WEATHERIZATION ASSISTANCE PROGRAM PROCUREMENT TOOL KIT

Slides:



Advertisements
Similar presentations
Presents 2012 Revisions to the NC Energy Code For Residential Building started after March 1, 2012.
Advertisements

ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
1. In Accordance With : 2 Highest Level Lowest Level.
The State of Ohio is an Equal Opportunity Employer and Provider of ADA Services. Office of Community Assistance, Home Weatherization Assistance Program.
GPA Renewable Energy Resource for Guam Power Authority
RFP vs. IFB A BASIC APPROACH TO THE BID PROCESS – WHEN RFPs or IFBs ARE USED 2010 AASBO Spring Pre-Conference Workshop Rosa Saenz, PGPC, Inc. Bill Munch,
1 FALL 2010 ASBO CONFERENCE
U.S. Pretrial Services and Probation Office Northern District of Ohio.
SFSP Contracting for Vended Meals Virginia Department of Health Special Nutrition Programs 2014.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
1 1 Dr. Mark Stewart, Camden County Schools Steve Adams, Johnson-Laux Construction Jon Held, Georgia ezIQC SWC Project Manager Willie Moon, DOAS Contract.
Grow your business with Dominion Power and Good Cents
Procurement-the RFP By Warren J. McKeon, CPA, VCO.
New Procurement Rules Training Purchases Greater Than $25,000.
Marcy Mealy Procurement Specialist CDBG Program
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Office of Risk Management Annual Conference Emergency Procurements Tammy Grant, CPPB State Purchasing Assistant Director
Procurement and Food Service Contracts Pages
1 ROLES, RESPONSIBILITIES, AND TIMELINES FOR CONTRACTING ADMINISTRATIVE GUIDELINE NUMBER 3 Harpers Ferry Center Office of Acquisition Management August.
Rachel Weaver Program Manager Maryland Energy Administration
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Massachusetts New Homes with ENERGY STAR ® The sponsors of the Massachusetts New Homes with ENERGY STAR are Bay State Gas, Berkshire Gas, Cape Light Compact,
CITY OF HALLANDALE BEACH PROCUREMENT PROCESS City Commission Workshop February 23, 2015.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Status of the Data Collection Completed – State and Agency Surveys – Indoor Air Quality Study – Bulk Fuels Study – Large Multi-family Buildings Study In.
U.S. General Services Administration Term Contracts Drand Dixon Sales Contracting Officer Federal Acquisition Services Drand Dixon Sales Contracting Officer.
Weatherization 201: Weatherization Works! Updated September 23, 2008.
Request For Proposals (RFP) Process Board of Directors Special Meeting January 29, 2014.
The BioPreferred SM Federal Procurement Preference Program.
Elevating the Quality of Life in the District. INVITATION FOR BID (IFB) Elevating the Quality of Life in the District DEFINITION: An Invitation for Bid.
AISD Bookkeeper and Admin Training 2013 STANDARD SERVICE AGREEMENT Bowie High School August 8, 2013 STRONG LEADERS STRONG SCHOOLS BUILDING ON STRENGTHS.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
Northwest Power and Conservation Council Residential Conservation Resource Assessment Overview of Analytical Process and Major Assumptions April 21, 2009.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
What Small Method Is It? Presented by Jan Giffin, CPPO, CPPB, VCO eVA Business Manager And Katherine Bosdell, CPPB, VCO Statewide Contract Officer.
IDOA RFP Media Buy Pre-Proposal Conference June 11, 2013 Adam Thiemann IDOA Strategic Sourcing Analyst.
Hot Climate Initiative in North Carolina 2007 National Weatherization Training Conference Hot Climate Initiative in North Carolina.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Submitting a Quality Offer On the GSA Language Schedule GSA Federal Supply Service.
1 Weatherization Assistance Program – Procurement Management WEATHERIZATION ASSISTANCE PROGRAM Procurement Management March 2015.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
JEOPARDY FINANCIAL MANAGEMENT EDITION Documentation Procurement Mystery Cost Principles Administrative Requirements Q $100 Q $200 Q $300 Q $400 Q $500.
Uniform Grant Guidance Roundtable Discussion: October 5, 2015 Procurement 1.
You Be the Judge - Case Studies Office of the State Comptroller Office of Operations Bureau of Contracts Priscilla Cassidy Kathy Heffernan.
Office of Procurement Services.  Vendor Application Website: 
JEOPARDY PROCUREMENT EDITION Methods StandardsMystery ProceduresRegulations Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 FINAL.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
HOW TO DO BUSINESS WITH THE CITY OF ATLANTA Department of Procurement Presented by: Keith O. Brooks, CPPO.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Best Practices in Residential Energy Efficiency
MANAGER MEETING AGENDA
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Department of Community Development
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
DIVISION OF STATE SERVICES BUREAU OF CONTRACTS
Purchasing in the 21st Century
Procurement.
Instructions for using TX-UNPS for Procurement Reviews
Presentation transcript:

WEATHERIZATION ASSISTANCE PROGRAM PROCUREMENT TOOL KIT – Susan White, ACKCO, Inc –

TOOL KIT CONTENTS 12 Steps To Procurement Sample General Instructions Sample Specifications and Pricing Quotes Sample Evaluation Examples Fillable General Instructions Fillable Specifications and Pricing Quotes Fillable Evaluation Worksheets

THE TWELVE STEP PROGRAM TO PROCUREMENT Step One: Determine What You Will Be Purchasing Materials Services Materials and Services Small Purchase Procedures Large Purchase Procedures

THE TWELVE STEP PROGRAM TO PROCUREMENT Step Two: Establish the Timeframe for the Purchase(s) Secure Cost Quotations Develop Bid/Proposal/Quotation Package Advertise Receive and Evaluate Award

THE TWELVE STEP PROGRAM TO PROCUREMENT Step Three: Identify the Lead Individual to Manage the Purchase(s) Advertise Facilitate Bidder’s Conference Receive Bids/Proposals/Quotes Insure Adherence to Requirements Staff Evaluation Panel Award

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Four: Prepare General Instructions Solicitation Purpose Oversight of Purchase Contact Information Agency Agreement Key Dates Requirements Bidders Conference Due Date and Location Required Forms Preferences Evaluation and Award

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Five: Prepare Specification and Price Quote Sheets Specific Materials to be Purchased Services to be Purchased Standards for Services Timeframe for Delivery and/or Completion Required Forms

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Six: Advertise the Solicitation Established Bidders List Newspaper Posting in Public Buildings

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Seven: Conduct Bidders’ Conference Record Individuals in Attendance Answer Questions Record Minutes

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Eight: Receive Quotations, Bids, Proposals Identified Agency Individual Date and Time Stamp Provide Offerors with Receipt

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Nine: Evaluate Quotations Establish Evaluation Panel Staff Evaluation Panel Insure Accuracy of Evaluation Work Sheets

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Ten: Select Contractor(s) and/or Vendor(s)

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Eleven: Establish Solicitation File Solicitation Document Documentation of Advertisement Attendees and Minutes of Bidders Conference Bids/Proposals/Quotations Received Documentation the Requirements Satisfied Evaluation Panel Members Evaluation Work Papers Notice to Successful Vendor(s)/Contractor(s)

THE TWELVE STEP PROGRAM TO PROCUREMENT (con’t) Step Twelve: Enter into Agreements

THE TWELVE STEP PROGRAM TO PROCUREMENTS CHECKLIST Determine what you will be purchasing Establish timeframe for the purchase(s) Identify the lead individual within the organization that will handle the purchase(s) Prepare general instructions Prepare specifications and price quote sheets Advertise the solicitation Conduct bidders’ conference Receive quotations Evaluate quotations Select contractor(s)/vendor(s) Establish solicitation file Enter into Agreements with contractor(s)/vendor(s), as appropriate

GENERAL INSTRUCTIONS SIX SECTIONS Introduction Requirements Agency Agreement Content and Format of Quotations, Bids, or Proposals Evaluation of Offers Contractor Application Form

GENERAL INSTRUCTIONS SECTION 1 - INTRODUCTION Purpose of Solicitation Overview Objectives Oversight and Management Type of Agreement and Payment Schedule Procurement Schedule Key Dates

GENERAL INSTRUCTIONS SECTION 2 – REQUIREMENTS Inquiries Bidders Conference Date, Time and Place for Submission Submission Requirements Opening Minimum Qualifications Integrity Applicability

GENERAL INSTRUCTIONS REQUIREMENTS (con’t) Licenses Preferences Insurance Presentation Costs for Preparation of Quotations, Bids, and Proposals Modifications to Solicitation Independent Price Determination Evaluation and Award(s) Miscellaneous

GENERAL INSTRUCTIONS SECTION 3 - AGENCY AGREEMENT A copy of the Agency Agreement or Contract that the vendor and/or contractor signs will be included in instructions

Specific Specifications location or page designation for location GENERAL INSTRUCTIONS SECTION 4 - CONTENT SPECIFICATIONS AND PRICING FORMAT Specific Specifications location or page designation for location Format. If a specific pricing format is to be followed.

GENERAL INSTRUCTIONS SECTION 5 - EVALUATION States conditions under which bids, quotations, or proposals will be evaluated

GENERAL INSTRUCTIONS SECTION 6 - CONTRACTOR APPLICATION Basic Information EIN or SSN Contractor’s License #, if applicable Preference Enterprise Experience Training References Jobs Completed Number of Employees Other Information Certifications

DEBARMENT AND SUSPENSION CERTIFICATION

SAMPLE SPECIFICATION AND PRICING QUOTE Building Shell Measures Insulation Pressure Diagnostic Guided-Directed Air Sealing Windows and Doors Solar Screens Reflective Roof Coating

SAMPLE SPECIFICATION AND PRICING QUOTE (con’t)  Mechanical Measures HVAC Repairs and Replacements Electric Base-Load Measures Lighting and Refrigerators

SAMPLE SPECIFICATION AND PRICING QUOTE (con’t)  Health and Safety Measures Smoke and Carbon Monoxide Alarms Water Heaters

SAMPLE SPECIFICATION AND PRICING QUOTE (con’t)  Other Materials Only Bulk Purchase Materials Only Individual House Purchase Whole House Weatherization

INSULATION SPECIFICATIONS AND PRICING QUOTE INSULATION SAMPLE All materials used in provision of services must meet or exceed 10 CFR 440 Appendix A: “Standards for Weatherization Services” Estimate to insulate in accordance with federal energy efficiency standards and installation methods. Insulation will be evenly installed with no voids, gaps, misalignments, or compression issues. Precautions must be taken when insulating around or on electrical boxes and/or heat producing fixtures. Proper shielding, if necessary, shall be installed by insulation contractor in order to properly insulate all areas. For attic insulation, all wall cavities and drop downs that are exposed to attic shall be capped and insulated over or filled with insulation to assure insulation is in direct contact with air barrier. In these cases a change order would have to be approved. Insulation amount shall also be identified at nearest or easiest attic access point. After completion, all jobs will be inspected by (Insert Agency Name) auditor to assure quality installation. Complete installation must include all labor, and materials to perform services. Contractor MUST provide details on each invoice listing actual square foot installed.

INSULATION SPECIFICATIONS AND PRICING QUOTE (con’t) Contractor is responsible for leaving the job site clean and hauling away job debris. Project commencement and completion must be accomplished within _________ working days of notice to proceed. Contractor must include permit fees (if applicable), sales taxes, labor and materials to complete project.

INSULATION SPECIFICATIONS AND PRICING QUOTE (con’t)

INSULATION SPECIFICATIONS AND PRICING QUOTE (con’t)

INSULATION SPECIFICATIONS AND PRICING QUOTE (con’t)

Windows and Doors Sample

Solar Sun Screen Sample

Materials on House by House Basis

Materials and Labor on House by House Basis

SAMPLES OF EVALUATION WORKSHEETS Baseline Information Sample House Criteria for Evaluation Other Than Cost Profile of Potential Offerors Multiple Vendors/Contractors

Sample House 1,500 sq foot single story home built in 1975, site built stick frame, gable roof, wood siding ranch style over crawl space with 16” on center 10” joist with no insulation, existing attic insulation of R-18, 3 ½” wall cavity no insulation, forced air natural gas furnace at 60% efficiency, 175 l/f of duct supply and return air with duct leakage of 200 cfm50, 40 gallon gas hot water heater, and single glazed wood horizontal slider windows.

Criteria for Evaluation other than Cost

SAMPLES OF EVALUATION WORKSHEETS (con’t) Insulation – Cost Only and Factors In Addition to Cost Pressure Diagnostic Guided-Directed Air Sealing – Cost Only Windows and Doors – Cost Only Solar Sun Screens – Cost Only

SAMPLES OF EVALUATION WORKSHEETS (con’t) Reflective Roof Coating – Cost Only HVAC – Cost Only Electric Base Load Measures – Cost Only Hot Water Heater Replacement – Cost Only

SAMPLES OF EVALUATION WORKSHEETS (con’t) Bulk Materials – Cost Only Materials Only Individual House – Cost Only Whole House Weatherization – Factors In Addition to Cost

INSULATION QUOTATION EVALUATION WORKSHEET