Update on the New CNS/ATM Systems Development Project

Slides:



Advertisements
Similar presentations
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
Advertisements

Regional RAIM Prediction System – Progress Report
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
NAN National ANS Network General Authority of Civil Aviation
The global voice of ATM The Global Voice of ATM The Need for Modernisation of ANSPs.
Satellites –part of the solution for global Air Traffic Management An Airbus view Peter Potocki de Montalk – Director, Air Traffic Systems 3 March 2006.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Toby Farmer, CAA New Zealand. 1995Worlds first operational use of CPDLC and ADS-C using datalink ACARS ANSPAirways New Zealand OperatorQantas.
Executive Order No. 359 Establishment of PS Regional Depots RATIONALE
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Air Traffic Management
BY S V SATISH GM (AIR TRAFFIC MANAGEMENT) AIRPORTS AUTHORITY OF INDIA.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Thailand Implementation of CNS/ATM Infrastructure Thailand.
1 1 COMPASS Satellite Navigation System Development Nov. 26 th -28 th, 2008, Beijing China Satellite Navigation Project Center SIDEREUS 2008.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Air traffic increases steadily over the years that lead to the increase of flights through the Poles, oceans and regions with reduced radar coverage.
This is it! STIR things UP Slow down HIV spread ASAP N A T I O N A L E P I D E M I O L O G Y C E N T E R Strategic Information & Response Planning Workshop.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Civil/Military Users: Whose Airspace is it Anyway? Kim O’Neil Advanced Aviation Technology Ltd. AAT.
Aircraft Navigation Basics 1/C MQS. Two Schools of Air Nav  Visual Flight Rules (VFR)  Navigation accomplished primarily by visual reference to the.
CIVIL AVIATION BUREAU OF JAPAN Long term vision for Air Traffic Systems CARATS (Collaborative Actions for Renovation of Air Traffic Systems) CP01 /Ipxx.
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
Satellites enabling the integration in non- segregated airspace of UAS in Europe Dipl. Phys. Mirsad Delić, Dr. Henk Hesselink Dipl. Ing. Frank Morlang,
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
1 Knowledge for Development 2 Ateneo de Naga University Mission:  Service of Faith that does Justice  Competence, Compassion, Conscience, Christ-centered.
Weather Satellite Data in FAA Operations Randy Bass Aviation Weather Research Program Aviation Weather Division NextGen Organization Federal Aviation Administration.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
B.PRADHAN,IAS CVO,AAI. Structure of Presentation  Background  Why need Next Gen ATS  What is Next Gen ATS  Benefits of Next Gen Systems  Conclusion.
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
© Ahmed El-Rabbany Ahmed El-Rabbany Geomatics Engineering Program Department of Civil Engineering RYERSON POLYTECHNIC UNIVERSITY Toronto, Ontario INTEGRATED.
Science and Observation Plans in National Projects (Philippines)
D EPARTMENT OF T OURISM Philippine Tourism: Gearing for More Fun and Progress.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Page Lufthansa ASAS It's Time for a paradigm change... Workshop May 2003, Rome
ASAS FRA OB/T ATM Projects Lufthansa point of view.
NextGen Current System Primary Radar – Creates blip on Radar Screen Secondary Radar – Aircraft encodes identifier and telemetry data VHF Radio – Voice.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Lecture 3: Air Traffic Control Tower
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
1 2 nd Australian based CGSIC Meeting Ground based Regional Augmentation System (GRAS) Keith McPherson, Manager GNSS.
EUROCONTROL European Organisation for the Safety of Air Navigation.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
2015 IFATCA regional meeting October 2015 Accra An Enabling Environment for Air Navigation Lindi-Lee Kirkman Manager Safety & Flight Operations Africa.
Air Traffic Management Master Plan IndII Objectives and Priorities Workshop – November 2011.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
A Technology Partnership for the New Millennium Anne Harlan, Director William J. Hughes Technical Center 68th NASAO Annual Convention September 20, 1999.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
September 2003 ATN Middle East Airlines CNS Developments in the Middle East Captain Ousama Balaa, Head of Technical Department Middle East Airlines.
Digital In The Skies Simon Daykin NATS Chief Architect.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
PREGINET: Advancing Research and Education Networking in the Philippines Denis F. Villorente 1st International Workshop on Networking.
Workshop on preparations for ANConf/12 − ASBU methodology
Regional RAIM Prediction System – Progress Report
World-Wide CNS/ATM Systems Implementation Conference
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
Drones and Autonomous Systems
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
Aircraft Owners & Pilots Association
PLANNED CITY EXTENSION
The Need for Modernisation of ANSPs
Presentation transcript:

Update on the New CNS/ATM Systems Development Project Andrew B. BASALLOTE, EE/MsCNS Asst. Director General Air Navigation Service Civil Aviation Authority of the Philippines e-mail: andybasallote@yahoo.com 15th Meeting of the Asia Pacific Economic Cooperation (APEC) Global Navigation Satellite System (GNSS) Implementation Team (GIT/15) Brisbane, Australia 13 - 17 June 2011

New CNS/ATM Systems Development Project Project Objective: to develop a dynamic & integrated CNS/ATM systems, using satellite technology, to enhance safety, reliability & efficiency of air traffic & airspace Project Description: The project covers the establishment of priority elements of the new satellite-based CNS/ATM systems at selected airports/sites nationwide to provide: Solutions to the shortcomings of the current CNS systems including: Radio coverage limitations Accuracy and reliability of the system Difficulties in wide area deployment of system facilities Limitations of voice communications Advanced Air Traffic Management (ATM) system that enables flexible air route selection in response to changes in weather and/or traffic conditions airport/airspace capacity Efficient and reliable data link communication systems to solve the inadequacy of existing voice communications resulting in reduction of workloads of ATC and pilots

Procurement Work Packages Automation System Package-2 Communications/Surveillance Sensors Items in the Package ATM Center Building ATM System VSCS AIS System AMHS/ATN GSMS MET System En-route SSR Terminal Radar ADS-B Ground Station VHF Radio Microwave Link VSAT Construction Period 30 Months December 2010 - June 2013 24 Months June 2011 - May 2013

ATM System ATM Center Building New Manila ATM Center Building Plant Building (Redundant UPS’s, Redundant Generators) ATM System covering the whole Manila FIR (34 ATC Workstations) Air Traffic Flow Management (ATFM) Air Space Management (ASM) Integration of ACC and 6 Radar Control Approaches Tower Workstations in the major airports(10) AIS Servers (Manila, Mactan) (2) AIS Workstations in the remote sites(63) VSCS (1) MET System (1) AWOS in the major airports (8) ATM Center Building

Air traffic management Laoag San Fernando Basco Tuguegarao Clark Baguio Subic Cauayan NAIA Manila ATM Center Plaridel ATM Workstation (36) Naga San Jose AIS Workstation (63) Caticlan Legaspi Busuanga AIS Server (2) Kalibo Roxas Tacloban TWR Workstation (10) Bacolod Iloilo Tagbilaran Mactan Puerto Princesa Dumaguete Butuan Zamboanga Cagayan de Oro Dipolog Davao General Santos Jolo Cotabato

CommunicationS Laoag RCAG/SSR Laoag Basco Aparri RCAG/SSR San Fernando Clark Tuguegarao Baguio Subic Cauayan Manila (NAIA / ATM Center / AFC/ HQ) Plaridel Tagaytay RCAG / SSR VSCS Naga San Jose VSAT Hub Station (2) Caticlan Busuanga Legaspi Kalibo Radar VSAT Remote Station (40) Kalibo Roxas Tacloban AMHS Server (2) Iloilo Bacolod Mt. Majic RCAG/SSR AMHS Workstation (47) Puerto Princesa Mactan (Tower/AFC/Radar) Dumaguete En-route VHF (26) Palawan RCAG/SSR Tagbilaran Butuan Zamboanga Terminal VHF (32) Cagayan de Oro Zamboanga RCAG/SSR ATIS VHF (8) Davao Basilan Jolo Cotabato Davao RCAG/Radar Microwave Link (20) Dipolog General Santos

NAVIGAtioN Manila (ATM Center) Global Navigation Satellite System (GNSS) Signal Monitoring System

SURVEILLANCE Pasuquin Aparri Clark Tagaytay NAIA 1 NAIA 2 ATM Center Quezon, Palawan Mt. Majic Zamboanga Tagaytay Clark NAIA 1 ASR/SSR (5) En-route SSR (5) ADS-B (2) Existing Radar (3) Davao Kalibo Mactan Bacolod NAIA 2 Puerto Princesa ATM Center

Existing En-route Radar Coverage New En-route Radar Coverage Laoag Tagaytay Mt.Majic Aparri Mt. Majic Palawan Zamboanga Davao Existing En-route Radar Coverage New En-route Radar Coverage

MET Clark NAIA Manila (ATM Center) Caticlan Bacolod Kalibo Iloilo Mactan WAFS RX MTSAT RX Davao AWOS (8) MET Database