1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.

Slides:



Advertisements
Similar presentations
Project FP7-PEOPLE-IRSES: ASK no
Advertisements

Do Now: Matching Game  Match the numbers from Column A to the clues in Column B to learn fun facts about Title IIA Massachusetts Department of Elementary.
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
ILC Spanish Meeting – Gandía, 1 de Diciembre de /25 ILC Communication and Outreach ILC Communication and Outreach Perrine Royole-Degieux
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
4th Annual Innovation Challenge Kick-Off and Overview Fall
The 4 Steps To Get Branch Leadership! A Proven Method Used By Another Organization For Over 75 Years Presentation developed by Roger D. Pelz, SIR Branch.
Role of Management and Technical Coordination
Student Organizational Guide Part 1 “How to Transition into Your New Executive Position”
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
EUROPEAN WORKPLACE AND ALCOHOL EWA PROJECT Main elements of coordination, administration and reporting WP1 Lidia Segura and Eva Moreno Program on Substance.
CERGOP-2 Conference, Warsaw, September , 2003 CERGOP-2/Environment A Challenge for the Next 2.5 Years P. Pesec Space Research Institute, Graz, Austria.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
1 EUDET Status Preparation Annual Meeting Information Annual Report Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
European Cooperation in the field of Scientific and Technical Research COST is supported by the EU RTD Framework Programme ESF provides.
Month 6 Meeting Dedeman Hotel, Ankara, Turkey Thursday July 7 th 2005 R ESIST V IR Co-ordination of Research on Genetic Resistance to Plant Pathogenic.
AIDA negotiation process AIDA NCP Meeting,
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2008 NIKHEF, October 8th.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
CARE Steering Committee R. Aleksan CARE Steering Committee Meeting, September 5-6, Introduction et.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
CARE Governing Board R. Aleksan CARE Governing Board Meeting, November 25, Introduction et objectives.
Valeria Perez Reale YPP GA 6/031 YPP "HEP Young Particle Physicists Club at CERN” part of the CERN Staff Association Club system since 11/02 Constitution:
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
TALENT Supervisory Board Meeting TALENT Kick-off meeting CERN H. Pernegger Training for cAreer deveLopment in high-radiation ENvironment Technologies.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
1 EUDET Report on Management & Summary toTransnational Access Felix Sefkow Extended Steering Committee Meeting August 31, 2010 Outline:  Management Summary.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
JRA1 Activities Administrative issues –Financial accounting system established at DESY Based on SAP, traces all WP`s in JRA Based on EXEL, traces all cost.
1 EUDET Report on Management & Summary Transnational Access Felix Sefkow DESY Annual Meeting 2009 October 20, 2009 Outline:  Management Summary  Annual.
AIDA Governing Board meeting 30 March 2012, DESY Use of resources in Y1 and distribution of EC pre-financing (2nd installment) S. Stavrev, CERN Administrative.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
European Life Sciences Infrastructure for Biological Information ELIXIR Collaboration Agreement Template ELIXIR/2014/10 Vera Herkommer.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
AMICI WP1 – Management, coordination and dissemination
EUDET Management Report Joachim Mnich EUDET Annual Meeting MPI Munich
Extended Steering Committee Meeting
New STEP PI Workshop.
EUDET Detector R&D towards the International Linear Collider
EU Institution Board 1 representative of each participating institute
3. Februar 2006 Tobias Haas DESY
European Network for Novel Accelerators (EuroNNAc)
SKADS Controller’s Meeting Timeline Annual Financial Report
EUDET Extended SC meeting 31 August 2009
WP 1 Management and Coordination
Position Descriptions
Presentation transcript:

1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006

2 EUDET Management JRA1 Test Beam Infrastruture T. Haas DESY JRA2 Tracking Detectors J. Timmermans NIKHEF JRA3 Calorimeter F. Sefkow DESY Ch. de la Taille LAL Orsay NA2 Detector R&D Network K. Desch Bonn I3 Coordinator J. Mnich DESY Steering Committee External Scientific Advisory Board Ph. Burrows D. Karlen Th. Müller L. Rolandi T. Takeshita EU Daniel Pasini European members form Selection Board for TA  Scientific Assistant to help the coordinator  Task leaders have been assigned for the various work packages

3 Coordinator Selected action items in 2006:  March: final contract  April/May: reception & distribution of 1 st Instalment  little problem: reason of transfer, will be fixed  July:preparation of Contract Amendment  no answer yet Acknowledgements:  DESY EU office: Nina Dahlke & Ute Krell unmeasurably important help  Karsten Büßer: advisor and temporary Scientific Assistant Scientific Assistant:  position not yet filled 2 selected candidates declined offer  still hope that we can fill the position at some point…

4 Steering Committee  Bi-weekly telephone meetings  including short minutes  will be put on protected web page (once existing)  Preparation Kick-off and Annual Meeting  Approval of reports  Contact to ESAB  Gigi as ESAB chair is particpating in the phone meeting

5 Miscellaneous  Management web pages  introduction, lists of committee members  for none-public stuff (minutes, budgets, etc.) still use old pwd protected area at  will be changed soon  lists existing lists (with obvious purposes)     eudet-jra2  include all, but not  Need to move to new DESY SYMPA system  supposed to cure problems, e.g. combining lists  Klaus will take care of that

6 Miscellaneous  Agenda of EUDET meetings  Indico category created at → Detector Design & Physics Studies → Detector R&D collaborations or go directly to  should be used for all EUDET related meetings  e.g. today’s Extended Steering Committee  the Annual Meeting  or JRA meetings to have all agendas, talks, documents etc. at one place

7 Financial Issues  NA1 EU budget DESY:  Scientific Assistant (from July 2006)  Travel DESY SC members (JM, Felix, Tobias)  Travel ESAB members  Funds for special invitations  + 5 k€/year SC members (Christophe, Jan, Klaus) included in CNRS, NIKHEF, UBONN budgets  DESY part:  EU budget €  1 st Instalment €  estimate end € ≈ 47% (of 1 st instalment)  Travel DESY and ESAB ≈ ok  no special invitation yet  Scientific Assistant, only partially spent

8 Financial Issues  NA2 EXCHG budget:  contains travel money for all participants Annual Meetings and other consortium meetings  budget is distributed over all partners 1 k€/year/FTE + overheads  DESY NA2 EXCHG budget includes travel money for (most) associates  23 k€ /year +overheads  DESY part:  EU budget €  1 st Instalment €  estimate end € ≈ 35% (of 1 st instalment)  estimate +overheads rather uncertain:  assume 15 travels of associates to Munich  but there is still money left for associates  DESY will not use its NA2 travel budget