Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai – 400 085.

Slides:



Advertisements
Similar presentations
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Advertisements

CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
5 Feb 2002Alternative Ideas for the CALICE Backend System 1 Alternative Ideas for the CALICE Back-End System Matthew Warren and Gordon Crone University.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
CKM Data Source System CKM Electronics Group July 2003.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
OPERA TT MEETING BRUSSELS, April 11, 2003 Status of the OPERA DAQ Status of the OPERA DAQ D.Autiero, J.Marteau T.Descombes  informatics S.Gardien, C.Girerd,
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Kchip: A Radiation Tolerant Digital Data Concentrator chip for the CMS Preshower Detector 9 th Workshop on Electronics for LHC Experiments Amsterdam, Sept.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Progress report of new PHENIX pilot chip Hiroyuki Kano (RIKEN) 1. Overview 2. Digital pilot ASIC and test board 3. Functionalities and test result 4. GOL.
System Bus.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – TOTEM Front End Driver VME64x Host Board OptoRX Firmware.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
09/09/2010 TDAQ WG - Louvain 1 LKr L0 trigger status report V. Bonaiuto, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti, F. Sargeni, F. Scarfi’
1 Back-Of-Crate : BOC Status Oct, 2002 BOC is the optical fibre interface for the ROD Receives module control data from ROD, performs clock-data encoding,
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
CHEP 2010, October 2010, Taipei, Taiwan 1 18 th International Conference on Computing in High Energy and Nuclear Physics This research project has.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
The Data Handling Hybrid
AMC13 Project Status E. Hazen - Boston University
The Jülich Digital Readout System for PANDA Developments
Pid session TDC-based electronics for the CRT
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
CCS Hardware Test and Commissioning Plan
Data Aquisition System
Status of the DHCAL DIF Detector InterFace Board
HCAL Data Concentrator Production Status
Sheng-Li Liu, James Pinfold. University of Alberta
ECAL OD Electronic Workshop 7-8/04/2005
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Example of DAQ Trigger issues for the SoLID experiment
The CMS Tracking Readout and Front End Driver Testing
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –

Preshower in CMS Structure

~2.49m MB TYPE2 MB TYPE3 MB TYPE1 MB TYPE0 K Chip Total 124 x 4 = 496 Mother boards Preshower Disc ( 1 of 4 )

Preshower Readout & Control Architecture ES-DCC Optical Receivers Spy Memory Data Reduction Algorythms, Formatting Optical Readout Path FEC Module Optoelectronics Link Controller processor CLK & T1 logic TTCrx TTCvi module Front End Readout ASICs Front End Control ASICs Control Path ClkLV1I2CI2C DCU IVIV I2CI2C CCU Slow Control & Fast Commands Re Subdetector Event Builder K chip PACE ADC Fast Timing Slow Control System Motherboard GOH DOH (Digital Opto-Hybrid) (Gigabit Opto-Hybrid) ( S-Link) Role of Opto-Rx12 Module Mbps To Local DAQ

Role of Opto-RX12 Data Rate : 1208 Optical data 800Mbps each = 1Tbps Data Rate : 1208 Optical data 800Mbps each = 1Tbps Only 2% occupancy (useful data) Only 2% occupancy (useful data) Opto-Rx12 Module : Opto-Rx12 Module :  Receives data from 12 optical lines  Implements Data Reduction Algorythms in an FPGA Several Opto-Rx12 modules would be plugged into a VME-based readout system, which will send the reduced data (Events) to CMS DAQ. Several Opto-Rx12 modules would be plugged into a VME-based readout system, which will send the reduced data (Events) to CMS DAQ.

Opto-Rx12 Revision 1 FPGA with embedded De-serializers (Altera 1SGX40GF1020) 12 channel Optical Receiver (NGK- POR10M12SFP) Connector for 12 Fibre Ribbon 115mm 75mm 5 PMC connectors (280 bit I/O bus)

Opto-Rx12 Evaluation Setup Pattern Generator - Generates 12 optical serial streams Host Board - Provides space for Opto-Rx12 plug-in - USB interface

Opto-Rx12 Evaluation Setup

ECIL’s Quotation to CERN ► Unit Price : 1100 CHF for Quantity of 150 Nos. ► Includes:  Fabrication, Assembly and Testing of Opto-Rx12  Cost of Components except Optical Receiver (NGK’s POR10M12SFP) ► CERN must provide:  Optical Receiver Chips  Complete Test Setup including boards (2 sets), firmware, software and documentation

Challanges ► 14 layer PCB ► BGA soldering ( > 1000 balls) ► Testing/ debugging (?)

Current Status: Opto-Rx12 Module Revision 3 Bigger FPGA (Altera EP2SGX60EF1152C5N)

Changes in OptoRx Rev 3 Linear Regulators Linear Regulator replaced by Switching Regulator on an adaptor PCB

Opto-Rx12 Test Setup (Final ?) Host Board Opto-Tx8 Module Opto-Rx12 Rev. 3 Optical Splitter 812 USB Port LEDs Switches

Many Thanks

OptoRx Module Revision 1