David Redman, Director Facilities and Administrative Services Division April 4, 2012 1 HQ Renovation All Hands.

Slides:



Advertisements
Similar presentations
REACH Partnership MIDDLE/ HIGH SCHOOL #341 EMERGENCY SAFETY PLAN
Advertisements

David Redman, Director Facilities and Administrative Services Division
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Guidelines and Required Codes That Affect Building Design
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
MU Building Emergency Coordinator Training
DLA Strategic Materials ESOHMS Document Control Policy Training December 2014 Hard copies of this document may not be the current version. Refer to the.
HQ Renovation All Hands
Crisis Plan Jeopardy FIRE Shelter in Place Bomb Threat Tornado
Pierce College Evacuation Plan Chris MacKersie Assistant Facilities Director Director of Safety & Security.
FLOOR WARDEN TRAINING Presented by State Risk Management 2011.
3700 Centerpoint Emergency Action Plan Tenant Training.
CSM Building Monitor Training Update June 21, 2012.
Emergency Evacuations - Norristown October TMD-8303-SA Introduction / Key Topics To provide USM Employees & Management instructional guidance.
Building 200 Interior Renovations. Agenda Item 1: Initial questions Item 2: Construction Schedule Item 3: Moving Schedule and Process Item 4: Q&A – regarding.
Emergency Evacuation Procedures
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
What You Need to Know About EPA’s ENERGY STAR Certified Homes Program Learn more at energystar.gov 1.
Environmental Safety Plans
Technology and Engineering Development (TED) Building (55) Occupancy.
Understanding Fundamental Concepts and Trends of Drafting
Emergency Information Sheet What is the Emergency Information Sheet? Every student must complete an Emergency Information Sheet (EIS). They.
Energy Conservation Western North Carolina Recycler’s Networking Council Black Mountain, North Carolina December 9, 2004 Keyes McGee, E.I. North Carolina.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
 The front desk is perhaps the first stop for many students.  It is very important to keep the area clean, organized and professional in appearance.
Disaster Recovery: Lessons from Katrina Gail Ann McCreary, CRM Mississippi Power Company.
1/05 Means of Egress WAC School Safety Training.
Safety Training Presentation
Risk Management Guidelines. Not If, But When Injuries and medical emergencies can and WILL occur Injuries and medical emergencies can and WILL occur It.
David Redman, Director Facilities and Administrative Services Division September 27, HQ Renovation All Hands Return to Floor 8.
David Redman, Director Facilities and Administrative Services Division March 7, HQ Renovation All Hands Relocation From 7 th Floor to 5 th Floor.
Guest Cycle A division of the flow of business through a hotel that identifies the physical contacts and financial exchanges between guests and hotel employees.
High Rise October DISPATCH E82, E83, E81, E97, E86, E95, T82, T98, R81, R83, R97, B8, B9, OSO respond to a reported structure fire at 777 W. Lake.
School Emergency Plan Overview Minooka Community High School District #111.
David Redman, Director Facilities and Administrative Services Division September 25, HQ Renovation All Hands Relocation From Floor 6 to 5.
1 Presentation to Technical Services Step 1 - Walk-through of new premises Step 2 – This presentation will focus on next steps to relocate staff and departmental.
Copyright © School Nutrition Association. All Rights Reserved. Receiving Little things make a big difference.
The Culture Center Security. THE HUMAN RESOURCE COORDINATOR WILL INFORM SECURITY OF: NAME DATE OF ARRIVAL, ADDRESS, PHONE # THE SUPERVISOR WILL INFORM.
David Redman, Director Facilities and Administrative Services Division May 21, HQ Renovation All Hands Relocation From 3 rd Floor to 5 th Floor.
Westbrook Middle School Move Class Welcome. MOVE TEAM  Move Leader - Brian Mazjanis  Move Coordinator – Theresa Brackett, Spaces Design Studio Office:
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Drill Schedule John Jay High School Mrs. Varian.  At the sound of the alarm, students are to remain silent and quickly exit the classroom going toward.
Laboratory Procedures Chemical Management Emergency Laboratory Equipment m.inmagine.com CH5, CH6, CH10.
Graphic Communications Group Severe Weather Procedure.
Tissue Banks International Move Presentation 1. Key Dates Monday, December 9 th - Packing & Relocation of Distribution Cage Wednesday, December 11 th.
DS200 PROCEDURES SPEAKER TOUCH SCREEN DISPLAY
David Redman, Director Facilities and Administrative Services Division June 13, HQ Renovation All Hands.
David Redman, Director Facilities and Administrative Services Division March 7, HQ Renovation All Hands Return to the 4 th Floor.
Means of Egress Don Ebert- Risk Manager (509)
Recognizing and correcting hazards
Hot Work Permit Osan AB Fire Emergency Services.
SAFETY, SECURITY, AND EMERGENCY PLANS IN THE MEDICAL OFFICE Chapter 10, Unit 1.
David Redman, Director Facilities and Administrative Services Division December 11, HQ Renovation All Hands Return to Floor 6.
The Office Procedures and Technology Chapter 7 Time and Workstation Management Copyright© 2007 Thomson/South-Western.
TENANT TRAINING HURRICANE SEASON 2016 NATIONAL SAFETY MONTH Along with the start of Hurricane Season, June is observed by the NSC as National Safety.
City of Novato Move Presentation
Tissue Banks International Move Presentation
Emergency Evacuations: Multi-Level Apartments
Because Technology Never Stops
HERITAGE HIGH SCHOOL #425 EMERGENCY SAFETY PLAN
Iron Forge Educational Center: U. S
Because Technology Never Stops
TENANT TRAINING HURRICANE SEASON 2018
Thursday, Sept. 8thth Welcome! Mrs. Smith
Because Technology Never Stops
Safety is part of our culture at Halliburton
Tenant Safety Team Guidelines
Need to Know these terms:
TENANT TRAINING HURRICANE SEASON 2019
Employee Move Guide for [company name here]
Presentation transcript:

David Redman, Director Facilities and Administrative Services Division April 4, HQ Renovation All Hands

Welcome— David Redman, Director, Facilities and Administrative Services Division HQ Relocation Reminders Move Information Key Dates Evacuation Plan Paul Raudenbush, Chief, Headquarters Security Information Security Classified and SBU Information Safe Relocation Arnold Rotruck, Paxton Van Lines Packing Guidelines 2 Agenda

Office of Communications Patrice Williams, Sharon Lord (Alternate) Office of Procurement Laverne Randolph, Susie Marucci (Alternate) Office of Protective Services Mark Dodd, Lakeesha Matthews-Williams (Alternate) Office of Safety and Mission Assurance Bill Loewy 3 Organization POCs

2 nd Floor Moves April 25 th Communications, and OSMA Move to the 2 nd Floor April 30 th Procurement 4 th Floor Move May 3 rd OPS Moving crates / labels will be delivered two weeks prior to move April 11 th Employees are strongly encouraged to take personal items home Organization file cabinets MUST be emptied by April 16 th Proper labels must be applied 4 Move Information

File Pedestals Employees MUST be packed & ready to move by COB the day before scheduled move April 24 th – Communications, OSMA April 27 th - Procurement May 2nd - OPS ITCD will pack computer equipment Employees to complete Paxton label sheet and place on desk for IT to apply System Furniture Keys 5 drawer file cabinets should be locked and key provided to move POC File pedestals do not have to be emptied and will be moved by Paxton movers. Pedestals should be locked and keys remain with employee 5 Move Information

Office keys Office Protective Services, keys will remain with employees Office of Communications, Procurement and OSMA employees with NASA issued keys must place keys in key collection envelope and complete a key card to receive new key. Key card and collection envelope should be returned to your POC. *Facilities will update workstation/office numbers for individuals related to renovation moves only. If employees move after their relocation, it is the employees responsibility to update their information. 6 Move Information

7 Move Guide Provided to POCs, March 27 th

April 11 th Delivery of moving crates April 24 th Packing completed for Communications, OSMA April 25 th Office Move/Telework Day - Communications, OSMA April 27 th Packing completed for Procurement April 30 th Office Move/Telework Day – Procurement May 2 nd Packing/Re-labeling completed for OPS May 3 rd Office Move/Telework Day – OPS * IT will be fully restored at completion of move. Employees should follow ITCD’s leave behind to map printers. 8 Key Dates

2 nd Floor Location 9

4 th Floor Location 10

Evacuation Procedures HQ Evacuation procedures remain as they have been, despite renovation work and personnel relocations. If you are moved to a new area of the building for the renovation, look for the emergency exits and signs and familiarize yourself with your new staging area before an evacuation, so you know where you should report if the alarm sounds. Verify your evacuation routes and staging area, regardless of where you are in the building. If an alarm sounds listen, then act quickly 11

Evacuation Procedures If you need assistance evacuating, report to the galley area on whatever floor you are on. Once out of the building, do not return until the “all-clear” is given. Follow directions given by the ICP, Emergency Management, Security, and Building Monitors. 12

Evacuation Staging Areas 13

New Galley Areas 3 per floor Keurig Coffee Maker Microwave (2) Refrigerator (2) Ice Maker Seating Area 14 HQ Renovation Update

New task lighting Existing overhead task lighting will no longer be provided New fixtures will be provided as part of the renovation New fixtures required to meet US Green Building Council’s LEED Energy & Atmosphere Prerequisite 2 15 HQ Renovation Update

New sound masking and PA systems Sound masking provided throughout the building Zone controlled and adjustable Sound masking will be utilized as the PA system GS 15 Employees 1 row of overheads (1) 2 drawer Lateral File Cabinet 16 HQ Renovation Update

 Project Manager  Brian Smith:  Assistant Project Manager  Regina Reilly:  Assistant Project Manager  John Ferri: Please visit our website for more information: 17 HQ Renovation Facilities Points of Contact

Information Security Classified Information Sensitive But Unclassified Information Identifiable markings to indicate sensitive information SBU Cover Sheet Burn Bags Securing Burn Bags Storage and Pick Up Locations Safe Relocation Protect Information that Warrants it! 18

Packing Guidelines Packing with the Pax Box System Build and stack Legal/Letter/Hanging Files Stack and pack Label Placement and Removal 19

20 Questions

Back Up Slides 21

Typical Floor Layout 22

23

24

25

Design Advantages HVAC wall units will be used properly and help balance the building HVAC system Reduced “hot” and “cold” spots Improved air circulation/quality Increased natural lighting has been proven to increase productivity Reduce overall energy usage 26

LEED Certification Piedmont is required to achieve Leadership in Energy and Environmental Design (LEED) Certification Construction Interiors Goal is Silver Requires a partnership between landlord and NASA 27

LEED Certification NASA can receive LEED points toward certification through the following actions: Reuse of existing furniture Provide a thermally comfortable environment that supports the productivity and well-being of occupants Achieve increasing levels of energy conservation for HVAC beyond the prerequisite standard to reduce environmental impacts associated with excessive energy use 28