MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Advertisements

Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Controls and Monitoring Implementation Plan J. Leaver 03/06/2009.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Computing Panel Discussion Continued Marco Apollonio, Linda Coney, Mike Courthold, Malcolm Ellis, Jean-Sebastien Graulich, Pierrick Hanlet, Henry Nebrensky.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
Target Control Electronics Upgrade 08/01/2009 J. Leaver P. Smith.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Controls & Monitoring Schedule J. Leaver 02/11/2009.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
SOFTWARE & COMPUTING Durga Rajaram MICE PROJECT BOARD Nov 24, 2014.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
Imperial College Tracker Slow Control & Monitoring.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
HPS Online Software Discussion Jeremy McCormick, SLAC Status and Plans.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Control & Monitoring System Update Contributors: Brian Martlew - Daresbury Laboratory - STFC James Leaver - Imperial College Pierrick Hanlet - Fermilab.
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.
MOG Aug 2010J.S. GraulichSlide 1 Comments on User Run o All went pretty well but we can always improve Jean-Sebastien Graulich, Geneva.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Controls & Monitoring Status Update J. Leaver 05/11/2009.
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
1 Configuration Database David Forrest University of Glasgow RAL :: 31 May 2009.
Configuration Database David Forrest University of Glasgow.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Jean-Sebastien Graulich, Geneva
Database High-Level Overview
Controls & Monitoring in MICE
Presentation transcript:

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien Graulich, Geneva

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 2 DDAQ Achievements since CM24  DAQ and Controls Review  Factor of 5 increase in # of particle triggers per spill Current limit at 250 Particles/spill  FADC Firmware upgraded Factor of 4 reduction in data size  Trigger System Debugged  Problem with Event building under control

Important Discussion  Double pulse resolution in TOF  Discriminator dead time Minimum width of logic signal after discriminator: 100 ns  Double pulse resolution: 110 ns In a given TOF PMT, it is IMPOSSIBLE to see two hits in the same burst !  Complying with specifications but a real limitation  We need a way to tell monitor the number of particles in a burst Use BPM ? Use Tracker ? Upgrade TOF discriminators ? MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 3

DDAQ Main Works in progress  Integration of TOF2 Requires update in Crate Layout  Integration of CAM/DDAQ DATE Status in EPICS Target DAQ Beam Losses and Target BCD in data stream Magnet Currents (and more) in Data Stream  Integration of Tracker  EMR Front-End Electronics MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 4

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 5 Schedule Milestones  From CM24  TOF2 Shaper/Splitter Productionmid March need testing  DAQ review June 09  Upgrade of fADC firmwareJuly 09  CAM data in Online Data StreamJune 09 -> Jan 10  Tracker integrated in DAQ and OLMJuly 09 -> Jan 10  TOF TDC Clock SynchronizationJuly 09 -> March 10 More complicated than first thought. Need a dedicated board  Burst Gate Signal in the Trigger SystemNeed support here  Approval of SW/EMR Front End ElectronicsIn Proto phase  Production of SW/EMR Front End ElectronicsSept > Jan  DATE Status in EPICSNov 09  TOF2 DAQ InstallationDec 09  Target DAQ in Data StreamDec 09

Controls And Monitoring  Good progress on all fronts Groundwork required to unify MICE control systems & create a user-friendly interface is well underway  Controls effort is ‘significantly understaffed’ (DAQ & Controls Review, June ‘09)  We are always operating at full capacity  ‘Controls & Monitoring’ is such a broad subject that many unexpected additional requirements crop up all the time… Please be patient! MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 6

CAM Main Achievements since CM24  Control PCs & servers Reorganization DL Systems isolated on a single server  Application management Tools created including GUI  New Target Controller Set delay, dip depth, etc  Target DAQ software and monitoring completed Standalone and Interfaced to EPICS (need integration in DDAQ)  EPICS gate way running  CKOV Humidity and Temperature into CAM  Neutron Monitor into CAM  Alarm Handler working and becoming user friendly  Clear Plan for Version Control and System Update  Interface with Configuration Database MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 7

25/08/2015Imperial College 8 Control PCs & Servers: Current Status miceiocpc1target1ctlmiceioc2miceioc4miceioc1miceioc5 miceserv1miceecserv miceopipc1micecon1target2 See James’ Talk for details

25/08/2015Imperial College 9 Application Launcher New application launcher replaces DL TCL script –XML configuration file, easy to add items –Unlimited subcategory levels Provides real-time display of application status Configurable response to existing application instances

25/08/2015Imperial College 10 Target: Controller Target Controller Stage 1 upgrade underway –Hardware essentially complete –Currently working on Controller firmware (P. Smith) Software nearing completion –Hardware driver framework in place –Have implemented all EPICS server / client functionality Tested using ‘virtual’ Target Controller Device –Remaining task: write low- level hardware driver plug-in once firmware is complete Stage 1 upgrade - Control functionality includes: -Set delays -Set / monitor Target depth -Park / hold, start / stop actuation -Monitor hardware status

25/08/2015Imperial College 11 Target: Beam Loss Standalone DAQ system upgrades: –Final algorithm selected for ‘absolute’ beam loss calculation Thanks to AD for implementation –Standalone event viewer can now follow real-time output of DAQ Target Beam Loss IOC will read local data archive written by DAQ & serve values as PVs –Enables integration with Alarm Handler & readout of actuation numbers for CDB run data entries –IOC will use same analysis & file access code as standalone DAQ, via C wrapper functions –See PH’s talk

EPICS Gateway

Policy for CAM System upgrades Jean-Sebastien Graulich Next Update in January !

CAM Main Works in Progress  Network Status  DATE Status  Environment Monitoring (temperatures, humidity, water flows,...)  CKOV High Voltage System (CAEN SY127)  Quotation for Cooling Channel Control System (DL) MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 14

DataBase  Configuration Data Base Doesn’t Store Data Doesn’t Archive the parameter read values Store the Geometry, Calibration Constants, Set values, etc  Use Case example: Give me the configuration of the experiment at 16:15 on 5 th November 2009 Needed by reconstruction software to analyse the data  Relational AND bi-temporal. Please see previous collaboration meeting talks for a fuller explanation of this concept and its justification. MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 15

Database Functionality 2 Since the last collaboration meeting there has been much progress Geometry - Can now write and read geometries - We can reconstruct what the geometry was known to be for a given time. We have a history of state. We also can update when misalignments are found. We have a history of those updates. You can reconstruct what was KNOWN about the state of the geometry at some set of given times, very easily. Calibration - Can now write and read calibrations of arbitrary format - One default calibration should be maintained by the detector groups but others can be kept and called specifically Set Values - Can now write and read set values - EPICS GUI (James Leaver) interfaces with this. Thanks also to Pierrick & Adam for help with cataloguing many set vals.

25/08/2015Imperial College 17 Configuration Database: User Entry Not all parameters required for a CDB ‘run’ entry are available through normal EPICS channels –i.e. Relevant IOCs & integration with the DAQ are not yet complete –Currently only beamline magnet currents can be backed up from ‘live’ servers (Quasi) temporary solution: –Generic EPICS data server hosts PVs for all values missing from existing IOCs, so they can be read by backup/restore client –User entry client allows shifter to enter required parameters before initiating a run –As future work progresses, unnecessary user entry items will be removed However, shall always require some degree of manual data entry CDB Data Server (miceiocpc 1) User Entry Client Backup / Restore Client

Summary Database is progressing well Wish to finish database functionality and perform stress tests which could be presented at CM26 Nevertheless, people should think about integrating DB communication with their applications (contact me for info – but this is an action item for others)

Bottom Lines  General Progress  Manpower is very limited and not secured on the long term  More and more integration/unification tasks Mice Online Group (MOG) is necessary but suffers from a loose leadership This is a call for help ! MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 19