MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September 2008 1 JWST Status.

Slides:



Advertisements
Similar presentations
Ray Lundquist, NASA GSFC
Advertisements

1 Ritva Keski-Kuha JWST Deputy OTE Manager May 19, 2009 JWST OTE Development Status JWST-PRES
Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
1 FGS Guider CDR – April 19, 2007 © Copyright 2007 Her Majesty the Queen in Right of Canada Subject to Controlled Goods Regulations of Canada FGS Guider.
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
KU Leuven MIRI team meeting
Introduction and Election of Co-Chair H. K. (Rama) Ramapriyan NASA/GSFC Metrics Planning and Reporting (MPAR) WG 8 th Earth Science Data Systems Working.
SuperDARN Workshop May 30 – June PI Report Mark Lester On behalf of the SuperDARN PIs.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
James Webb Space Telescope and its Instruments George Rieke (MIRI Expert) & Marcia Rieke (NIRCam Expert) Steward Observatory, University of Arizona The.
James Webb Space Telescope and its Instruments John Stansberry Steward Observatory, University of Arizona The First Light in the Universe: Discovering.
Olin 2011 Keith Gendreau. Project #1: Electron Optics for X-ray source GSFC has been building new “Modulated” X-ray sources for various uses including.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
A Preliminary Cycle 1 Calibration Plan for the JWST Science Instruments James Muzerolle.
MIRI software; implementation plan Peter Roelfsema.
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
IMPRS June Organigram of ESA, in the late 1980s
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
James Webb Space Telescope Integrated Science Instrument Module Status Jamie Dunn JWST/ISIM Manager JWST Partner’s Workshop May 19, 2009 JWST-PRES
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
Summary of the JWST Integrated Science Instrument Module (ISIM) and Structural/Thermal Subsystem Systems Requirements Reviews (SRRs) Jerry Kriss 04/15/2004.
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
James Webb Space Telescope (JWST) Project Status for the AAS Town Hall Phil Sabelhaus JWST Program Manager January 5, 2010.
Modern Universe Space Telescope Visions 2003 Proposal Dennis Ebbets Ball Aerospace UV Optical Space Telescope Workshop STScI February 26, 2004.
AAAC Presentation JWST Status Eric P. Smith JWST Program Scientist.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Oct.10, 2007EAMA7 The next-generation Infrared astronomy mission SPICA Outline of SPICA Scientific Research Concept (SciReC) SPICA 研究コンセプト概要 17 th May.
JWST Calibration mini-summit STScI June 13, 2008.
Coding the JWST Calibration Pipeline(s) 2010 Calibration Workshop Robert Jedrzejewski/STScI.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
May 18, 2004Ron Allen, STScI Lunch Talk1 Space Interferometry Mission (SIM) Update - May 2004 Ron Allen SIM Mission Scientist Space Telescope Science Institute.
Kailash C. Sahu NIRCam: Status Update 1m Cold, space-facing side
1 MIRI Hardware (from Oct-Dec NPM reports)‏ Fred Lahuis (NPM input from Rieks Jager)‏ SRON MIRI NL Meeting Leiden, 6 th January 2010.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Hubble Science Briefing
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
The INS NIRCam Team.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Qatar Comprehensive Educational Assessment (QCEA) 2008: Discussion Session For QCEA Support.
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Deploying JWST Bob Giampaoli JWST Chief Systems Engineer Northrop Grumman.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002.
INFSO-RI Enabling Grids for E-sciencE EGEE Contributions to e-Infrastructure policy work Matti Heikkurinen, NA5 leader, CERN EGEE.
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
JWST Science Policy & Science Parallels
Single Object & Time Series Spectroscopy with JWST NIRCam
Capitalization style for Presentation Title is “Title Case”
James Webb Space Telescope
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Status

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Mission Status Across the whole observatory there is now -A lot of FM hardware in production -Many good test results at observatory subassembly level (the other instruments, mirror backplane, ISIM structure.....) -Some not so good test results and “issues in work” -So much like us Overall schedule to launch date is still being held -Test programme is starting to stabilise Following successful Non-Advocate Review NASA is fully committed to JWST -There is now a very large team at both GSFC and NGST -Peak years of engineering effort and cost are now and next year !. First Flight Mirrors are about to start testing (after polishing)

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September Technical Areas Currently Getting a Lot of Attention Sunshade deployment -A special review is planned to ensure problems have been solved (tightness of edges of sunshade affect efficiency) Alignment of instruments to the (ISIM and) telescope and of telescope itself -A lot of work in this area, extremely tight tolerances (microns over meters) -Detailed review of OGSE about to start. -MIRI pupil lens will be used in for in-flight measurement of pupil shear to eliminate a possible redundancy in the alignment algorithms Cooler Heat Loads Margins -End to end review of current margin in all areas Electrical Power budget for mission - more power to the Cooler ;-) (among many changes) Test Plans and Verification at Observatory Level Really big focus across the board on pushing every schedule in order to get the Observatory (FM) into end-end cryo-test as soon as possible.

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September Operations Progress and Planning (wrt MIRI) MIRI Proposal Planning System Template Definitions -Draft specifications are in work Cross Instrument Calibration Working Group Set up -Karl Gordon is MIRI member, looking for commonalities between instruments (dark current subtraction). Operations Script Development is making good progress -Plan to test at RAL at the end of VM2

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September JWST Science Working Group Activities A specialist working group has been set up to consider how we can best observe planetary transits -Identify if special observatory modes are needed. A study is on-going to write a paper explaining the impact to science if the telescope image quality specification were to be relaxed (eg diffraction limited at 3um) -Very bad impacts for NIRCAM and NIRSPEC sensitivity -At the moment this is a “just in case” activity -In case the mirror cryo-polish cycles are too difficult (impossible) -There is no mission plan to actually do this. Plan is to make a serious announcement to community of process for selecting first observations at the AAS meeting in January 2009.

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September Partners Workshop

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September Partners Workshop, ITAR Free Day, Monday 13 th October Hosted by NIRSPEC in Munich, 9am- 5:30pm Program Progress & Status (Durning) JWST Science Objectives (Greenhouse) JWST Mission Overview, Observatory Overview and Mission PDR Summary (Menzel & Arenberg) OTE and Mirror Status (Feinberg & Texter) ISIM Overview (Dunn) LUNCH ISIM Electronics Compartment (Rashford) Instrument Status : NIRCAM, NIRSPEC, FGS-TF, MIRI, Cooler Observatory Verification (Lynch & Arenberg) Integration and Launch Campaign Flow (Diaz & Jones) Ground Segment & Operations(Johns & Sonneborn) Public Lecture in Deutsches Museum, and full scale model viewing in evening We need to get GSFC a list of MIRI participants by end of this week

MIRI EC Meeting C/D13, Dublin, 17 th to 19 th September Other Sessions of Interest to MIRI MIRI Science Team Meeting, Tuesday Morning -Co-PI splinter will discuss Wed, 15 th Mostly ITAR restricted technical discussions -Variouis Optical Alignment and Test working groups -Martyn, Maurice, will be there see also Martyns talk -Science Instrument Coordination with Observatory V&V team -PIs have been invited, likely to be followed by working groups and telecons -Cooler Heat Load Margins -Paul will be there, (& ESA) see also in Bryans talk -Various management discussions -SITS spares for FM testing for example Thurs, 16 th - more ITAR ! -ISIM Integration and Test, and in particular Operations products and Data storage during test -We want STScI archive in place and useable in time !!!!