Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’

Similar presentations


Presentation on theme: "Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’"— Presentation transcript:

1 Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’ + 5’) IV.Thermo-mechanical analysis – M. Delonca (25’ + 5’) V.BREAK (15’) V.Conceptual and detailed design – M. Fürtinger (25’ + 5’) VI.Controls for movable BIDs – R. Folch (10’ + 5’) VII.Manufacturing strategy – R. Folch (15’) VIII.Discussion – All (15’) I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’ + 5’) IV.Thermo-mechanical analysis – M. Delonca (25’ + 5’) V.BREAK (15’) V.Conceptual and detailed design – M. Fürtinger (25’ + 5’) VI.Controls for movable BIDs – R. Folch (10’ + 5’) VII.Manufacturing strategy – R. Folch (15’) VIII.Discussion – All (15’) 15.03.12 1R. Folch EN/STI - BID Workpackage Review - March 2012 End 12:00 https://indico.cern.ch/conferenceDisplay.py?confId=181008

2 VI. Controls for the movable BIDs 15.03.12 R. Folch EN/STI - BID Workpackage Review - March 20122 Devices concerned – Scrapers (beam shaping and diagnostic) – MEBT dump and Beam stoppers (safety relevant) Work status Define the limit of scope of the workpackage Define the actuating systems and FE electronics Create the Xml files for BIS controls Define the controls and cabling schemes Define the size and location of the patch panels

3 Master Layout MA-00492-a-THA-V1.1 MEBT Dump Scraper horizontal Beam Stopper (4x) Scraper vertical

4 Control scheme for the scrapers Conection box 2 x Scraper Vertical (MR-0011-SCV-A) 2 x Scraper Horizontal (MR-008-SCH-A) < 10 m Electrical actuator (Brushless motor) DC supply & Encoder Main control rack WP limit BID BD Intermediate control rack 10-30 m BD? 15.03.12 R. Folch EN/STI - BID Workpackage Review - March 20124

5 Risk of radiation on scrapers drivers? 15.03.12 R. Folch EN/STI - BID Workpackage Review - March 20125 CERN uses stepping motors with radiation hard resolvers, and has no data on the radiation sensitivity of the opto-encoders of the brushless motors CNAO uses brushless motors and does not consider radiation effects as a critical issue (no failure expected < 10Gy) MedAustron simulations for the ionizing dose rate < 0.1 Gy/y (scrapers losses not considered) MedAustron decision: – OK for brushless motors for scrapers – Design for easy replacing of the driving in case of failure

6 Beam interlock interface design Applicable to safety related devices – Beam stoppers (BST) – MEBT dump (BDM) Reference document 15.03.12 R. Folch EN/STI - BID Workpackage Review - March 20126

7 Definitions, channels, specifications 15.03.12 R. Folch EN/STI - BID Workpackage Review - March 20127 ES-100107-a-MMA v.1.3

8 Beam Interlock System signals for the beam stoppers and the MEBT dump 04.10.11 R. Folch EN/STI - MACS Week - October 201108.20118 BST BDM

9 XML files for the Interlock Control The XML files for the 4 beam stoppers and the MEBT dump are completed and uploaded on SVN according to WP CO procedure 15.03.12 9

10 Control scheme for the BST and the BDM Compressed air supply Pressure regulator Electro -valve Pressure sensor Pneumatic cylinder v Beam Interlock System rack BID patch panel Beam Intercepting Device 1 x MEBT Dump (ME-00-000-BDM-A) 4 x Beam Stoppers (Tn-00-000-BST-A) n = 1, 2, 3, 4 1-3 m 10-30 m WP limit BID CO Pressure sensor (to CR?) - IN (out of beam) - OUT (BID is out of beam) - OUTR (wired to CR for redundancy) - Veto (in beam, ignore -IN) OUT (BID is in the beam) OUTR (wired to CR for redundancy) (free) Cable NEA 18 (free) K PLC 15.03.12 R. Folch E/STI - BID Workpackage Review - March 201210

11 Cables routing and patch panel 15.03.12 R. Folch EN/STI - BID Workpackage Review - March 201211 Proposal from D. Grenier based on Linac 4 design

12 Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’ + 5’) IV.Thermo-mechanical analysis – M. Delonca (25’ + 5’) V.BREAK (15’) V.Conceptual and detailed design – M. Fürtinger (25’ + 5’) VI.Controls for movable BIDs – R. Folch (10’ + 5’) VII.Manufacturing strategy – R. Folch (15’) VIII.Discussion – All (15’) I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’ + 5’) IV.Thermo-mechanical analysis – M. Delonca (25’ + 5’) V.BREAK (15’) V.Conceptual and detailed design – M. Fürtinger (25’ + 5’) VI.Controls for movable BIDs – R. Folch (10’ + 5’) VII.Manufacturing strategy – R. Folch (15’) VIII.Discussion – All (15’) 15.03.12 12R. Folch EN/STI - BID Workpackage Review - March 2012 End 12:00 https://indico.cern.ch/conferenceDisplay.py?confId=181008


Download ppt "Agenda I.Workpackage overview – R. Folch (25’ + 5’) II.Functional requirements of the BIDs – R. Folch (5’ + 5’) III.FLUKA simulations - A. Christov (15’"