Presentation for IST-2000-28162 25.June. 02 Brian Foley, TecNet, Ireland Page 1 Introduction TEAMwork TEAMwork Project (IST-2000-28162)

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

EU-Certificates Association: Introducing EQN Project of EU Leonardo da Vinci Programme A.Soloviev (EDNES/GC RAS, Russia), R.Messnarz (Coordinator, ISCN,
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Leonardo da Vinci – Transfer of Innovation Project - PIECES Pathways into Employment in the Care and Tourism Sectors.
CIRAS PROJECT OVERVIEW
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
D ET N ORSKE V ERITAS DNV - 01/06/ Project Progress between review meeting #2 and #3 Peik Jenssen Copenhagen 25 May 2000.
Collaboration with European Union Programme EU Partners, projects EU-newly associated and CIS countries STACCIS TAP UNESCO, EDNES Armenia, Azerbaijan,
Understand European Energy Supply Security Management Co-ordinators UNDER way towards STANDard indicators for continuous VET A short summary.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Headquaters Kick-Off Meeting Brussels 17 January 2013 Aware and Resilient Project overview – Austrian Red Cross.
Estonian experience in Horizon 2020 Ülle Must
AWARE PROJECT – AGEING WORKFORCE TOWARDS AN ACTIVE RETIREMENT Alberto Ferreras-Remesal Institute of Biomechanics of Valencia IFA 2012 – Prague – May 31th.
SOCRATES PROGRAMME OnLineMath&Sciences Project Results by 31 January 2007 and Planning October 2005 – September 2007.
Geoff Payne ARROW Project Manager 1 April Genesis Monash University information management perspective Desire to integrate initiatives such as electronic.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
Cultural Heritage in REGional NETworks REGNET Objectives and Progress (D15)
TENCompetence: The European Network for Competence Development Chris Kew CETIS April
Component Based Software Engineering IST Eva Feuer MTA SZTAKI Infoday 2nd of April 2003.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
InWEnt | Qualified to shape the future1 Internet based Human Resource Development Management Platform Human Resource Development Programme in Natural Disaster.
DEMOCRACY, CITIES AND DRUGS II Thematic Platforms Presentation Young wanderers and drugs Presentation ANIT is the French federation of health centres and.
E-CMMERCE JOBS This project (Project number: HU/01/B/F/PP ) is carried out with the financial support of the Commssion of the European Communities.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Presentation for IST October, 2002 Brian Foley, TecNet, Ireland Page 1 Introduction TEAMwork Introduction to TEAMwork.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
NET-SHARE Kick-off meeting Matosinhos, Portugal April 15 h 2008 ICT Policy Support Programme (ICT PSP) WPs and ACTION POINTS.
BA-DEGREE PROGRAMME: BANKING AND INSURANCE INDUSTRY UNIVERSITY OF APPLIED SCIENCES Welcome to: KICK-OFF MEETING GRAZ Financial Education Levering the Implementation.
Entrepreneurial Competences for School Leadership Teams Newcastle 6 th October 2014.
The Age-Friendly City (TAFCITY) Meeting 2 Budapest May 2012 WELCOME.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
P2V Peer to Peer networking for Valorisation Copenhagen February 2007.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
Introduction of the ‘SDI-EDU for regional and urban planning‘ project Karel JANECKA 1 1 University of West Bohemia, Faculty of Applied Sciences Department.
ORGANIC IST4Balt Seminar, Vilnius, 22 October 2004 The project is funded by the EU under the Leonardo da Vinci programme: A/03/B/F/PP ORGANIC –
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
EVA Workshop, 26 March 2003, Florence, Italy1 COINE Cultural Objects In Networked Environments Anthi Baliou University of Macedonia,Library Thessaloniki,
Free Powerpoint Templates Page 1 Free Powerpoint Templates FP7 – Secure Enterprise Remote Banking System (SERBS) Small or medium scale focused research.
Welcome Introductions Plans for the day Key milestones progress Agree final standards Participate in & evaluate activities Understand financial requirements.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
Progress Meeting WP4 status review Teleconference with GMV, GSA Konstandinos Diamandouros 16/12/2010 GNSS for INnovative road Applications.
Web-based and Mobile Solutions for Collaborative Work Environment with Logistics and Maritime Applications Contract No
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
State Agency for Information Technology and Communications “High Added Value Soft Actions Facilitating Participation of NMS & ACC and INCO Organisations.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Evaluation.
MTA SZTAKI For furthur information please contact: Éva Feuer Head of Quality Management Head of IST liaison office
Michel Van Hoegaerden Programme Manager EU Expert Group 16/11/10, Brussels Joint Action on Health Workforce Planning and Forecasting STATUS BRIEFING.
GINA WP4.2 Business and Exploitation Plan March 10 th 2010 Lisbon GNSS for INnovative Road Applications.
IDENTIFICATION OF INNOVATIVE APPROACHES TO AAS. Dan Kisauzi 20 th June 2013 Dolphine Suites Kampala, Uganda.
M253 Students Study Guide Mrs. Fatheya Al Mubarak – AOU Dammam.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
Kick Off Meeting Largs, Scotland
WP9: Dissemination and Exploitation
WP8: Demonstrators (UniCam – Regione Marche)
DataGrid Quality Assurance
Modernization Maturity Model and Roadmap
Partnership on Urban Mobility (PUM) Orientation Paper
First Partners’ Meeting
Kickoff Presentation Date of Presentation Presenter Name
DIME Plenary Thomas Burg –Statistics Austria
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
European Innovation Platform for Knowledge Intensive Services Elke Van Tendeloo DG Enterprise and Industry Brussels, 04 June 2007.
Assessment of Quality in Statistics GLOBAL ASSESSMENTS, PEER REVIEWS AND SECTOR REVIEWS IN THE ENLARGEMENT AND ENP COUNTRIES Mirela Kadic, Project Manager.
ITDG meeting of of October 2011
ESS.VIP ADMIN EssNet on Quality in Multi-source Statistics, progress report 19TH WORKING GROUP ON QUALITY IN STATISTICS, 6 December 2016 Fabrice Gras,
Jobs and Skills in the Local Economy
Presentation transcript:

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 1 Introduction TEAMwork TEAMwork Project (IST ) Welcome to Review Meeting 25 June 2002, Valladolid, Spain Brian Foley Co-ordinator TEAMwork Project (IST )

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 2 Introduction TEAMwork Structure of Presentation Presentation of meeting agenda Introduction to TEAMwork project and partners Overview of progress since 1 July, 2001 Future work

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 3 Introduction TEAMwork AGENDA 1.Presentation on the overall project progress (TecNet) (20’) 2.Presentation on Deliverable: D.2 - Methodology (ISCN) (15’) 3.Presentation on Deliverable: D.3 - Technology (ISCN) (15’) 4.Demonstration of configured NQA (ISCN) (15’) 5.Private meeting for Reviewers (30’)

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 4 Introduction TEAMwork AGENDA (Continued) 6.Presentation on the Validation and Evaluation (WP4) plan (FGUVA) (15’) 7.Presentation on the planned social analysis (MTA SZTAKI) (15’) 8. Presentation on the organisation of the trials (WP4): 8.1 Software Engineering QinetiQ and GMV (20’) 8.2 Public Service Organisation FGUVA and APS (20’) 8.3 Research Network Domain TecNet (15') 9. Private meeting for Reviewers (30’)

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 5 Introduction TEAMwork Introduction to TEAMwork The Objectives Integration of three innovative approaches into a ‘complete’ solution Application in three e-working domains Role-based team-working methodology for effective management and motivation of e-working teams Technology platform – Adaptable and Configurable for effective ‘virtual’ decision-making Social skills analysis of user behaviour - develop a skills solution

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 6 Introduction TEAMwork Introduction to TEAMwork The Methodology A Methodology to improve the efficiency and effectiveness of organisations by Goal Analysis Efficient Team-Work Improved Infrastructure Aiming at a Continuous Learning Process and Organisation.

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 7 Introduction TEAMwork Introduction to TEAMwork The Technology Web-Server (Hyperwave) (ISCN Partners) Public Service Organisations Research Networks NQA Application Software Knowledge Management Software Engineering A Platform Adaptable and Configurable without Change of Code

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 8 Introduction TEAMwork Introduction to TEAMwork The Social Dimension Identify required skills, based on user behaviour and analysis: - Social skills - Communication skills Cultural Differences Conflict Resolution Group Dynamics

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 9 Introduction TEAMwork Introduction to TEAMwork The Project Structure Integrate Technology + Methodology + Skills Solution Adapt Trials in three e-working environments Configurable Feedback Dissemination Exploitation

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 10 Introduction TEAMwork Introduction to TEAMwork The Project Partnership Provider / Support Team ISCN (Irl.) Hyperwave (D) User Domains Software Engineering - GMV (E) - QinetiQ (UK) Public Service - FGUVA (E) - APS (A) Research Networks - TecNet + IOT’s (Irl.) - Danube (A) - University of Maribor (Slo) Support Social Analysis Team MTA SZTAKI (HU) BisDato (A) Feedback

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 11 Introduction TEAMwork Introduction to TEAMwork Project Management Structure Management Structure based on system of Contractors and Members ISCN TecNet FGUVA MTA SZTAKI University of Maribor Danube QinetiQ GMV APS Bisdato Hyperwave

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 12 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) Workpackage Description WP1 Project Management WP2 Teamwork Analysis WP3 NQA Installation and Adaptation WP4 Validation and Evaluation WP5 Verification and Refinements WP6 Dissemination WP7 Exploitation WP8 Peer Review and Assessment

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 13 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP1 (Project Management) –Successful kick-off meeting –Agreement on project planning –Templates for managing the project developed –NQA configured for project management (overall project planning, work package planning, effort reporting) –Partners reporting effort using NQA since October, 2001 –Quarterly reports and Periodic Progress Report submitted to PO on NQA

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 14 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP2 (Teamwork Analysis using Bestregit ) –WP Plan produced –Bestregit Training completed for all partners –Analysis of scenarios in domains: Software Engineering Public Service Organisation Research Networks –Synergies between scenarios identified and exploited –Sub-deliverables integrated into Deliverable 2 –Submitted to PO on 14 December, 2001 using NQA

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 15 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP3 (NQA installation and configuration) – Four servers successfully installed – Configured with all scenarios – Training programme for Users, Quality Manager and Administrator undertaken in January 2002 – D.3 produced with training materials – Scenario-specific training offered to users

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 16 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP4 (Validation and Evaluation –WP Plan produced –Trials organised in three domains –Questionnaires finalised –Evaluation of Methodology, Technology, Social and Cultural factors –End-users trained and ‘ready to go’ –Trials in RND started in June

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 17 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP5 Verification and Refinements –Work has started already –Early feedback from users in Graz –Specification document provided to Hyperwave –Additional refinement after WP4 is complete –Methodology refinement taking account of differences between D.2 and D.3

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 18 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP6 (Dissemination) –WP Plan produced –Project Website developed ( –Details of project disseminated widely –Concertation meetings Brussels (June 2001 and 2002) –Presentation at EuroSPI 2001 –Presentation to IRC network –Presentation at e2001 Venice –Presentation at IST WISTCIS meeting –Presentation at Baltic IT&T conference, TELEBALT Forum –TII annual conference, Turin. –Papers submitted to conferences and publications –Support of EU acknowledged

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 19 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP7 (Exploitation) –Discussion document prepared and discussed by partners –Work package plan produced –Draft Exploitation Plan being developed - Contact with other projects – clusters and Expressions of Interest in FP6

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 20 Introduction TEAMwork Progress Highlights (July 2001 – June 2002) WP8 (Peer Review and Assessment) –Nominations received from all Partners for Peer Assessment Team –Chairman of Peer Assessment Team briefed on Project Progress in January, 2002 –Report and non conformance reports completed –Partners are currently demonstrating NQA and briefing Peer Assessors –Next Peer Assessment report to be completed in July / August

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 21 Introduction TEAMwork Future Work July – December, 2002 Undertake Trials in July, August and September Capture end-user evaluations through questionnaires and interview (methodology, technology and social analysis) Write domain-specific reports Analyse social and cultural differences Produce D.4 Verify and Refine (WP5) Continue Dissemination activities (WP6) Develop Exploitation Plan (WP7) Continue Peer Review and Assessment (WP8)

Presentation for IST June. 02 Brian Foley, TecNet, Ireland Page 22 Introduction TEAMwork TEAMwork IST Thank you for your attention!