Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Control System Status EPICS Collaboration Meeting December.

Slides:



Advertisements
Similar presentations
LCLS Control System Overview Mike Zelazny SLAC ICD Software Department Accelerator Directorate.
Advertisements

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Synchrotron Radiation Science at SLAC Joachim Stohr, SSRL Deputy Director July 6, 2004.
John Arthur LCLS September 26, 2005 John Arthur SLAC LCLS Construction and Science.
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Bob Dalesio Controls October 13-14, 2004 Controls Overview LCLS Facility Advisory Committee October 13-14, 2004 Outline Goals.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
Patrick Krejcik LCLS June 16-18, 2008 High Level Applications Facility Advisory Committee Meeting June 17, 2008 Applications Team.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
Dayle Kotturi Controls April 29, 2004 Controls Overview LCLS Facility Advisory Committee April 29-30, 2004 Outline Status.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
LCLS Control Group FAC - Controls April 7, 2005 Controls Overview April 7, 2005 Outline ES&H Goals FAC Responses.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Controls Overview April 20, 2006 LCLS Controls Group Outline Goals.
UCLA The X-ray Free-electron Laser: Exploring Matter at the angstrom- femtosecond Space and Time Scales C. Pellegrini UCLA/SLAC 2C. Pellegrini, August.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
1 st All Hands Meeting Milton 20 Feb st ANL LCLS All Hands Meeting 20 February, 2006.
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Operations, Test facilities, CF&S Tom Himel SLAC.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Jefferson Lab IT in the 12GeV Era - Review Accelerator Controls Matt Bickley 05/20/11.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
Heung-Sik Kang Pohang Accelerator Laboratory
LCLS Commissioning & Operations High Level Software
Presented by Li Gang Accelerator Control Group
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Introduction Functional Requirements (Stephanie) SLC Executive (Diane)
ATF/ATF2 Control System
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF and feedback Outline Scope LLRF Requirements
LCLS Commissioning & Operations High Level Software
LCLS History and Science Overview Keith Hodgson, SSRL Director April 23, 2002 LCLS DOE Review, April 23, 2002 Keith Hodgson, SSRL.
High Level Physics Applications for LCLS Commissioning
LCLS Control System Design, Management & Organization August 10, 2004
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Global Controls Overview August 10, 2004
LCLS Control System Personnel Linac & BC2 Controls progress
High Level Physics Applications Lehman Review February 7 - 9, 2006
Presentation transcript:

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Control System Status EPICS Collaboration Meeting December 8-10, 2004 Outline Project Overview Control System Goals Resources Design Slides for Global Systems Tools/ Standards to adopt from the community for LCLS Next 6 months Conclusions

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 The World’s First Hard X-ray Laser

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, : LCLS Design Study Report SLAC : National Academies Report : BESAC (Birgeneau) Report : Design Study Group (M. Cornacchia) 1999: BESAC (Leone) Report $1.5M/year, 4 years 2003: DOE Critical Decision 2A $30M in 2005 for Long Lead Procurements 2001: DOE Critical Decision : LCLS- the First Experiments (Shenoy & Stohr) SLAC : LCLS Conceptual Design DOE Critical Decision 1 $36M for Project Engineering Design 2005: Spend $30M Long-Lead Acquisitions 2006: Groundbreaking 2007: First Light 2008: Project Completion 2004: DOE 20-Year Facilities Roadmap Critical Decision 2B: Define Project Baseline 1992: Proposal (Pellegrini), Study Group(Winick)

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Capabilities Upgrade – more bunches/pulse Spectral coverage: nm Peak Brightness: Average Brightness: 3 x Pulse duration: <230 fs Pulse repetition rate: 120 Hz Photons/pulse: To 0.5 Å in 3 rd harmonic

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Construction Collaboration Project Management Responsibilities Delegated to Partner Labs UCLA LLNL

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Linac Coherent Light Source Project Description Near Hall Far Hall FEL Center

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS - Estimated Cost, Schedule $273M Total Estimated Cost $315M Total Project Cost FY2005 Long-lead purchases for injector, undulator FY2006 Construction begins FY2007 FEL Commissioning begins September 2008 Construction complete – operations begins FY2008FY2009 Construction Operation FY2001FY2002FY2003FY2004FY2005FY2006FY2007 CD-1CD-2aCD-2b CD-3a CD-3b CD-0 Title I Design Complete XFEL Commissioning CD-4 Project Engineering Design Long-Lead Procurement

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Femtochemistry Nanoscale Dynamics in Condensed matter Atomic Physics Plasma and Warm Dense Matter Structural Studies on Single Particles and Biomolecules FEL Science/Technology Program developed by international team of scientists working with accelerator and laser physics communities Aluminum plasma classical plasma dense plasma high density matter G=1 Density (g/cm -3 ) G =10 G =100 t=0 t=  “the beginning.... not the end” SLAC-PUB-611

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Control System Goals Provide a fully integrated control system to support the construction, test, installation, integration, operation and automation of the LCLS Accelerator Standardize all devices and components across all subsystems. Identify all data either by pulse id, beam pulse related time stamp, or 500 msec rough time stamp. Full integration with the SLC – timing, use of LCLS data in SLC high level applications, and use of SLC data in LCLS

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Personnel – Resources FY 2005 Q Q Q Q Q Ctl. Elec. Engineer Ctl. Sr. Elec. Tech. Ctl. Elec Tech. Pwr. Elec. Engineer Pwr. Sr. Elec. Tech. Control Prog. Continuing Resolution: take care of prototyping 1.75 in other WBS Ramp up Over 6 months to full complement

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Integration with the SLC Control System SLC Alpha All High Level Apps PNet (Pulse ID / User ID) MPG SLC Net over Ethernet (Data Transfer) micro Camac I/O RF reference clock Xterm EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS WS Distributed High Level Applications CA over Ethernet (EPICS Protocol) I/OC (SLC-aware) EVGEVG Micro emulator PNETPNET CAS I/OC (SLC-aware) Micro emulator Fast Feedback CA Gateway EVREVR Timing

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Global Communication Buses CPUCPU EVGEVG Beam Code + EPICS Time + EPICS Events LLRFLLRF 16 triggers CPUCPU EVREVR Diag 16 triggers IOC EVREVR CPUCPU EVREVR Pwr Supply Ctrl IOC Channel Access SLC Alpha Apps Xterm EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS W/S Distributed Applications EPICS WS Distributed High Level Applications CPUCPU Vacuum Ctrl SLC-Net over Ethernet Fast Feedback over Ethernet? Machine Protection Drive Laser Off Beam Stop In MPG PNETPNET

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Environment EPICS Release3.14.n R/T OSRTEMS Workstation OSLINUX EPICS ADE (CVS)Simple?? CompilersGNU Bug Report / TrackingArtemis Naming StandardPEP II Name ServiceName Server JLAB DocumentationWeb Area Test stationsFFTB

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Client Tools Display ManagerEDM ArchiverChannel Archiver Alarm HandlerALH Message LoggerCMLog Electronic Log Book DESY, Babar, JLAB? StripchartStripTool Web based viewingSPEAR, A-Beans, JoiMint,AIDA?? Image AnalysisMatlab format? Save / Restore? RDBSNS (leaning) Gateway Gateway

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 High Level Applications MatlabAvailable for Physicists PythonAvailable for Physicists High Level Apps SLCAvailable in existing system XALNew direction Matlab basedGrowing group of users Top priorities to move into EPICS Which ones make the SLC-aware IOC easier Which are the most useful Which are the easiest to pick off

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Hardware Direction – Buy/Steal/Make In-HouseVME version of the PNET CommercialBPM - Echotek and Libera Electronics CommunityTiming System (Diamond/SLS/APS) CommunityDigital Power Supply Controller (SLS) CommercialLLRF - Digitizers CommercialMachine Protection System in PLC? 8msec CommercialVideo – evaluate several options (30 Hz) CommercialConventional Facilities through AB PLC CommunityWire Scanners ?? CommercialFast feedback in shared memory?

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Next 6 Months Complete SLC-aware IOC (30% Complete) Complete PNET Prototype (75% Complete) Complete BPM Prototype (5% Complete) Complete Timing Prototype (5% Complete) Complete Power Supply Prototype (30% Complete) Complete Video Prototype (10% Complete) Design Document for Machine Protection System – determine if there is something that we can evaluate Integrate Facility Controls, XRay Transport, Experimental Hall into the control system.

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 Conclusions We hope to base all of our hardware on developments from the community or those commercially available. Integration with the existing SLC system is a critical step to allow SLAC operators to use the existing tools while we are adopting and modifying replacements. We are using standard EPICS tools for core development and engineering interfaces. We are adopting all we can from the community and we will use our resources to extend them as we can.

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Software Tasks – Development SLC-aware IOC Drivers for all new hardware Machine Protection / Mitigation Master pattern generator Fast Feedback Communication High Level Applications Correlation Plots Fast Feedback Loops Emittance reconstruction from wire scans and profile monitors Profile monitor image analysis for slice emittance with the transverse cavity Beam Steering and online orbit modeling Beam Steering “scans” to emittance reconstruction from wire scans and profile monitors

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Software Tasks – Standardize/Acquire Data Archiving to support all phases of the project Operator Display Tools / Synoptic, Plots, Waveform, Image Alarm Management Electronic Log High Level Application Support: Matlab, XAL, Python Control System Configuration Tools Relational Database Management in all project aspects

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Software Tasks – Control Programmer 1RF Control 2Diagnostics 2.1 Toroids & Faraday Cups 2.2 Beam Stops 2.3 Profile Monitors & Video Devices 2.4 Wire Scanners 2.5 Bunch Length Monitors & E/O Diagnostics 2.6 Beam Position Monitors 2.7 Collimators 2.8 All other stops 3Gun Laser and Drive Control 4Vacuum 5Magnet Power Supply Control IOC and software 6Beam Containment / Personnel Protection / Machine Protection

Bob Dalesio EPICS Collaboration Meeting Tokai December 8-10, 2004 LCLS Hardware Tasks 1Global New timing boards – Master Pattern Generator and Event Receiver Boards Machine Protection System RF Control – New LLRF Control 2Diagnostics 2.1 Toroids & Faraday Cups 2.2 Beam Stops 2.3 Profile Monitors & Video Devices 2.4 Wire Scanners 2.5 Bunch Length Monitors & E/O Diagnostics 2.6 Beam Position Monitors 2.7 Collimators 2.8 All other stops 3Gun Laser and Drive Control 4Vacuum Standards 5Magnet Power Supply Controllers 6Beam Containment / Personnel Protection