What I figured out up to now PP-100928-a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 1.

Slides:



Advertisements
Similar presentations
WP CO Status and Progress December 8th, 2010 Johannes Gutleber PR a-JGU, December 8th, 2010 J. Gutleber 1 R. Gutleber.
Advertisements

02/10/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Electrical Design Project Presentation.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Logic-level outputs can’t drive a motor directly. Solution: Relays –Relays allow one circuit to switch a second circuit –isolates circuit from potentially.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Electro-Pneumatics Module 1
SCADA and Telemetry Presented By:.
Budget Summary Linac-4 Instrumentation review CERN, Uli Raich BE/BI.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
CCC Meeting Cryogenic Current Comparator in the FAIR Project Overview of FAIR / current status Beam diagnostics work package Tasks and installation locations.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
Power Plant Construction and QA/QC Section 5.4 – Key Systems and Components Engineering Technology Division.
© The McGraw-Hill Companies, Inc McGraw-Hill 1 PRINCIPLES AND APPLICATIONS OF ELECTRICAL ENGINEERING THIRD EDITION G I O R G I O R I Z Z O N I 18.
WP CO Column Status and Progress October 7th, 2010 Johannes Gutleber PR a-JGU, October 7th, 2010 J. Gutleber 1 R. Gutleber.
ProShell Procedure Framework Status MedAustron Control System Week 1 March 28 th, 2011 Roland Moser PR a-RMO, March 28th, 2011 Roland Moser 1 R.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Beam diagnostics in the beamlines
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
PR a-JGU, October 9th, 2011 J. Gutleber 1 MedAustron PXI Systems at CERN Johannes Gutleber Roland Moser.
USR Beam Instrumentation Janusz Harasimowicz Joint QUASAR and THz Group Workshop on Accelerator.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
Biomechanical Tissue Stimulator Group 1: Matt Brady (BME/EE) Ankeet Choxi (BME) Misha Kotov (CS) Steven Manuel (ME) Adviser: Dr. V. Prasad Shastri.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
CERN, 29.January 2009Uli Raich AB/BI 3 MeV instrumentation commissioning U. Raich Linac-4 Beam Coordination Committee
FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
Summary: Working Group on Instrumentation Wim Blokland ORNL / SNS Manfred Wendt Fermilab 11/22/2008Summary: Project X Instrumentation WG 1.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Hall B Gas System Controls Physics Detector Support Group.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Fluid Power Control.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ESS Beam Diagnostics Overview Andreas Jansson / BI Group Beam Diagnostics Mini-workshop
ESS Front End diagnostic
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Beam diagnostics from GSI
Experience with beam instrumentation at Linac4
BE-BI Software for LINAC4
LINAC 4 source & LEBT measurement results
6th BINP-GSI-FAIR workshop
LINAC4 LEBT beam size and emittance diagnostics
Control System Summary of Changes Since PDR
Considerations on Beam Diagnostics Physics
IT 318: M5 Motors: Questions IT M6.
THREE-PHASE INVERTERS
Ion Source and LEBT control system topology, Interlock strategy
"Research and Development in Beam Diagnostics"
High Level Physics Applications for LCLS Commissioning
ISRC and LEBT Vacuum System Design
MEBT FC, WS, SC and EMU Status
Linac Diagnostics Commissioning Experience
Ion Source and LEBT Beam Diagnostics
Safety Readiness Review (SRR) Thomas Hansson, ESH
Presentation transcript:

What I figured out up to now PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 1

Contents Introduction Professional background BD Overview BD in the LEBT Monitors Measurements Outlook Summary PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 2

Introduction Anton Kerschbaum From Vienna, Austria With MedAustron/BD since 1 st September 2010 Responsibilities in BD group Controls Data acquisition, -conditioning and -presentation Interfacing with MACS Professional Background HTL Wien 10 for electrical engineering Electrical engineering at TU Wien (Bachelor level) Six years experience in DAQ and controls with LabVIEW PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 3

BD Overview PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 4 Monitor typeLEBTRFQ + LINACMEBTSynchrotronHEBT Faraday Cups ✕✕ Slit Plates ✕✕ Wire Scanners ✕ Faraday Cup Cylindrical ✕ AC Current Transformers ✕✕✕✕ DC Current Transformers ✕ Profile/Harp Grids ✕✕ Position Pickups ✕✕ Phase Pickups ✕✕ Schottky Pickups ✕ Residual Gas Profile Monitor ✕ Diamond Detector ✕ Luminescent Screens ✕ Qualification Monitor ✕ Scintillating Fiber Hodoscopes ✕

BD in the LEBT – Monitor Types Classification of BD monitors By measured variable By measurement principle … By motion system PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 5 LEBT Actuated electricallyActuated pneumaticallyNo motion system SlitsFaraday CupsCurrent Transformers Wire ScannersProfile grids (harp grids)Faraday Cup Cylindrical

BD in the LEBT – Monitor Types Actuated electrically: Brushless motion system Actuated pneumatically: Pneumatic motion system PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 6 ComponentBrushlessPneumatic ControlPXI w/ Motion ControllerPXI w/ Relay Card ConditioningCustom Interface + SafetyCustom Safety System AmplificationMitsubishi Motor DriverFesto Solenoid Valve ActuationMitsubishi Brushless MotorFesto/Norgren Piston

BD in the LEBT – Measurements MeasurementSlitsWire ScannerFaraday CupProfile Grid Beam position ✕✕ Beam intensity ✕ Beam profile ✕✕ Emittance ✕✕ PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 7 Different measurements and methods For LEBT Beam position Beam intensity Beam profile Emittance

Outlook I Until next MACS week in December Get acquainted with FECOS framework Implementation of motion control Using FECOS framework Timings acquired locally Foresee transition to global timings Focus on ITS in Mid 2011 Creation of BD Motion Test Stand (MTS) Definition of interfaces to Tier 3 Together with CO group PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 8

Outlook II BD MTS Easy access to motion control Basis for quick deployment of test routines Rudimentary DAQ ITS Local timing system Local interlock system Procedures (emittance measurement) Custom DAQ with local GUI Development using FECOS framework PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 9

References F. Osmic: Beam Diagnostics and Instrumentation; PP a-FOS E. Sargsyan: MedAustron Injector Test Stand; PP a-ESA PP a-AKE_MACS_week_BDC_intro.pptm A. Kerschbaum BD controls MACS week 10