Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Grade Separation Alternative
BRINGING MOBILITY TO CONTRA COSTA COUNTY PRESENTATION TO THE CONTRA COSTA COUNTY BOARD OF SUPERVISORS APRIL 16, 2013 Randell H. Iwasaki Executive Director.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract E4 March 12, 2003.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
Fill in Agency Name on Master
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director.
Steve Heminger Executive Director Metropolitan Transportation Commission Greater Vancouver’s Livability Forum June 1, 2009 TOLL: The Four Letter Word of.
Titusville to Edgewater Bike Loop PD&E Study
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
SFOBB East Span Seismic Safety Project Sarah Picker Duty Senior Toll Bridge Program, Caltrans.
Bridge Toll Increase for Transit Senate Select Committee June 3, 2002.
Current Construction Projects Major Projects Pinellas County.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
IBTTA April 19, 2009 Bay Area Toll Authority San Francisco-Oakland Bay Bridge East Span Seismic Replacement Project.
IMN’s Fourth Annual California Municipal Finance Conference IMN’s Fourth Annual California Municipal Finance Conference April 3, 2006 Steve Heminger Executive.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Constructability Workshop Nov. 20, 2002 In Bay.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
Gerord Neil Jr Joel Villalobos Period 4 Arch. Design.
Achievements & Challenges Contra Costa County Transportation Town Hall May 25,2006 Bay Area Transportation:
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Metropolitan Transportation Commission & Bay Area Toll Authority January 19, 2006 Steve Heminger Executive Director Metropolitan Transportation Commission.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-bid Meeting February 5, 2003.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Bay Area Toll Bridges By: Rachel Sanders and Zeltzin Lucas.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Outreach January 7 & 8, 2003.
Metro Highway Program Presentation to CMAA Abdollah Ansari
1 Caltrans District 4 - ABAG Workshop - INFRASTRUCTURE INTERDEPENDENCIES January 31, 2012 California Department of Transportation (Caltrans) www. dot.ca.gov.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
1 City Council Work Session September 24, 2012 State of Transportation in San Leandro.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
MnDOT PROJECT UPDATE Trunk Highway 169 Improvements Fall 2016 – Fall 2017 Mayor & Council Members - Thank you for giving us this opportunity to give.
Interstate 15 North Phase 4
Project Purpose and Objective
Molly Kline, Project Manager
New Bridge Construction
Kerr Tar Project Update – June 2016
US26: Cornelius Pass Rd -185th Ave
Highway 169 Bridge Replacement & Pavement Resurfacing
North Main Street Intersection Improvements at Route 460 Bypass
Upcoming Major Projects Nevada Transportation Conference April 9, 2013
Contract 60X10 Informational Meeting Weber I-55
Unified Corridor Study Draft Investment Study
Monterey County Project Report for Measure X Expenditures
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Caltrans District 4 Contractors’ Outreach Meeting August 31, 2005

Caltrans District 4 Introductions Janet Adams SFOBB East Span Project Manager, Caltrans

Caltrans District 4 Welcome Bijan Sartipi District 4 Director, Caltrans

Caltrans District 4 Welcome Olivia Fonseca Deputy Director Civil Rights Program and Small Business Advocate

Caltrans District 4 SFOBB Self-Anchored Suspension Span Contract Janet Adams SFOBB East Span Project Manager, Caltrans

Caltrans District 4 San Francisco - Oakland Bay Bridge East Span Seismic Safety Replacement Project

Caltrans District 4 Contract F4 This contract constructs the self-anchored suspension portion of the new East Span Advertised on 8/1/05 Bids open on 2/1/06 Estimated cost is $1,450,000,000 Project funded by Toll revenues and State funds, therefore Buy America is not required Contract duration is 2130 working days (7 days/week)

Caltrans District 4 Contract F4 Contract consists of the following components: –Two steel orthotropic box girders and decks –Steel tower consisting of 4 tower shafts with elevator –Concrete cap beam at Piers W2 and E2 –Steel bike path –Steel prefabricated parallel wire strand cable system – All steel fabrication will be off-site

Caltrans District 4 Self-Anchored Suspension Span

Caltrans District 4 SAS and Skyway

Caltrans District 4 View from Yerba Buena Island

Caltrans District 4 District Contracts Bob Finney Deputy District Director - Construction

Caltrans District 4 Fiscal Year Construction Workload ($1000s)

Caltrans District 4 North Counties Upcoming Projects Son 101 HOV SR 12 – Steele Ln SON 101 Steele Ln IC Mrn 101 HOV Central San Rafael 580 Mrn 580 RSR - Polyester Deck Overlay Napa 29 - St Helena Roadway Rehabilitation Mrn 101 Blithedale Off-Ramp Napa 121 – Replace Tulucay Bridge

Caltrans District 4 Richmond San Rafael Bridge Polyester Deck Overlay Complete Bridge Deck Overlay, Deck joint Cost: $18.6 M Adv: Dec. 2005

Caltrans District 4 Marin 101 HOV Gap Closure Central San Rafael Mrn 101 HOV Widening Central San Rafael Cost $42.5 M Adv: Oct. 2005

Caltrans District 4 East Blithedale Off Ramp N U1 Mrn 101 E. Blithedale Off Ramp Cost $5.8 M Adv: Feb. 2006

Caltrans District 4 Napa 29 St. Helena Roadway Rehabilitation Napa 29 Pavement Rehabilitation Cost: $4.7 M Adv: Sept Rehabilitate Roadway : Curve Improvements Super elevation Correction Shoulder Widening Drainage Modification Digout and AC Overlay N 29 St Helena Project Limit – York Creek Bridge Project Limit – Bale Lane

Caltrans District 4 Sonoma 101 HOV Widening Route 12 - Steele Lane Son 101 HOV Route 12 to Steele Lane Cost: $52.1 M Adv: Sept N Route 12 / 101 I/C Ramp Modification College Ave. Bridge Replacement and I/C Modification 6 th Street New Undercrossing 4 th Street Bridge Widening Santa Rosa Creek Replace Bridge Soundwall Route 101 Widening Bicentennial Way - Earle Street OC Auxiliary Lane - Steele Lane - College Avenue Santa Rosa

Caltrans District 4 Sonoma 101 HOV Widening Steele Lane IC Son 101 HOV Steele Lane I/C Cost: $12.4 M Adv: Sept Route 101 Widening Cleveland - Edwards Avenue Steele Lane Bridge Widening Steele Lane NB On Ramp Metering Steele Lane Off Ramp Relocation Soundwall 101 N Santa Rosa N

Caltrans District 4 San Francisco, San Mateo and Santa Clara Counties Projects Devil’s Slide Tunnels SCl 680 Median Barrier SM 101 Auxiliary Lane SCl 101 Grind PCC Pavement SF 101 Presidio Viaduct SF 80 SFOBB Resurface Upper & Lower Deck

Caltrans District U1 – Overlay SFOBB Upper/Lower Deck 0105U4 SFOBB Resurface Upper and Lower Deck Cost: $25.0 Million Adv: 8/29/05 Resurface SFOBB : ¾” Polyester Deck Overlay Grind ¾” Existing Epoxy Asphalt Lower Deck - Replace 9 Expansion Joints Project Limits – YBI N 80 Project Limits – SFO SFOBB Anchorage

Caltrans District 4 SF Presidio Viaduct Rehabilitation and Repaint Rehab and Paint Presidio Viaduct Cost: $19.6 Million Adv: Dec. 2005

Caltrans District 4 SM 101 Auxiliary Lanes Auxiliary Lanes : NB and SB Auxiliary Lanes Reconstruct Peninsula OC Monte Diablo Ped. Bike OC Soundwall and Retaining Wall Drainage Improvements Project Limits – Millbrae Avenue Project Limits – E 3 rd Avenue N SM 101 Auxiliary Lanes 3rd Ave – Millbrae Ave. Cost: $74.2 M Adv: June. 2006

Caltrans District 4 Devil’s Slide Tunnels and Approach Roads 1123U1 Devil Slide – Construct Tunnels Cost: $225.0 Million Adv: Apr North Portal Bridge South Portal South Rock Cut New Roadway Tunnels Operation Maintenance Center N

Caltrans District 4 0C890 SCL 101 Grind PCC Pavement 0C8901 SCl 101 Grind PCC Pavement Cost: $19.9 M Adv: 8/15/05 Grind PCC Pavement : Grind PCC Pavement Slab Replacement AC Overlay Mainline & Ramps Fog Seal Shoulders Project Limits – San Mateo County Line Project Limits – Quadalupe River Bridge N

Caltrans District 4 SCl 680 Upgrade Median Barrier SCl 680 Upgrade Median Barrier Cost: $13.7 M Adv: Sept Upgrade Median Barrier : Replace MBGR w/ Concrete Barriers Minor Drainage Modifications Project Limits – Alameda County Line Project Limits – I 280 / 101 IC N

Caltrans District 4 Contra Costa County Upcoming projects Richmond San Rafael Bridge Benicia Martinez Bridge Antioch Bridge Carquinez Bridge CC 680 Auxiliary Lanes CC 80 Westbound HOV Lanes

Caltrans District 4 I 80 WB HOV Extension CC4 - Cummings Skyway I 80 Widening I/C Modification Auxiliary Lanes I/C Modification CC 80 Extend WB HOV SR4 - Cummings Cost: $19 M Adv: Oct. 2005

Caltrans District 4 Construct Auxiliary Lanes Diablo Road - Bollinger Canyon Road CC 680 Construct Auxiliary Lanes Cost: $15.2 M Adv: Nov Construct Auxiliary Lanes: NB And SB Auxiliary Lanes Relocate Existing Soundwalls Widening Laurel Drive UC Retaining Walls N Project Limits – Bollinger Canyon Rd. Project Limits – Diablo Road. Project Limits – Sycamore Valley Rd. Project Limits – Crow Canyon Rd. 680

Caltrans District 4 Alameda County Upcoming Projects Dumbarton Bridge San Mateo Hayward Bridge SF Oakland Bay Bridge th Avenue IC Retrofit High Street IC Retrofit I 238/580 Widening and Rehabilitation MacArthur Blvd. On Ramp Distribution Struct. Retrofit SR 84 Pigeon Pass Realignment I 580 PCC Pavement Rehab.

Caltrans District 4 Ala I 80 / 580 / 880 Distribution Structure Retrofit - Utility Corridor Retrofit I 80/580/880 Distribution Structure Cost: $13.2 M Adv: Dec. 2005

Caltrans District U4 Ala 880 – 5 th Avenue Interchange Retrofit Cost:$102 Million Adv: Aug Alameda th Avenue Interchange Retrofit Replace Existing Structure: Maintain Existing Capacity Raise Profile of New Structure Auxiliary Lane, from Oak St. Off Ramp Standard Shoulders Bike and Pedestrian Lane Lake Merritt Channel Project Limits – Oak Street Project Limits – 10 th Avenue N

Caltrans District 4 Alameda High Street Interchange Retrofit Ala 880 – High Street Interchange Retrofit Cost:$60.7 Million Adv: Sept Replace Existing Structure: Maintain Existing Capacity Reconfigure SR 77 / 42 Ave./880 IC- Partial diamond w/ at grade intersection Reconstruct Frontage Road: - Oakport Street - E. Eight Street Standard Shoulders Bike and Pedestrian Lane Project Limits - Fruitvale Avenue Project Limits-.9 km S. of High Street N

Caltrans District 4 I-238 Widening and Rehabilitation I-238/580 IC to I-238/880 IC I-238 Widening and Rehabilitation Cost: $82.4 M Adv: Jan Widening and Rehabilitation: Widen I-238 from 4 to 6 Lanes Rehabilitate I-238 with LLP SB I-880 Aux. Lane from I238/880 IC to A Street Off Ramp Widen NB I-880 to I-238 to 2-Lanes Widen NB I-238 to I-880 to 2 Lanes N Project Limits – A Street Project Limits – I-238/880 IC Project Limits – I-238/580 IC

Caltrans District 4 PCC Pavement Rehabilitation Hacienda Drive - I Ala 580 PCC Pavement Rehab Cost: $28 M Adv: 8/8/05 Project Limits – Hacienda Dr. Project Limits – I Upgrade Existing Pavement : Replace Cracked Slabs Grind All Lanes Repair Shoulders Replace Approach Slab AC Overlay Ramps Rehab Bridge Decks Install Bridge Rails N

Caltrans District 4 State Route 84 Realignment Pigeon Pass Ala 84 Roadway Realignment Cost: $21.3 M Adv: Aug Project Location Livermore Dublin Pleasanton N Roadway Realignment : Improve Horizontal / Vertical Alignment Median Buffer Current Design Standard Standard Outside Shoulder Guardrail Steep Terrain Environmental Sensitive Habitat

Caltrans District 4 Networking Network session