Requirement for PSR Primary Surveillance Radar

Slides:



Advertisements
Similar presentations
Second Global Symposium on TEM and NOSS in Air Traffic Control February 7, 2007 NOSS and the ATS Provider A Perspective from Senior Management Kathy Fox.
Advertisements

QUALITY OF SERVICES IMPROVEMENT PROGRAMMES
Aviation System Block Upgrades and NAV CANADA Planning 17 November 2012 Pre-AN-Conf/12 Workshop.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Air Traffic Management
Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA.
Continuous Climb Operations (CCO) Saulo Da Silva
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Agenda Item 5: Air Traffic Management (ATM) Issues WP- 06: Staged Implementation of an Unrestricted UPR Zone within Oakland Airspace (Presented by IATA)
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Ames Research Center 1October 2006 Aviation Software Systems Workshop FACET: Future Air Traffic Management Concepts Evaluation Tool Aviation Software Systems.
Air Law 1.05 Airspace References: FTGU pages TC AIM.
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Workshop on preparations for ANConf/12 − ASBU methodology
1 Introduction of new electronic systems for aviation Thor Breien, Dr. Ing Park Air Systems AS Presented by Linda Lavik.
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
AIR SPACE Airspace and Airports.
B.PRADHAN,IAS CVO,AAI. Structure of Presentation  Background  Why need Next Gen ATS  What is Next Gen ATS  Benefits of Next Gen Systems  Conclusion.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
1 Canadian Implementation of ADS-B Out Presentation to ASAS TN2 14 April 2008 Jeff Cochrane Manager, CNS Service Design.
1SWIM-SUIT Public Launch – 23 April 2007 System Wide Information Management in OATA Bert Nijhof OATA Technical Manager EUROCONTROL DAS/SAS/OCA.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Brussels December 5,20021 New Technologies and Airport Management Presented by Cesare Bernabei Università di Piacenza & Politecnico di Milano January.
St Louis Flying Club I 2008 Annual Meeting 2008 Annual Meeting.
1 Olympic Support Equipment Presentation to HAC 29 April 2010.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
ATS EVALUATION PROGRAMMES. ATS EVALUATION PROGRAM AUTHORITY Vice President of Operations. Director Air Traffic Services.
Title 36pt Georgia Subtitle 24pt Georgia Italics Presentation Information Arial Narrow 24pt Survey of Aviation Emissions Management Measures Ted Milczarek.
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
NextGen Current System Primary Radar – Creates blip on Radar Screen Secondary Radar – Aircraft encodes identifier and telemetry data VHF Radio – Voice.
Survey of Traffic and Radar Controller Communication and Workload
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
NAV CANADA UPDATE Presentation to the ATAC AGM November 2010 Rudy Kellar Vice President Operations.
Lecture 3: Air Traffic Control Tower
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
ICC Copyright 2005 Ifield Computer Consultancy Ltd., Commercial in Confidence Ifield Computer Consultancy Limited Grapevine Texas November 2005 Delivering.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
2015 IFATCA regional meeting October 2015 Accra An Enabling Environment for Air Navigation Lindi-Lee Kirkman Manager Safety & Flight Operations Africa.
Human Factors Considerations in Future Oceanic Air Traffic Control System Architecture Margret Dora Ragnarsdottir, Hayley J. Davison, Hong Li, & R. John.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
William C. Withycombe March 14, 2012 Federal Aviation Administration Pacific Aviation Directors Workshop State of the FAA.
AVIATION WEATHER Presented by: John Staples, Director of Flight Service Program Operations October 13, 2004.
CPWG 16 NAV CANADA Update December 3-6,  Private, non-share capital company  2nd largest ANSP in the world  12 million aircraft movements annually.
How the NextGen Florida Test Bed could enable integration of Domestic and International Space Traffic airspace.
V. VSOMASUNDARAM, Board Member (Air Navigation Services), Airports Authority of India.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
NAV CANADA INSURANCE PRESENTATION
Aviation System Block Upgrades and NAV CANADA Planning
Workshop on preparations for ANConf/12 − ASBU methodology
QUALITY OF SERVICES IMPROVEMENT PROGRAMMES
Workshop on preparations for ANConf/12 − ASBU methodology
ATS EVALUATION PROGRAMMES
MGMT 203 Airports, Airspace, and Air Traffic Control Management
Unit-3 FLIGHT INFORMATION SYSTEMS
Workshop on preparations for ANConf/12 − ASBU methodology
Ground System implication for ASAS implementation
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Remote aerodrome advisory service (RAAS/remote afis)
Presentation transcript:

Requirement for PSR Primary Surveillance Radar PSR is normally associated with a Terminal Service PSR is currently located at 22 sites across Canada Commencing Aeronautical Study to review requirement for PSR at 5 locations: Prince George Regina Sault Ste Marie North Bay Gander Study will consider application of new technology Essentially, Primary Surveillance radar detects moving turbines and generates tracks on air traffic controllers displays. The radar processor assigns speeds to them and they display like an aircraft, tracking for a short while and then dropping off the screen. Over wind farms the result is a clutter like effect that can obscure or entirely block the tracks of aircraft overflying the area. This effect can occur if the wind farm is located within line of site, generally within 80 kms of the Primary Radar.

ADS-B Surveillance Hudson Bay Oceanic Hibernia/Sable Island/Yukon Operational in 2009 Over 600 aircraft now certified Oceanic Six sites on Northeast Coast (End Oct 2010) Four sites in Greenland (Early 2011) Hibernia/Sable Island/Yukon Under assessment

North Warning System ADS-B Integration Eastern portion of Canadian North Labrador coast and southern Baffin Island Brevort, Saglek, Cartwright Implemented at end of October 2010 Immediate benefits in Gander Domestic and Oceanic airspace Provides surveillance redundancy

ADS-B and RADAR 4

Multilateration (MLAT) Fort St John – now commissioned Vancouver Harbour planned for 1st QTR 2011 ATC application Montreal (PETIA) Airport surface surveillance installed Other potential sites: Kelowna/Penticton, Timmins, Sioux Lookout, Fredericton, Calgary Springbank, Vancouver Lower Mainland, Wabush, Abitibi West, Mont Tremblant

Video Surveillance Project Purchased controlling interest in Searidge Technologies Extensive testing of Searidge video technology underway Runway 4/22 – YOW Use of video to enhance airport surveillance, subject to stringent ANS requirements

Video Surveillance Project

Canadian Automated Air Traffic System (CAATS) Automated flight data processing CAATS now connects seven Area Control Centres: Substantial efficiencies: flight data transferred electronically as planes cross the country. Edmonton FIR Northern Airspace sectors the last to make the transition to CAATS – November

Canadian Automated Air Traffic System (CAATS) New CAATS features under development for near term (one-three years): Controller Pilot Data Link Automated Data Communication with external agencies (e.g. FAA, Iceland, etc.) Display of Airspace to Protect (ATP) Medium-Term Conflict Detection (MTCD)

Integrated Tower Automation Suite (INTAS) Integrated controller working position with up to four touch-screen monitors Includes NAV CANADA technology: Electronic Flight Data Strips Operational Information Display System monitors and controls airfield ground lighting, monitors navigational aids, and weather data; Digital-Automatic Terminal Information Service (D-ATIS) Terminal surveillance displays

CFPS Collaborative Flight Planning System (CFPS) Improvement to existing capability (2004) Better customer service Two way flow of flight plan information – file, change, delay, cancel) Simplified registration process Increased FIC efficiency Integration with FIMS and CAATS Centralization of data and services Phased Implementation VFR Flight Plans (Feb 2011) IFR Flight Plans (TBA)

International Recognition IATA - Best Air Navigation Service Provider 2010 Recognizes customer satisfaction, cost efficiency, continuous improvement Requires positive record in safety, social operational and environmental issues Recognizes effective customer consultation; transparency in sharing information; reasonable service charges; productivity improvements. JANE’S 2010 Environment Award ATC Global Award for Hudson Bay ADS-B deployment ”Green” Air Traffic Management concepts for reducing the impact of aviatin on the environment Estimated $195M in fuel and 547K metric tons of GHG emissions from 2009-16. Shared by NAV CANADA and SENSIS

Summary Continued compression on cost control Expansion of Surveillance coverage and development of new technology Improvements to the Navigation System Upgrades to aviation weather and flight planning AWOS, Weather Cameras, Centralized Flight Planning Service Progressive deployment of new capabilities to improve Air Traffic Management GAATS+, CAATS, INTAS, EXCDS, SASS,