2 What’s in the VECC MoU3 Target Station Target Module Source Tray
TM Support Structure E-beam diagnostics E-beam raster Front-End Pre-separator and PS 50m beamline [West target station to b-NMR] at $20k/m, incl. optics, diagnostics, vacuum, power supplies, support structures

3 What’s in the VECC MoU3 Beam Test High Voltage Cooling Vacuum Control
Shielding blocks Development Quick Disconnect Pillow seals Source tray Ion Source Ion beam diagnostics  

4 No ok ok No ok No ? No ok ? ? 12/5/2018 All Hands - May 2010

5 ARIEL Services (Remy’s list)
Hazard analysis Shielding within the building shell Nuclear ventilation from stub ducts Air heat removal required beyond base install Water cooling from raw water supply/return Electrical distribution from main panels Air compressor and all compressed air distribution from trunk headers License to operate!

6 Action List Target Hall and RIB services and infrastructure
Resource-loaded schedule for ATM (ARIEL Target Module), incl. development – PB - Design of Low energy beam transport from West TS to b-NMR - Layout/Optics - Diagnostics - Enumerate components - Detailed budget