Duncan Cross Deputy Director Operations London Overground & Crossrail Crossrail The First Interconnected CBTC Railway in the UK.

Slides:



Advertisements
Similar presentations
2009 Priorities & issues John Dickie Crossrail 2 Supporting London’s growth.
Advertisements

TravelWatch SouthWest MetroWest - from concept to delivery James White 4 October 2014.
Center for Strategic and International Studies – CCS event 31 st March 2008 Rachel Crisp Deputy Director, Cleaner Fossil Fuels Unit, Energy Group.
Public Conference 16th December 2010
Capital Investment Program Listening Session Presented at APTA Annual Meeting -- 10/03/2012 RailVolution /14/
Metro Today, Main Line Tomorrow Malcolm Dobell, Head of Train Systems Kate Whelan, Lead Systems Performance Engineer SUP ATC.
UK GROUP London: Actions and Evaluations. Introduction Main Themes; Governance; Housing; and Transport.
1West of England Area Rail Studies - David Crockett 08/02/2012 West of England Area Rail Studies Outline Summary This presentation summarises the work.
Enhanced analytical decision support tools The Scheme level Final workshop of the DISTILLATE programme Great Minster House, London Tuesday 22 nd January.
 PRASA’s Strategy identified short, medium and long-term interventions to improve rail services in the country.  PRASA identified operational interventions.
The vital new artery to ease pressure and seize the opportunities surging daily in our premier world city Tomorrow’s Rail Michele Dix 08 July 2015.
Delivering Crossrail’s Ambitions Terry Morgan CBE FREng Chairman, Crossrail.
Cross London Rail Links Ltd. Crossrail the Challenge Keith Berryman 20 December 2005.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Overview System modelling and holistic simulation :
1 Developing the MBSE Approach Tony Ramanathan Principal Engineer Network Rail.
Transport for London London Overground Southwark Rail User Group Monday, 17 th November 2008.
A Recipe for Success in Implementing CBTC on an Operating Transit System Presented by: Dr. Alan F. Rumsey, P.Eng, FIRSE March 12, 2014 Communications-Based.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 9 - The TOCs and Network Rail.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
Access for All programme – an overview. Slide 2 Background Disability Discrimination Act 1995 (DDA) requires all station operators to take reasonable.
18 September Licensing for Next Generation Signalling Buddhadev Dutta Chowdhury 27 th April 2012.
The Birmingham Gateway Project: Feasibility and implementation of CHP Azhar Quaiyoom.
1 “Old fashioned” problem solving in a modern railway RSA- 08/01/14 Jo Kaye.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
Carbon Capture and Storage Shell Exploration & Production Carbon Capture & Storage Regulatory Principles 18 h November 2008 Energy Delta Convention.
Powering Network Rail with the Oracle Business Intelligence Platform
Railway Infrastructure Financing and PPPs November 2015.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
Crossrail 2 London Assembly Regeneration Committee.
Study on Regulatory Options for Further Market Opening in Rail Passenger Transport Stakeholder Meeting 10 February 2010 Session 2B Great Britain Case Study.
Crossrail: Station Accessibility Matthew Lodge 10 July 2013.
/18-Feb-161 Response of Surface Access Providers – Network Rail Chris Rowley, Principal Strategic Planner (L&SE)
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
Demonstrating Digital Railway
ERTMS Strategy Group Agenda Item 3 – Key Strategic Issues 11 th April th April 2006.
HIGH SPEED RAIL ASSESSMENT NORGE
Provisional view of the Procurement Strategy Phil Bennett Commercial Director.
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
Land Transport Infrastructure Integration. TfL’s purpose Meet the rising expectations of our customers and users Plan ahead to meet the challenges of.
November 30 th London/Spain Webminar: Railway Infrastructure in the UK Spanish construction and railway industry 1 Jim Steer Director & Founder, Steer.
1 Tunnel –v- Surface Routes A UK perspective from Alan Dyke Former MD Channel Tunnel Rail Link Project.
Wellingborough SUE’s Julie Thomas Head of Planning and Local Development.
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
RINA & SINTEF Assessor på et grenseoverskridende prosjekt, Femern del2 Thor Myklebust Sertifiseringsleder, SINTEF : 00 – 14: 15 Sikkerhetskonferansen,
Inquiry on High-Speed Railways High-Speed Railways – social infrastructure for stronger development and competitiveness SOU 2009:74.
// Eating the Elephant ETCS Requirements for GB railway.
Infrastructure Ontario
Transition Readiness Event – Background Reading May 2016
High Speed Rail Some Development Principles
Sharing Project Lessons
MetroWest Phase 1 James Willcock.
Our plan for new river crossings for London
Train Performance Challenges
Sir Terry Morgan CBE Chairman, Crossrail
The Implementation Experience of CTCS-3 Train Control System and the Implication of “Go Global” of China High-speed Railway Good morning. October 2017.
Western Orbital Local Liaison Forum 11TH September 2017.
Step Free Access Programme
ATO over ETCS Benoît BIENFAIT 10/2/2016.
Delivering East West Rail
Kent Route Study – Draft for Consultation
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
Delivering the North East Chelmsford Growth Ambition
Trans Wilts Conference
Presentation transcript:

Duncan Cross Deputy Director Operations London Overground & Crossrail Crossrail The First Interconnected CBTC Railway in the UK

Agenda What is Crossrail Route Key Features – Connections, Key Dates Current work The signalling challenge Specification Interfaces with other systems Future Challenges Bringing Crossrail into service

What is Crossrail New railway under Central London, linking Liverpool Street and Canary Wharf in the east with Paddington in the west. Operates over the wider United Kingdom rail network Required an Act of Parliament to give powers to acquire land and construct the new railway £15.9 billion project budget for construction £2 billion for a new depot at Old Oak Common and a fleet of new trains Complex funding arrangement, with both Transport for London and UK Department for Transport as sponsors Central Government funding Business rate increases Money from third parties

Crossrail Route

Key Features Major new tunnel connecting Paddington in the west to Stratford and Abbey Wood in the east 10 new stations (all connected to other transport networks) New maintenance depot and train stabling facility at Old Oak Common in West London financed by TfL through a concession arrangement 70 new trains, financed off balance sheet by TfL through a concession arrangement £2.3 billion of works by Network Rail on existing railway funded through a user charge back to TfL for Crossrail services

Crossrail – Connecting the Capital

Project Key Dates Design and specification 2008 to 2012 Construction 2011 to 2018 Rolling Stock contract – 2014 Appoint operator - Sept 2014 Operator starts services on existing routes - May 2015 New rolling stock delivery commences Testing and Commissioning Trial Operations Stage Opening – 2018 to 2019

Ground breaking construction

The Crossrail experience

Signalling Challenge 24 trains per hour in each direction in the peaks Perturbed capacity of 30 trains per hour in each direction Interface with platform edge doors (PED) as platform dwell times are critical to the successful operation Interface with tunnel ventilation system, Provide outputs to the performance analysis system on train running data Complex and changing interfaces with neighbouring networks

Interfaces with Other Rail Systems Pudding Mill Lane Portobello Junction Abbey Wood

Interface Requirements Interfaces with Network Rail Infrastructure at Pudding Mill Lane, connection to the Great Eastern Main Line from Liverpool Street Station in the East with a standard Multiple Aspect Signalling (Track Circuit Block) system with UK train protection warning system (TPWS), later full ERTMS level 2, post 2025 Portobello Junction outside Paddington, connection to the Great Western Main Line, interface Multiple Aspect Signalling (Track Circuit Block) with Automatic Train Protection then by 2017 with ERTMS Level 2, initially as an overlay then fully supervised, but with un certain cutover dates Abbey Wood on the South Eastern branch of Crossrail with a proposed non signalled connection for engineering access purposes only.

The CBTC Decision Proven technology – where is a system operating today Deliver the train service specification (24 / 30 TPH) Ability to interface with platform screen doors and other operational systems Not be at the technological cutting edge – Crossrail is too large a project to be a test bed

Simple Solution? Crossrail is tailor made to a CBTC signalling solution BUT Crossrail is an Interoperable Railway AND CBTC systems are not currently compatible with Technical Standards for Interoperability

Derogation Required UK sought a derogation against the Co-Co Sig TSI from the EU for a CBTC installation in the Central Tunnel Section of Crossrail as opposed to looking for an ECTS option from service commencements. Derogation granted in late 2011 with one big caveat. We agreed with the EU as part of the signalling contract, the successful supplier will provide a migration plan to move from the CBTC system to ECTS Level 3 TfL as Infrastructure Manager for the Central Tunnel Section will determine when the changeover will take place.

What Does it Mean for Crossrail Allows Crossrail to go with its preferred CBTC option to meet the service introduction date of Dec 2018 Removed the risk associated with being the first to develop a Level 3 solution for a metro application Migration plan will outline the steps and work required to move from CBTC to ETCS L3 Migration will only take place when there is proven technology available, which meets the train and system performance requirements to allow a seamless changeover between the two systems Someone else will have to go first

Challenges for the CBTC System Interfaces with other systems – Crossrail is not a closed system like many traditional CBTC applications Interfaces change over time so needs to be adaptable Ability to work with ventilation systems for the tunnel section an additional layer of capacity restriction Future adaptability to ETCS L3 opportunity for CBTC suppliers to develop L3 compatible systems

Opening Stages 0 and 1: Dec 2015 – May 2018 Crossrail TOC operating on the Great Eastern: migrate rolling stock from Class 315 to Class 345 in 2017 NR Signalling from Liverpool St IECC. NR Route Control at Romford ROC and CTOC arrangements are yet undetermined GE train service regulated 'as now'. IECC CTOC Control TBD GW Route Control (Swindon) GE Route Control (Romford ROC) RCC Under Fit Out 15 TPH

Opening Stage 2 : May Dec 2018 Dec Crossrail TOC operating on both the GE and GW. Signalled from Liverpool St IECC and Didcot (TVSC) NR Route Control at Romford (GE) and CTOC to be determined. Both railways regulated 'as now'. IECC CTOC Control TBD GW Route Control (Swindon) GE Route Control (Romford ROC) CBTC RCC Supporting T+C Trial Running and Trial Operations CTOC Control TBD 4 TPH 15 TPH

Opening Stage 3: Dec May months of dynamic testing/trial operations, to commission Crossrail tunnels. Capability for CTOC Route Control (CIS / PA / Security) of Great Eastern and Great Western migrates to Romford RCC. GE, GW and COS all operated as 3 distinct train services, however interfaces with NR routes will be commissioned and operable for movement of ECS. GE and GW railways regulated 'as now'. COS with dedicated timetable / rule set to support the ATR / headway regulation. IECC RCC (Romford) GW Route Control (Swindon) GE Route Control (Romford ROC) CBTC 4 TPH 15 TPH

Opening Stage 4: May Dec 2019 Through running of GE services to the COS. GW operates discrete service. Effectively run 2 separate traffic flows 12 trains per hour Paddington to Abbey Wood 12 trains per hour Paddington to Shenfield (plus 4 trains per hour between Gidea Park and Liverpool Street) Late running mitigated by decision support software leading to service manipulation in COS or intervention on GE; coordinated from Romford RCC IECC RCC (Romford) GW Route Control (Swindon) GE Route Control (Romford ROC) CBTC 4 TPH 18 TPH 24 TPH

Opening Stage 5: Dec 2019 Onwards Full Crossrail service in operation, all interfaces in full operational use. 'Regulation Strategy' will balance 3 inter-related train services. Ability to both present and accept trains right-time at interfaces key. RCC co-ordinates overall service (inc GE for GW) re presentation. Single line at Heathrow and 2 platforms at Abbey Wood create constraints on service patterns. IECC RCC (Romford) GW Route Control (Swindon) GE Route Control (Romford ROC) CBTC 18 TPH 10 TPH 24 TPH

Post Commissioning Network Rail will deploy Traffic Management on Great Eastern Main Line Timing 2019 for Liverpool Street IECC Migration. Interface specification to reflect ‘shared data’ for predictive train running algorithms from each side of the interface – a single source of truth. GW NR TMSGE NR TMS CBTC RCC (Romford) Romford ROC Other Region Other Region GW Route Control (Swindon) 10 TPH 24 TPH 18 TPH

Post Commissioning NR Deploy TM on GW Timing uncertain. Interfaces as per GE GW NR TMSGE NR TMS CBTC RCC Romford Romford ROC Other Region Other Region Didcot TVCS 24 TPH 18 TPH 10 TPH

Post Commissioning Crossrail becomes a ‘sub-set’ of wider TM network. Would require an enhanced ‘bespoke’ interface between NR TMS and Crossrail CBTC. Impacts on RfL responsibilities (re regulatory framework) and Operations Concepts (decision making and operational hierarchy). Retain some functionality specific to Crossrail CBTC and wider COS; passenger movement at stations critical and some autonomy is still required. Development and deployment risk is relatively high and outside timescales. GW NR TMSGE NR TMS CBTC Romford ROC Other Region Other Region Didcot TVCS 10 TPH 18 TPH 24 TPH

Post Commissioning Crossrail has a commitment to adopt ETCS level 3 (+ATO) when available and risk tolerable. All regulation elements of the CBTC specification would not necessarily be replicated and therefore need to be provided through a second system. The regulation functionality may be provided through an interface with NR TMS, however further work would be required to understand any gaps. GW NR TMSGE NR TMS ETCS (Level 3) Romford ROC Other Region Other Region Didcot TVCS 10 TPH 18 TPH 24 TPH