Preparation for May-2013 Review of UCN Beamline March 27, 2013 1 Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)
MC Beamline Tom lackowski L1 Manager. Project Organization Jan. 2013T. Lackowski - MC Beamline2.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Extraction and beamline progress B.Goddard TE/ABT.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ELENA installation progress F. Butin / ELENA collaboration.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
He Plant, LN2 Systems and Commissioing
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
Francois and Lau EATM 17 July 2012
VELO-installation meeting CERN, January 17, 2006
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
User Facilities 2016 Users Group Board of Directors Update
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Anthony DiPette Installation / Vacuum Group Leader 7/17/2015
ARIEL Phase I Operations
Hall C Dump Status Beam Resuscitation Review
Rad safety and activation
APTM and GRID interface requirement PBIP and PBW
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Presentation transcript:

Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014 Shutdown Work

UCN Facility (BL1U) 2 nEDM Experiment Region

BL1U May-2013 Review (Scope) 3 nEDM Experiment Region Focus: 2014 Shutdown / Installation 1) Overview (Facilty, Schedule, etc.) 2) BL1U (Layout, service/control infrastructure) 3) Kicker and Septum 4) 1UB2 (vacuum box) 5) Vacuum 6) Diagnostics (1AUM5, 1UM6/1UBB2) 7) Timing monitor (1AUM4) 8) Shielding plug

Alignment to ½ mm, especially our tilted 1BVB2 magnet and vacuum 'tubes' in the Septum Magnet. (BL) Paint blocks as well as floor? (Plant/BL) Plan to tilt the 1BVB2 magnet. (BL) Put in piping for cooling lines for Target and Liq D 2 O under shielding to sub-basement. (Plant) Plan for 'hand-pack' around 1A and 1U 'plug' penetrations. Pre-fabricate pieces? (Plant) Understanding signal cabling in Vault/Tunnel (especially when it is attached to the ceiling or wall made of shielding blocks. Apparently this belongs to many different groups and not just Controls. (Diag/Vac/Safety/Controls) List of final tests to be done before “sealing up” 1A Tunnel. Undiscussed UCN Issues for 2014 S/D