TRANSMISSION SYSTEM KERALA 2015-32 K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

The Power Grid ELEC 403 The Citadel Mark McKinney.
Regional Planning Group Project
CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
Strictly Private & Confidential 1 Tunis, 21 October 2009 Nur Energie Solar Development in the Mediterranean Basin.
Brief on HVDC 2015 Brief on HVDC 2015
Department of Water and Power City of Los Angeles Renewables Portfolio Standard (RPS) Master Plan Building Out Opportunities October.
Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
The Need for an Energy Grid in the Maldives
Supergrid Modelling for the Indian Subcontinent Farhan Beg Global Energy Network Institute With Inputs from Mr. Peter Meissen and Mr. Paul Michael Dekker.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
1.Where is electricity generated? 2.How are fossil fuels created? 3.What type of energy is stored in a fossil fuel? 4.What is the purpose of the fossil.
Africa Geospatial Forum Geospatial Empowering Utilities.
(Associate Professor)
The SEC Power Forum Wolfgang Braun CEO Energy Transmission Middle East, SIEMENS Session IV: Opportunities in Transmission & Distribution Related Industries.
Smart Grid in Transmission Engineering Cell, GETCO, Vadodara.
HIGH VOLTAGE DC TRANSMISSION by Muhammad Sarmad Hafeez
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Electricity Network Connectivity Between the GCC Countries Presented By: Adnan I. Al-Mohaisen May 17, 2005.
Transmission and Distribution - Role of Indian Electrical Equipment in the XII Year Plan. Presentation by: Sterlite Grid Ajay Bhardwaj COO.
ELG4125 Transmission and Distribution Systems
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
DC Superconductor Cables for Long Distance Transmission 2009 Mid-America Regulatory Conference Traverse City, MI June 14-17, 2009.
APPLIED ELECTRICITY SS3
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Alok Roy. UHV/EHV Level HV/MV Level LV Level The Concept of a power grid.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
DEVELOPMENT OF SOUTH ASIAN GRID. WHY SOUTH ASIAN GRID ? Optimal Utilization of Natural Resources Opportunity of Energy Trading Economy of Scale Advantage.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
Transmission Integration of Nuclear 1 Bantamsklip Site November 2009.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Vision for Power Sector: To Ensure reliable & quality power supply to all citizens by 2021 at an affordable price. Vision 2021: To be a Middle-Income.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
BANGALORE TRANSMISSION PLANNING
Efficient Energy Transmission using HVDC
HVDC Transmission.
1 3 Earths will be required by 2050.
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
Population – 2015 (Million)(2) Energy Generated (TWh) (1)
Damitha Kumarasinghe Director General
Electricity is produced at the power station.
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
ARYA INSTITUTE OF ENGINEERING & TECHNOLOGY
POWER CRISIS AND ENERGY POLICY OF KERALA
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
POWER GRID INTERCONNECTIONS IN CHINA
HVDC Transmission Systems:
Presentation transcript:

TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)

NEED FOR ADEQUATE TRANSMISSION STSYEM Generation capacity addition – limited chances Existing generation mainly in Central / Southern parts of Kerala Demand in northern parts of Kerala increasing at faster rate Increased import requirement to meet demand Transport of power to load centres

TRANSMISSION TO FECILITATE Import of sufficient power from outside Evacuation of power from generation projects within state Efficient transfer of power to load centres Grid map Kerala South India

IMPORT OF POWER Existing system Total capacity 4500 MW (Possible 2000 MW only due to constraints) Constraints Inter regional S1 - S2 corridor congestion Overloading of inter state lines to Kerala

IMPORT OF POWER contd Future import requirement Proposals to increase import Sufficient to meet demand up to KV link between Trivandrum – Tuticorin for future

EFFICIENT TRANSFER OF IMPORTED POWER 400 KV network within state required – Proposed works Madakkathara - Areacode DC line by Areacode – Mylatti DC line by

POWER EVACUATION FROM GENERATION PROJECTS Proposals for power evacuation from new generation projects Proposals for power evacuation from new generation projects

STRENGTHENING OF EXISTING NETWORK To overcome inadequacies – Proposals Proposals To meet the future demand – Projected demand Projected demand – Existing substations Existing substations – Future requirements 400 KV substations 220 KV substations

MAJOR ISSUES Objection from landowners For cutting trees For placing towers Delay in land acquisition Contract failures

REMEDIES Narrow based towers / Monopoles Multi voltage / multi circuit towers EHT UG cable Submarine cable HVDC transmission Higher capacity conductors / HTLS conductors GIS / Hybrid stations Existing ROW for new lines Simplify LA procedure New system for tendering / selection of contractors Timely decisions / Timely payments Route/Technology options Discussion with political parties

ACTION REQUIRED Completion of ongoing projects on war footing Timely completion of already sanctioned lines Follow up action with CEA / SRPC/ PGCIL Renovation / up gradation of existing system Adopting new technologies and new systems Long term planning

THANK YOU