC Location: Asan, next to NewFlex company Size: 1250 m 2 plant surface Production capacity: ~6000 m 2 /month of Flexible PCB Specialized in fine pitch, chip on board NewFlex subsidiary in China Location: Qingdao, Shandong province Production capacity: ~12000 m 2 /month of Flexible PCB Being acquiring full process capability 3 F. Formenti - November 22nd, 2011

NewFlex profile - Established in 1992 (started as rigid PCB manufacturer) - Began Flexible PCB manufacturing in 1996 (15yrs experience) - NewCRETEC joined in 2009 Target market application fields: - LCD displays - Touch screens - Cameras and portable camcorders - Laptops and PC peripherals - Automotive - Cellular phones Flexible PCB commercial product ranges: - Single side ( µm thickness, 40 µm tracks) - Double side ( µm thickness, 50 µm tracks) - Multi layer (3-8 layers, ≥250 µm thickness, 70 µm tracks) - Rigid-Flex (4-8 layers) - Sequential build up & inner via holes (4-8 layers) Metal PCBs: - Semi rigid PCB with thick Cu tracks, - Used for power distribution, LED light sources Mr. Woo-Hyun Lim, NewFlex CEO Prof. Sung-Keun Park, Dir. Detect. Lab. Korea Uni. and CMS muon system 4F. Formenti - November 22nd, 2011

5 Example of standard production schedule: - Samples in less than 1 week - Production setup from 2 to 3 weeks - Production minimal order claimed not a problem (typically from industry 200 m 2 ) R&D on processes: - Embedded resistors (NiCr, low resistance ~10Ω/[], finite values range of units of kΩs) - Embedded capacitors (polyamide dielectric, low values, area limited) - Embedded optical waveguides (typ length 12 cm, attenuation 0.18dB/cm) - Silver ink jet flex PCB (future challenge of flex manufacturing) Future needs for CERN application: - Future investments on larger size machines (>0.6m) to be discussed with them NewFlex production and R&D

6F. Formenti - November 22nd, 2011 NewFlex facilities: lamination stations Several lines of reel to reel laminators for line production with fully automated chargers Laminators for panels Rough estimation: ~250m 2 area for lamination

NewFlex facilities: image transfer 7F. Formenti - November 22nd, 2011 Production line Laser Direct Imaging (LDI) with automated charger (CERN has the same but manual) Production line traditional manual exposure units

F. Formenti - November 22nd, NewFlex facilities: wet etching process This area is larger than the lamination one A few (perhaps 4 or 5) process lines operated in parallel

F. Formenti - November 22nd, NewFlex facilities: copper plating station This whole process is controlled by a single operator

F. Formenti - November 22nd, NewFlex facilities: flex stiffening and punching stations Two examples of client-customized flex stiffening machines

F. Formenti - November 22nd, NewFlex facilities: laser drilling (micro vias) and optical inspection Optical inspection (CERN has one similar machine) Laser drilling

F. Formenti - November 22nd, NewFlex facilities: test area Climatic chamber Microscope Electrical tests Mechanical flexibility tester

13F. Formenti - November 22nd, 2011 First visit November 2008 (organized by Changwon University) --- Explore company technology and know how Second visit June 2011 (organized by RD51 in collaboration with Korea University) --- Starting technology transfer --- New Flex has successfully produced first 8 cm x 8 cm GEM --- Satisfactory performance of 8 cm x 8 cm GEM; Third visit September 2011 (organized by RD51 in collaboration with by Korea University) --- Agreement on CERN license contract for GEM production --- Plan for production of 20 GEMs of 10 cm x 10 cm Goal to verify process stability Work started with the local support of Prof. Sung --- If OK, mass production of ~100 GEMs 10 cm x 10 cm to sell at CERN stores and also start prototype 30 cm x 30 cm --- If OK 30 cm x 30 cm, prepare large size CMS-like prototype (0.6 m x 1 m) To perform in 2012 GEM roadmap at NewFlex

F. Formenti - November 22nd, Conclusions on NewFlex visit -They master whole flex process -They have facilities for large area flexible circuits -They have large production capacity -They demonstrate interest to our application field -They share our plans -We can rely on a local contact -They need to fine-tune the technology -They must prove process stability conform to our specifications -They need to invest for machines >0.6m (long term issue to discuss) CERN should continue the GEM industrialization program with NewFlex